Product Description:

DF900D Nose-girder Positioning  Beam Launcherf (DF900D BL for short)develop by us is one of our NDF’s advanced equipments specialized for erecting Class 900t Railway Box-girder Bridge.

With high manufacturing quality, it was developed and improved on the base of our DF900 simple-span type Lauching Girder and desiged with many excellent features by absorbing advantadges of same purpose equipments at home and abroad.

Applicable Scope

   DF900D Launching Girder is used to erecting Railway Precast Concrete Box-girder Bridge with span up to 32meters and weight up to 900tons.  For bridge type, it often used to  erect Double-track monolithic box- girder Bridge, and can meet  different span-beams’ erection (like 32m,24m and 20m) in one project.

   Besides the normal operation, it perfectly meets the needs to erect first-span and last-span beams and can be operated and exchange flexibly between many different construction conditions. And transported by our Elevating Transporter(ET), it can be moved from one place to another and pass through tunnels.


(1)Main Technical Specification:

&#61550   Work Rank: A3

&#61550   Hoisting Capacity : 900t

&#61550   Applicable Span: 32m,24m and 20m

&#61550   Anti-hoisting Impact Factor: 1.05

&#61550   Max. Hoisting Height: 7.2m

&#61550   One-span Forward Moving Speed:0~3.0m/min

&#61550   Factor of Safety Against Overturning:≧1.5

&#61550   Applicable Longitudinal Gradient:≤2.0%

&#61550   Applicable Curve Radius:≥600m

&#61550   Walking Speed of Beam-hoisting Trolley:0~3m/min

&#61550   Hoisting Speed of Beam-hoisting Trolley:

   Heavy Load:0~0.5m/min

  Idle Load:0~1.0m/min

&#61550Beam-hoisting Trolley:

              Transverse fine adjustment Speed :0~5.0mm/s

              Transverse fine adjustment Scope:±250mm

              Longitudinal  fine adjustment Speed:0~5.0mm/s

              Longitudinal fine adjustment Scope: ±250mm

&#61550   Max. Deflection Of Nose-girder:61.5mm

&#61550   Average Beam-erection Speed:2spans/8hours

                                       (totally about 8 kilometres long)              

&#61550   Dimension(Length× Width ×Height):

      1) Whole Machine Overall Dimension:

             Under Working:59.3m×17.1m×12.1m

             Under Transporting:65.5m×17.1m×13.1m

                                  (includes Dimension of itsTranporter)

     2)Max. Part Dimension while transported:11m×3.3m×2.3m

                                  (referring to Nose-girder Main Girder)

&#61550   Weight:

     1) Whole Machine Weight:525tons

     2) Max. Part Weight while transported:27tons

&#61550   Power Source:380V 4Ac

(equiped with 300Kw Diesel Engine)

&#61550   Drive mode:Hydrocylinder driven by Hydraulic

                           Station and other parts by electric motor

&#61550   Control mode:  By control cab and wireless remote control (2) Suitable working condition

   a. Max.working Altitude: ≤2000m

   b. Ambient temperature:-20C°~+ 50C°

   c. Wind power:working≤6 grade,non-working≤11 grade.

   d. The abutment supporting the Launching Girder should be level and  Project Site againsts dangers of flammability, explosive and corrosive gas.

   e. Designed with enough light to meet nighttimes working





Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How many cubic meters of concrete is mixed with concrete mixer?
Js5001/750/1000/1000/1500/2000/3000/3000 concrete mixers and concrete mixers Depending on the model, you can determine a 0.75 square plate of 0.5 square 750 for the 500 The smallest drum mixer is 0.3 square
Q:What are different kinds of ways of losing weight w/o using machinery?
Aerobics would be like doing PT. It is great cardo exercise and burns calories and fat, would highly recommend it if you are in good health. Might check with your Doctor first to be sure you can, because it does give the heart a good workout.
Q:Kenmore front loader leaking?
Depending on how long you have had it and what the warranty is you can probably get it fixed for free or for cheap! I had the same problem with ours leaking and we just had to replace the rubber seal :) Good luck! I would get a pro to come do it. I used a local small appliance store/repair.
Q:What is the role of concrete in the material?
Since the emergence of Portland cement in the 1920s, the concrete used in it has the strength and durability required for engineering and is easy to obtain, low in cost, especially low in energy consumption,
Q:how do you set the time clock on kobelco excavators?
I do not have a kobelco excavator and the dealer ought to have the answer to this question.
Q:What are the preparations for the piling site?
1, the pile position determination: according to the project provided by the construction unit and the pile axis location map of pile location, pile location must be accurate, and in the pile position by a soldering iron drilling, hole depth is 15~20cm, filled with lime, prevent in the process of driving the wrong pile.2. Pile up(1) pile stacking shall be determined by pile driving route and pile driving sequence(2) the site shall be level and level with three passes and one leveling. Remove obstacles in the ground, underground and air in the range of the moving of the pile driver. The wooden posts and the pile rings shall be of the same position, except for the contact between the pile and the pile, and nothing else shall be in contact with the pile so as to prevent cracks in the pile.(3) the strength of reinforced concrete precast piles must be up to 100% before they can be transported and piled3, the selection of pile machineAccording to the design of single pile bearing capacity and pile length, this project intends to use hammer weight 2.5t track type diesel pile driver.
Q:What is the difference between these AMD processors?
The 8120 and 8150 are the first octo core based on the original Bulldozer chipset. The 8350 is a revised Bulldozer CPU that introduces a performance upgrade. The 6300 is a 6 core variant that is similar to the 8350 but with 3 modules instead of 4.
Q:What is the difference between dry mortar and ready mix mortar?
2, dry mortar, also known as dry mortar, refers to the production by a professional manufacturer, from cementing materials, aggregates and admixtures by a certain proportion of a mixture of granular or powder mixture.
Q:when will the new amd bulldozer processors will launch?
They were supposed to be out on the 7th, almost a week ago. Instead, release was delayed until about September-ish due to performance issues. According to AMD, they needed to increase the clock speed so they could compete with Sandy Bridge. According to a benchmark from someone that got their hands on one of the 8 core models and tested it (may not be real but it looks real) it actually fell short of the performance of Phenom II X6. So, expect September but don't hold your breath. I tried to find the video I watched of the benchmark tests being run but I can only find the confirmed fake benchmarks from May that show it outperforming the i7-2600k. There will be more bulldozers after the initial release, some of them with 10 cores. Intel will also be releasing a new enthusiast line (for $1000-ish) later this year including some 8 core models on... of course... a new motherboard socket and chipset. Then there is Ivy Bridge coming out sometime in the first half of 2012 featuring 3d transistors and a 22nm geometry. It will work on the current LGA 1155 socket but, oh of course, needs its own chipset. At least with the bulldozer you can already buy a motherboard that will support it along with Athlon II and Phenom II.
Q:Will Israel get off of Palestinian land or will bulldozers be the part of the Peace?
Palestinians are group of people originated from different arab countrys. they have enough countrys to go and live their life as bourgeois class, but being kept in this level of povery (mainly) by the Palestinian's leadership. (yes, a part from that comes from the Israelis as well) Jews have only one (small) country - Israel. there is no country there called Palestain right now, Perhaps in the future.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range