DELIVERY CYLINDER(SANY ) I.D.:DN195 CR. THICKNESS :0.25MM-0.3MM LENGTH:1570MM

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
2 pc
Supply Capability:
1000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

Packaging & Delivery

Packaging Detail:wooden case, seaworthy packing
Delivery Detail:15 days

Specifications

Concrete Pump Delivery Cylinder DN230*2100
1. Capacity: 60,000~80,000cbm
2. Size: DN180, DN200, DN230..
4. Brand: PM, Sany,ZM

 

1. Material: C45

2. quenching and tempering to improve the hardness to HB241-280

3. inner wall chrome thickness is 0.25-0.30mm, hardness HV820-900. 

4. Brand: SCHWING, PM, SANY, KYOKUTO, CIFA

5. Capacity: 60,000~80,000cbm

 


Concrete Cylinder
MaterialHigh Manganese Steel
SpecialCoating hardness layer in the internalwall
ApplicationIn concrete pump trucks
For BrandSany,Putzmeister,Schwing,,Zoomlion,CIFA etc
Details information
BrandModel


219 - DN180*1775-1600
SchwingBP3000219 - DN200*1775-1600


254 - DN230*2125-1800


DN230*2300mm

DN230*2100mm
PutzmeisterDN230*1600mm

DN200*1600mm

DN180*2000mm

40C1410206-DN180*1530-1400

50C1410210- DN180*1545-1400

60A1406219- DN195*1570-1400
Sany60C1416226- DN195*1570-1400

60C1816232- DN200*1946-1800

C120/37A232- DN200*2162-2000

C120/48262- DN230*2146-2000

62EA203-DN 180*1605-1400

62G219-DN200*1187-1000

62D219-DN200*1587-1400
Zoomlion62H219-DN200*1787-1600

62CA219-DN200*1862-1600

62M219-DN200*2022-1800

0019931A219-DN200*2022-1800

62L

245-DN205*2284-2000




Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the skills of concrete pump?
In the process of pumping concrete, with the increase of pump pressure, pump impact force will force the tube to move back and forth, this is not only the loss of pumping pressure, and connecting parts between the pump in shock and intermittent tension state, can lead to premature damage, and rubber pipe cement slurry overflow, therefore must be fixed the pump
Q:How much is the pump for a month?
Excluding oil costs, each side of the soil about 0.5 oil (Sany E series pump), the 7000 sides will be about 3500L oil X7.33=3 yuan, remove the wages of workers (4 per person 5000=2 million)
Q:What is the farthest pumping distance of concrete pump truck?
Now the domestic pump to achieve the highest pump height, the largest is ZOOMLION made 80 m carbon fiber boom pump, but also to achieve the pump Guinness world record
Q:What do these types of concrete pumps mean?
Concrete conveying pump HBT80-18-16: according to the national standard "GB/T13333-2004_ concrete pump"
Q:What is the second generation pumping technology of concrete pump?
The whole hydraulic control technology delivery pump has no constant pressure pump, no PLC in the control box, no nitrogen gas storage tank and no close switch at the water tank. The structure is simple, and the maintenance cost is greatly reduced.
Q:Is the main pump of the concrete pump electric control or hydraulic control?
General Separated and Closed Open Electromagnet Control Displacement (Current)
Q:What is the difference between concrete pump and ground pump?
The pump is actually the day Linuo arm frame of concrete pump boom is known, a few day, after mixing through the boom pump, the efficiency is very high
Q:When concrete is poured, how high can the concrete pump be put?
The car pump arm is long, traffic roads, the required pump stop position is bigger, so there are a lot of the site can not be use pump more than 60 meters (60 meters of general automobile pump, stop the pump and the leg position width of about 14 meters)
Q:How to operate the concrete pump?
All the bolts of the pumping unit shall be fastened, and the pipe joints shall be tightly sealed. The protective devices shall be complete and reliable
Q:Why would the plugging concrete pump pipe
When pumping, the choice of speed is critical, operators can not blindly map fast, sometimes more haste, less speed. When pumping for the first time, due to the large resistance of the pipeline, the pump should be pumped at low speed. After the pump is normal, the pump speed can be increased properly

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range