Dead Bolt Lock

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
100 Pieces pc
Supply Capability:
20000 Pieces per Week pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Features

According to DIN 18. 250 class 3

For wooden or steel doors

Optional for rebated or non-rebated doors

Suitable for external fire and smoke protection doors

Prepared for profile cylinders

with key action

Deadbolt 2-turns

 Technical data

Follower: 8mm/9mm

Backset :55mm

 Forend

Type: Round head /Square head

Thickness:3mm

Width: 20mm/22mm/23mm/24mm

 Forend finish

Stainless steel: stain stainless steel  polished stainless steel

Vacuum metalling: stain brass/PVD

 

Accessories:

Striking plate

Pocket

Lock and striking plate fixing screws

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the processes of metal parts surface treatment?
2: spray paint, paint, spray, spray porcelain,3: polishing, drawing, polishing, grinding, shot peening, shot blasting, vibration grinding
Q:Stainless steel locks, marine hardware, pipe valves, auto parts
3. tube valve: pipe material and metal tube, valve is the pipe switch function, usually ball valve and throttle valve, life pipe (pipe) and faucet (valve); 4. auto parts: a lot of Oh! Such as screws, nuts, springs, seats, seat cushions, steering wheels, tempered glass, engines / solenoid valves...
Q:CNC precision hardware parts processing should pay attention to!
Before the mechanical action, check whether the movement is filled with lubricating oil, and then start and check the clutch and brake is normal, and the machine will be airborne for 1-3 minutes, mechanical failure is strictly prohibited.3, start the power supply, start the machine, must wait for other personnel all leave the mechanical work area, and take away the sundries on the work table before you can start.
Q:What are the hardware tools and parts? How do you classify them?
That's too muchHacksawSaw bladePliersScrewdriver (word, cross)TapeCutting pliersNeedle nose pliersOblique nose pliers
Q:Hardware processing plant machinery parts manufacturing, how to implement piece rate wages?
Second, the hardware processing plant wages higher than the hours, so that each employee because of the implementation of the piece to get more benefits. It's a big mistake for some employers to use piecework to lower their wages. Machine parts are manufactured by piecework, not only do not depress the wages of workers, but also increase the wages of workers. You think, the implementation of piece by piece, the boss less how much heart? How much does it cost less to manage? How much less can the managers of non direct production employ? An enterprise, the fewer managers, the higher the efficiency, the more dynamic the enterprise will be. With so many benefits, why not share it with your employees? And why not share with your employees? Third, machining parts must be generally implemented, in particular, can not allow some managers to leave the piece and choose time. Otherwise, these managers soon changed, the so-called white-collar workers to become a cut above others, in violation of yin and Yang, and production workers against borrowing power to do evil, everywhere, as enterprises in the most corrupt reactionary forces, seriously hindered the development of enterprises. Hardware processing plant in the implementation of piecework wages, the company, the boss, the interests of workers to achieve unity, so that employees will do things to work harder, factory benefits will be greater.
Q:Carved metal parts processing with what modeling and programming
There are several ways to find a programming apprentice factory and learn how to program.Or hold classes to learn about, then luck outside the bumper, find a factory mixing time almost.There is a small shop processing machine and programming exercises, and then learn yourself in a good relationship, ask others, can also own a knife in his little machine road operations try. It's faster and doesn't delay work.
Q:What is the function of each part in the hardware mold?
Die learning is a long process, want to have patience, more important to have talent, learning to master the arrangements to get master diligent affirmation, so you ask questions when he was willing to tell you the patient, usually see more about stamping die books (Xinhua book store, there are many parts) you can go to the use of said press shop at half, I wish you success!
Q:How do you fit the parts in the door lock?
5. keys: different heights of "sawtooth", corresponding to different lengths of marble. This terminology is serrated teeth.
Q:Metal parts, surface oil pollution, what kind of cleaning better?
Stainless steel oil cleaning agent is mainly environment-friendly water-based metal by low foaming surfactant, diffusion agent, corrosion inhibitor, anti rust agent and cleaning agent is mixed into the cleaning agent, does not contain heavy metals, phosphorus, nitrite and other substances, can completely replace gasoline, kerosene, diesel, trichloroethylene, three chlorine ethane cleaning the way
Q:Hardware, machining parts, how to calculate the price?
Equipment wear expenseEnergy costAdded value or profit margins
We pay close attention to every detail, and we test all of our products to ensure lasting quality and durability. You can be sure that our products have past extremely hard corrosion resistance with salt spray testing machines and 500,000 times cycle testing with our testing machines made according to DIN standards. We inspect every component such as screw, pocket, and label in the inter set that our products will meet your highest standards and complete satisfaction. To maintain the above aspects, our motivated and responsible staff members are working hard everyday.

1. Manufacturer Overview

Location Beijing,China
Year Established 2006
Annual Output Value
Main Markets North America
South America
Eastern Europe
Southeast Asia
Africa
Oceania
Mid East
Eastern Asia
Western Europe
Company Certifications ISO 9001:2000;TL 9000

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage 81% - 90%
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines 5
Contract Manufacturing OEM Service Offered Design Service Offered Buyer Label Offered
Product Price Range