• Customized Aluminum Alloy Template for Buildings System 1
  • Customized Aluminum Alloy Template for Buildings System 2
  • Customized Aluminum Alloy Template for Buildings System 3
Customized Aluminum Alloy Template for Buildings

Customized Aluminum Alloy Template for Buildings

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
150000 /month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

SNTO Aluminum Formwork System Benefits
1 light weight and no need of crane
2 good construction effect and quality with no need of troweling
3 high stiffness,no concern for weight
4 high recyclable rate
5 fast build and short delivery
6 SNTO aluminum formwork system has realized industrialization, standardization and workermanization based on powerful management
7 complete aluminum industry chain
8 strong research team with a national-recognized enterprise technology center, post doctoral R&D workstation, Hunan Engineering Research Center of Aluminum Processing, and Central South University-Suntown Technology Researching academy
9 excellent after-sales service and quick response
10 environment protection

SNTO has a national-recognized enterprise technology center, post doctoral R&D workstation, Hunan Engineering Research Center of Aluminum Processing, and Central South University-Suntown Technology Researching academy, and has been undertaking Asian Pacific international cooperation program, 863 national program and other projects relating to new products researching. Moreover, Suntown has gained a series of achievements on product improvement and market innovation, which were transformed rapidly into product.
Rely on continuously technology research and management innovation, SNTO strives to become a world-leading and high technology enterprise group.

Q:The whole concrete wall climbing frame or good use of steel scaffolding
It can climb up or down the building. This system makes the change scaffolding Technology: one is without turning over the shelf; two is exempt from the disassembly process of scaffold (an assembly has been used after the completion of construction, and not affected) building height restrictions, greatly saves manpower and material
Q:What is an integrated climbing frame? What are the works? What are the advantages
. It can climb up or down the building. This system makes the change scaffolding Technology: one is without turning over the shelf; two is exempt from the disassembly process of scaffold (an assembly has been used after the completion of construction, and not affected) building height restrictions, greatly saves manpower and material
Q:Advantages and disadvantages of climbing frame and floor type scaffold
Floor scaffold:Advantage:1) large bearing capacity. When the scaffolding geometry and structure comply with the relevant requirements, under normal circumstances, the bearing capacity of 15kN ~ 35kN of the single column scaffold (1.5tf ~ 3.5tf, design value).
Q:What are the maintenance and maintenance of hydraulic climbing formwork
Regular inspection of the climbing device should check the connections. In particular, the following parts of the site to focus on inspection and reinforcement: according to the design requirements of the bolt with spring washers
Q:Climbing frame is divided into several kinds, what is its running mode? What is the rental cost? Please explain in detail! Thank you very much
Install the lifting seat and a guide seat is connected with the high wall, main frame vertical rod, the frame set up to the designed height, laying the top scaffold, block feet - laying bottom safety nets and scaffolding, making turning plate - the upper part of the frame body structure and effective tie (tie spacing is not greater than 6m) - display efflux dense mesh safety net to the top of the shelf, the anti dropping boom is inserted into the base anti dropping device, the installation of steel rope - placed distribution cables, installation control cabinet, electric hoist, electric wiring and debugging system, pre inspection, electric hoist, demolition of frame body and the upper structure of pulling and synchronization a layer - installation completed, enter the upgrade cycle
Q:The difference between the scaffold and the scaffold
The difference between climbing frame and scaffolding is commonly used scaffolding from below has been set up, which is followed by building up climbing frame, the figure is upstairs, they have in common is that we are like scaffolding

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords