• Curtain Wall Stainless Steel Spider Fitting System 1
Curtain Wall Stainless Steel Spider Fitting

Curtain Wall Stainless Steel Spider Fitting

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
100 Pieces pc
Supply Capability:
100000 Pieces per Month pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.Manufacturer

2.Lost-wax casting

3.Stainless steel 304 or 316

4.Satin or mirror surface

5.OEM or ODM is ok

 

We are a professional manufacturer of glass clamp, balustrade and handrail fittings,pipe fittings and curtain wall spiders,including wall bracket,end cap,tube base,flange,elbow,tee,rail support,crossbar holder,wall spider,also we can supply the whole set of handrail and balustrade series etc.

We have our own lost-wax casting and machining foundries,have high-qualified workmen with advanced experience,examination,equipment and quality-guaranteed system.

 

1.one-arm spider

2.two-way spider

3.three-way spider

4.four-way spider

5.route is also available

6.Material: SS304 (AISI304) and SS316(AISI316);

7.Surface: satin/brushed finish or mirror/polished finish;

8.Certificates:international testimonials of ISO9001/2008,CE & PED;

9.Payment: T/T 30% paid in advance as deposit, 70% balance to be paid upon receipt of copy of B\L.

10.Delivery time: 35-45 days upon receipt of deposit;

11.Terms of delivery: By ship, by plane or by express;

12.Packng:Each one is wrapped in EPE bag,6 pcs are put into a small white box,ten boxes makes a outer carton;

13.100% guarantee on the highest quality,the material is analyzed by German Spectrometer for each furnace.

14.Reputation: We enjoy a good reputataion from home and abroad,so far we have not received any complaints;

15.ODM and OEM: Our R & D department is able to offer technical support for customers on the basis of your sample or drawing. A mould cost will be paid back if your order reaches a specific quantity.

Q:Building energy efficiency acceptance of what documents
First of all, you are where the department is responsible for energy conservation acceptance, and then to the relevant departments of the department to understand what specific documents need, because different regions, different time periods of different content of the project acceptance is often different, and government agencies, first Find out the current requirements, do not work with experience, we are ate losses.
Q:What is the construction process of the point glass curtain wall?
First measure whether the steel structure and drawings in line to see if there is no deviation. If there is no deviation in the steel structure on the line to set the location of the mother, the location should be as accurate as possible. And then welding to the mother base. The welding is completed and then the jaw pieces are mounted on the female base, and then the splice fitting is mounted on the hole of the glass, and then the hook is hung up and the screw is tightened. Out of place.
Q:Bidding documents are glass curtain wall, the party has to check the aluminum alloy window, how to do?
Should be agreed by the contract, if the contract is not agreed, that is, according to the actual settlement of the two sides resolved.
Q:What are the curtain wall materials to do? The beginning of the time
Curtain wall works include: 1, curtain wall works to complete the map, structural calculations, design instructions and documents; 2, the architectural design unit of the curtain wall engineering design confirmation documents; 3, the curtain wall works with a variety of materials, hardware accessories, components and components of product certification, performance testing reports, admission inspection records and re-inspection report; 4, the curtain wall works of the silicone structure of the identification of the certificate and the inspection certificate, the import of silicone structural adhesive business certification, silicone structural adhesive compatibility and peel adhesion report, stone sealant with the pollution test report ; 5, post-embedded pieces of the field tensile strength test report; 6, the wind wall of the wind pressure deformation performance, airtight performance, watertight performance and other design requirements of the performance test report; 7, glue, curing the environment temperature, humidity records, two-component silicone structure of the mixing test of plastic and pull test records; 8, lightning protection device detection burn; 9, hidden engineering acceptance documents; 10, the curtain wall components and components of the production of burning, curtain wall installation construction records; 11, tension rod cable prestressed tension record; 12, water test records;
Q:What is the classification of building materials?
Main points: foundation and foundation, the main structure, architectural decoration, construction roof, hydropower, fire, elevators, etc.
Q:Curtain wall energy-saving project acceptance of the general project which
Construction and installation requirements, including insulation material fixed, partition thermal bridge, steam layer, ventilation equipment, glass installation, shade installation, condensate set system installation.
Q:Stainless steel sheet approach to provide any proof of quality documents
The simplest is the material certificate slightly, generally large steel mills are made of stainless steel material certificate. If your product needs environmentally friendly, then the use of stainless steel on the need for environmental certification, like ROSH certification.
Q:Fire aluminum glass is what glass where to sell
Fireproof glass in accordance with the requirements of the building, such as fire partition isolation, or fire partition interval attachment (closer, etc.)
Q:Curtain wall design documents review how qualified newspaper supervision
You should say is the curtain wall of the drawings review certificate. Do not need any format, do not have a separate inspection, copy a copy of the supervision to the OK. The The And the original should be given to the Party
Q:What are the contents of the curtain wall energy conservation project quality acceptance?
The curtain wall is the external wall of the building, not load, like the curtain hanging up, it is also known as the "curtain wall", is a modern large and high-rise buildings with decorative effect of light wall. By the panel and the supporting structure of the system can be relative to the main structure of a certain displacement or have their own ability to deformation, do not assume the role of the main structure of the building outside the envelope or decorative structure. Curtain wall energy-saving projects used in the installation of insulation materials should be taken to protect moisture, water and other protective measures.
We make every step strictly, especially for testing. We have spectroscopy analysis, metallographic microscope, tensile, hardness, impact and X-Ray test, liquid penetrant, magnetic particle test and NTD inspection. The interpretation of the data from these test facilities could promise the best quality of our raw casting, any required test report of process should be attached before delivery of all the casting parts of each.

1. Manufacturer Overview

Location Guangdong,China (Mainland)
Year Established 2008
Annual Output Value
Main Markets North America
South America
Eastern Europe
Southeast Asia
Oceania
Mid East
Eastern Asia
Western Europe
Company Certifications ISO 9001:2000;ISO 9001:2008;QS-System nach EN 764-5, Abschnitt 4.2, und AD 2000-Merkblatt W O

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords