• Cuplock System Cantilever Frame System 1
  • Cuplock System Cantilever Frame System 2
  • Cuplock System Cantilever Frame System 3
Cuplock System Cantilever Frame

Cuplock System Cantilever Frame

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

48.3 diameter x 3.2 thick high grade steel

Lower fixed cups at 500mm centres

Top cups allow 4 components

Horizontals locate in bottom cup of standard

Forged blade ends for strength

Scaffolding system provides total flexibility to lock in any angle plus quickly and accurately aligns at 90 degree angles using the keyhole positions. Each rosette can accommodate up to eight connections at one time. Our system scaffolding can increase your efficiency by decreasing scaffold construction time by two-thirds.

The high-strength Mouthpiece uses a Wedge Pin with a reverse slope. The Wedge Pin engages the Rosette entirely through its vertical surface, ensuring a properly seated Mouthpiece on the Rosette while the Wedge Pin is in place. The lobes are reversed to dramatically increase the compression area at the bottom of the Mouthpiece.

We are professional scaffold & couplers  manufacturers with years' experience.To guarantee the quality and technology is our development objective.The products as follow:

1.  Cuplock System / Ringlock System /Kwikstage System, H-frame

2.  Screw Jack / U-head jack / Props / Steel Plank

3.  Drop forged / Pressed couplers

4.  Tower with wheels

We work for the based items(Stamping, fabrication and machining) and get the best price for some other parts from our 200 qualified supplier, these allow us have been providing to our valued customers from overseas(U.S., U.K, Australia, Canada, Germany, France) the following benefits and advantages:

·         Hot dipped galvanized

·         No bolts or screws

·         Premeasured components

·         Conforms to any angle or curve

·         Rigid and safe

·         Versatile

·         Can be used in conjunction with tube and clamp

·         Maintenance free

We continue to manufacture many products in our factory. This provides many local jobs and allows us to make different custom products with a quick turnaround, giving us a competitive edge.

We have been always committing great efforts on internationalization and stability of quality. The company strictly implement ISO9001:2008 international quality system and was continuously awarded as AAA credit enterprises in 2005 and 2006.

Safety is always a factor in manufacturing and selling the many products. We have offered safety training programs for many years. We will continue to do so for the safety of our employees and customers.

Q:The whole concrete wall climbing frame or good use of steel scaffolding
It can climb up or down the building. This system makes the change scaffolding Technology: one is without turning over the shelf; two is exempt from the disassembly process of scaffold (an assembly has been used after the completion of construction, and not affected) building height restrictions, greatly saves manpower and material
Q:What is an integrated climbing frame? What are the works? What are the advantages
The climbing frame, which is also called the lifting frame, can be divided into several types, such as hydraulic, electric, manual and so on. It is a new type of scaffolding system developed in recent years, which is mainly used in high-rise shear wall construction.
Q:Advantages and disadvantages of climbing frame and floor type scaffold
2) easy to install and disassemble, set up flexible. Because the length of the steel tube is easy to adjust and the fastener is convenient to connect, the utility model can be used for various buildings and structures with various planes and elevations.
Q:What are the maintenance and maintenance of hydraulic climbing formwork
Regular inspection of the climbing device should check the connections. In particular, the following parts of the site to focus on inspection and reinforcement: according to the design requirements of the bolt with spring washers
Q:Climbing frame is divided into several kinds, what is its running mode? What is the rental cost? Please explain in detail! Thank you very much
Install the lifting seat and a guide seat is connected with the high wall, main frame vertical rod, the frame set up to the designed height, laying the top scaffold, block feet - laying bottom safety nets and scaffolding, making turning plate - the upper part of the frame body structure and effective tie (tie spacing is not greater than 6m) - display efflux dense mesh safety net to the top of the shelf, the anti dropping boom is inserted into the base anti dropping device, the installation of steel rope - placed distribution cables, installation control cabinet, electric hoist, electric wiring and debugging system, pre inspection, electric hoist, demolition of frame body and the upper structure of pulling and synchronization a layer - installation completed, enter the upgrade cycle
Q:The difference between the scaffold and the scaffold
Climbing frame, also known as the lifting frame, according to its source of power can be divided into hydraulic, electric, manual pull and other major categories. It is a new type of scaffolding system developed in recent years, which is mainly used in high-rise shear wall construction. It can climb up or down the building. This system makes the change: one is the scaffold without turning over shelf, two is exempt from the disassembly process of scaffold (an assembly has been used after the completion of construction, and not affected) building height restrictions, greatly saves manpower and material. And in terms of security is also a big change for the traditional scaffolding. Highly developed in high-rise buildings.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords