Cuplock Scaffolding For Construction High Quality Galvanized Q235 Steel

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 kg
Supply Capability:
100000 kg/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Cuplock Scaffolding For Construction High Quality Galvanized Q235 Steel


Quick Details

Place of Origin:

Shandong China (Mainland)

Brand Name:

HILONG

Model Number:

HLCLSC03

Size:

48.3*3.25MM

Material:

Steel Q235/Q345

Surface:

Electro Galvanized/Painted/HDG

Name:

Galvanized Q235 Steel Cuplock Scaffolding For Construction

Catagory:

Scaffolding System

Process:

Casting, Forged, Pressed, Welding, etc

Component:

Top/Bottom Cup,Ledger Blade, Standard, Ledger, Bracket, etc

Advantage:

Durable, Stable, Skid-proof, Antirust

Application:

Highways/Subways, Bridges, Tunnels

Manufacturer:

OEM Service is Available






Packaging & Delivery

Packaging Detail:

As the Requirment of Clients

Delivery Detail:

20days

Cuplock Scaffolding For Construction High Quality Galvanized Q235 Steel

Cuplock Scaffolding For Construction High Quality Galvanized Q235 Steel

Cuplock Scaffolding For Construction High Quality Galvanized Q235 Steel



Specifications

Cuplock Scaffolding System and Accessory 
Material:Steel Q235 
Surface:HDG/Painted/Galvanzied 
Manufacturer, OEM 
ISO, BS1139


FAQ

1) What can we do for you?

    We can ensure the quality of the vinyl banner and avoid extra expenses for customers.

    We can provide you the professional design team.

    We can provide fashionable and newest styles for you.

    We can design the artwork for you.

    Please feel free to customize.

 

2) What promises can be done by us?

    If interested in Aluminum-Frame Formwork, please feel free to write us for any QUOTE.

    If printing required, please advise asap because the whole set need much more time to complete.

    Please DO check goods when courier knocks your door and contact us asap if any issue.

 

3) What about of our after-sale service?

    Response will be carried out in 24hours  after receiving any complain or request.

    Aluminum-Frame Formwork cost can be refund after order is confirmed.

    If the products are not based on the requirements, there will be the relevant compensations made for you.

 

 4) What about the package and shipping time?

    Packing:  As Customer's Requirements

Shipping: We have various shipping ways for our customers,

such as express which including TNT, DHL, FEDEX, UPS, EMS, etc. By air/ sea, and we are VIP of these express.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the requirements for fastener type scaffolding? How to calculate
5, the safety net to the floor construction progress by layer by layer.  6, high scaffolding must have lightning protection facilities.
Q:Scaffolding plug (90, outside the 400), this is what ah? How to use ah?
Bowl buckle scaffold, called bowl buckle frameThe bowl buckle frame is composed of a steel pipe vertical rod, a cross bar and a bowl buckle jointStructure of bowl frame basic construction and erection requirements and fastener type steel tube scaffold is similar, the main difference lies in the bowl. Bowl buckle connector is a connector on the bowl, bowl buckle, bar joint and the upper bowl limiting pin etc. welding buckle under the bowl and the bowl buckle pin in the vertical rod, the bowl set into the pole in the
Q:How much for scaffold piercing in Los Angeles? (90039 area)?
It all depends on where you go. They can range between 25-35 dollars. Just remember to relax and eat a good meal before you go. Healing takes around 6 months to a year. Your piercer will instruct you on how to care for it. Always ask your piercer any and all questions you have.
Q:can I claim compensation for falling of scaffolding and breaking my arm?
If you can prove that the company was responsible i.e. the scaffolding was not safe, then yes. If it is proved that you ignored instructions, signage preventing your access or training, then no. The company cannot be held responsible for your stupidity, if for example, you decided to climb over a guardrail rather than leave the scaffold at the proper access points. In this case, you would get nowhere with a claim. If the scaffold was missing guardrails where it should have them, then quite rightly the company in charge of the site on which the scaffold is erected is responsible.
Q:I am looking for a letter scaffold (to the editor)?
OK, I'm really confused. Exactly WHAT are you looking for? An existing letter? A format on how to write a letter? Or for us to write one for you (good luck with THAT!)?
Q:Fastener type steel pipe scaffold wall parts of the lateral spacing is less than the number of
The vertical distance of the vertical pole is 3 times larger than that of the wall
Q:Significance to Hester viewing the crowd from atop the scaffold in the beginning (ch. 2) of the scarlet letter
maybe the fact that it marked the point where she began to see things from a different perspective than the colonists (figuratively and literally) Hawthorne later says that she began to think unnatural thoughts for a colonist..... Hope this helps, we didn't really discuss this while we read it ^_^
Q:describe Vygotsky’s contribution to our understanding of cognitive development? What is scaffolding?
Cognitive development is the growth of a child when they have sexual urges
Q:Does scaffolding piercing hurt more than snug piercing?
A snug is nothing compared to an industrial, you'll be totally fine. Good luck!
Q:Wheel buckle scaffolding rental price
1, according to the lease. Wheel buckle scaffolding per ton 3.5~4 yuan / ton / day.2 by meter lease. Convert down and not much difference, and trouble.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range