Cup Locked Scaffolding with Excellent Stability

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 m²
Supply Capability:
100000000 m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.   Structure of Cup-lock Scaffolding

Cup-lock Scaffolding consists of adapter plug of cup-lock, post, cross bar ,diagonal brace ,top bar, base and other fittings. The adapter plug of cup-lock is the core and consists of top cups, bottom cups, post ,ledger connections and limit pins of top cups.

 

It can be widely used for industrial and civil construction and maintenance, such as workshop, large gymnasium, conference& exhibition center conversation, billboard, market, dock, tunnel, subways, etc. used for mobile working platform installation of electrical & mechanical engineering, ship repair and other decoration engineering, for building temporary stand ,with simple roof frame, frame-connected Scaffolding can from temporary dormitory, depot and work shed.

 

2.   Main Features of Cup-lock Scaffolding


.Multifunction: equipments of construction with different size and load of construction could be assembled, such as one-size double-sides scaffolding, props, etc. Applied to high-rise building, bridge, water tower, and so on.

.Avoid using bolt in assembly and low down labor intensity

.Reliable bending, shearing, torsional strength of dentation &cup-lock connection, the overall of it is more stable than normal

.Not easy to lose fastener, portable firm and easy to maintain and transport


3.   Cup-lock Scaffolding Images


4.   Cup-lock Scaffolding Specification

     .There is a pair of adapter plugs of cup-lock every 0.5m-0.6m on the post and top bar

     .5 times fast of adapter plug assembly and disassembly than normal

     .Assuring construction of high-rise scaffolding with the whole safety facilities, the safety and reliability in usage

 

5.   FAQ of Cup-lock Scaffolding

     1) What can we do for you? 

 We can ensure the quality of the vinyl banner and avoid extra expenses for customers.    

    .We can provide you the professional design team.    

    .We can provide fashionable and newest styles for you.    

    .We can design the artwork for you.    

    . Please feel free to customize.  

 

   2) What promises can be done by us?

    . If interested in Cup-lock Scaffolding, please feel free to write us for any QUOTE.

   . If printing required, please advise asap because the whole set need much more time to complete.

   . Please DO check goods when courier knocks your door and contact us asap if any issue.

 

  3) What about of our after-sale service?

   . Response will be carried out in 24hours  after receiving any complain or request.

   . Frame-Connected Scaffolding cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.  

 

 4) What about the package and shipping time?

   .Packing:  As Customer's Requirements

    .Shipping: We have various shipping ways for our customers, such as express which including TNT,  DHL,  FEDEX, UPS, EMS, etc. ; by air/ sea, and we are VIP of these express.  

  .Shipping time:

    Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days. 

    Other mass qty of Cup-lock Scaffolding, we send them out by sea or by air to sea port or air port to save some shipping freight for our customers. By ocean, it may need 45~60days, by air, it may need 25~40days.  


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Scaffolding plug (90, outside the 400), this is what ah? How to use ah?
Go on, with 3 m long rod, the top layer with 1.8 m and 3 m two. The length of leveling under 30 m high scaffold verticality deviation should be controlled within 1/200, 30 m high above the scaffold should be controlled at 1/400~1/600, the total height of the vertical deviation should be less than 100 mm.The domestic vertical bar bowl buckle spacing of 600mm, the number of foreign pitch bar button spacing is some of the 500mm, the foreign specifications of the crossbar as well as 1m, 2m, 2.5m
Q:For engineering scaffolding steel pipe all kinds of fasteners and fastening screws calculation method?
For flexural members:When combined with wind load is 1.2SGK+1.4SQKCombined wind load is 1.2SGK+1.4SGKFor axial compression member:When combined with wind load is 1.2SGK+1.4SQKThe combined wind load is.2SGK+1.4 * 0.85
Q:A brick is dropped from a high scaffold. What is its velocity after 2.9 s?
v=at (assuming acceleration is constant as it is in this case) acceleration is gravity, G=9.8 m/s or 10 m/s v=(10 m/s)2.9 29 m/s
Q:Information About: Scaffold Piercing?
No, it does no longer look gay on a guy. i comprehend lots of fellows who've them. even however, it truly is going to look stupid on everybody if their ear isn't formed exact to house a scaffold piercing....
Q:How much for scaffold piercing in Los Angeles? (90039 area)?
It all depends on where you go. They can range between 25-35 dollars. Just remember to relax and eat a good meal before you go. Healing takes around 6 months to a year. Your piercer will instruct you on how to care for it. Always ask your piercer any and all questions you have.
Q:Wheel buckle scaffolding rental price
1, according to the lease. Wheel buckle scaffolding per ton 3.5~4 yuan / ton / day.2 by meter lease. Convert down and not much difference, and trouble.
Q:industrial/scaffold piercing help?
Let the dry blood come off on its own. Using a sterile saline wound wash spray twice a day to keep it clean will help soften it up and it will come off within time. You can take baths but you really need to make sure your head never gets submerged under the water while your piercing is healing. Washing your hair under the faucet is fine but rinsing it in the water you're sitting in is not.
Q:Fastener type steel pipe scaffold wall parts of the lateral spacing is less than the number of
Should be less than or equal to 3 times the vertical pole of the scaffolding.
Q:Why the scaffolds need to be inspected within the preceding 7 days and after adverse weather condition?
to check for loose parts/bolts/cables/etc caused by heavy winds and storms. Also, heavy rains can sometimes cause oxidation of certain cables which weaken the scaffolding structure over time
Q:A 85 kg scaffold is 6.4 m long. It is hanging with two wires, one from each end. A 440 kg box sits 1.4 m from?
scaffold mg = 85 x 9.8 = 833 N box mg = 440 x 9.8 = 4312 N left hand wire = ((833/2) x 6.4) + (4312 x (6.4 - 1.4)) = 24225.6 24225.6 = 6.4 x left hand tension 24225.6/6.4 = 3785.25 N (answer)

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range