Cup-lock System Scaffolding with Painted Steel Q235 Q345 CNBM

Ref Price:
Loading Port:
Guangzhou
Payment Terms:
TT OR LC
Min Order Qty:
20 m.t.
Supply Capability:
3000 m.t./month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Cup-lock System Scaffolding with Painted Steel Q235 Q345 

Name

Cup-lock System Scaffolding with Painted Steel Q235 Q345 

Place of Origin

China

Brand name

CNBM

Main Material

Q345 ,Q235

Surface Treatment

High Protected Painted, Powder Coating, Electric   Gavenized, Hot Dip Gavenized.

Color

Silver, Orange

Certificate

SGS, EN74, ISO

Features

Automatic Welding

Service

OEM Service available

MOQ

20ton

Payment

T/T or L/C in sight

Delivery Time

About 20-30 days after confirmation

Packing

in bulk or steel pallet or as your request

production capability

100 tons per day

 

Cup-lock System Scaffolding with Painted Steel Q235 Q345 CNBM

Cup-lock System Scaffolding with Painted Steel Q235 Q345 CNBM

 

Specifications

it's economical and practical 
forge cup 

Cup-lock System Scaffolding is a multi-purpose modular scaffolding system which can be used for all forms of access and support structures in building and construction industries, ship bulding, offshore construction and industrial maintance.

 

Reasonable and simple structure, high structure strength

Multifunctional

Easily and quickly erected and disassembles just a hammer needed.

Reduce labor 80% in comparison with tube and clamp scaffolding

Advantageous to transform tube and clamp scaffoldign now available.

 

Erection Procedure:

Standard        Ledger           Ladder             Ladder bracket    

Board bracket    Brace   Plan brace   Caster adapter       Screw base     Base plate


                SpecificationHot Dip Galv.(Wt.)Electric Galv.+ Painting(Wt.)Electric Galv.(Wt.)Painting(Wt.)Powder Coating(Wt.)
Cup-lock System Standard 3000mm (9'10")16.8516.0615.9016.0615.90
Cup-lock System Standard 2500mm (8'3")14.1813.5113.3813.5113.38
Cup-lock System Ledger 3050mm (10')11.6111.1711.0611.1711.06
Cup-lock System Ledger 2745mm (9')10.4610.069.9610.069.96
Cup-lock System Diagonal Brace 3944 (3050x2500)mm (10'0"L x 8'3"H)12.0411.2611.1511.6411.15
Cup-lock System Diagonal Brace 3713 (2745x2500)mm (9'0"L x 8'3"H)11.3910.6510.5510.6510.55
Cup-lock System Diagonal Brace 3713 (2745x2500)mm (9'0"L x 8'3"H)11.3910.6510.5510.6510.55
Cup-lock System Double Ledger 1570mm (5'2")12.3911.9211.8011.9211.80



FAQ

1. What is considerations of Scaffolding installation?

There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

(1) scaffold frontage hurtful to prevent falling objects protection is required.

(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

2.What are the certifications of your products?

Certified by SGS, BS1139, EN74, Local Test Report.

3. How long is the warranty period for your product?

Our products warranty is 2 years.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Should the WWE bring in New Jack to work scaffold matches with John Cena & Randy Orton?
New Jack? Jack Swagger O_o
Q:scaffold/industrial piercing helpp:(?
To return to the bar, you'll need to go to your piercer to have it reinserted using a small taper. Switching it back and forth from a single bar to hoops is absolutely not recommended because the hoops have a curve and will cause the bar to not fit properly because it will change the angle of the piercing, you can use straight barbell studs that are the same gauge as your single bar though without complication.
Q:Skin growing over my scaffolding bar?
Yes it is bad if I looks as if it has the skin growing around it. I would see your piercer about that.
Q:A window washer is standing on a scaffold supported by a vertical rope at each end. The scaffold weighs 210 N?
assuming the scaffold is uniform weight, take moments around 1 end to get the tension in the rope of the other the ∑M = 0, take the rope tension direction as positive 690 x 2.3 + 210 x (3.3 / 2) = T1 x 3.3 T1 = 586N Now moments around the other end 690 x (3.3-2.3) + 210 x (3.3/2) = T2 x 3.3 T2 = 314N You can check your answers as ∑F = 0, so 586 + 314 - 210 - 690 = 0
Q:scaffolding in spanish?
Andamiaje, used by masons.
Q:How much is a scaffold piercing?1-10 on pain?
I would say about a 6 maybe 7... and its a pain for the first few months.. like it gets sore if you lay on it to much ect :)
Q:Muslim scaffolding question for dbq? Please help.?
It seems like he is describing them like he respects them. He is idolizing their humility and pride. Is DBQ a Document Based Question? just wondering, if you are in APH, good luck! :) Addition: I found your post responding to this one. lol Hopefully this helped! I remember those DBQs, kinda a pain. lol....but it was a fun class and it is well worth taking!
Q:I got my scaffolding piercing yesterday?
well when i got my lip pierced idk if this is the same thing but when i woke up the next morning there was blood on my pillow, my face, and running down my neck and now its fine just be sure to clean it every day and it should be fine
Q:The difference between bowl buckle scaffold and fastener scaffold
4 according to the form and use of the overlap into(1) single row scaffolding (single row): only a row of pole end, horizontal bar on the scaffolding on the wall.(2) double row scaffolding (double frame): scaffold composed of inside and outside the two rows of the pole and the horizontal bar etc..(3) structural scaffolding: scaffolding for masonry and structural engineering operations.(4) decoration scaffolding: scaffolding for construction work.(4) cantilever scaffold: scaffold for installation or repair of cantilever work.(6) formwork support: a frame for supporting a template and a scaffold material.
Q:Weight of bowl buckle scaffold
Pole name specifications A (mm) B (mm) theoretical weight (kg) LG-60 6004 LG-120 12007.41 pole LG-180 180010.67 LG-240 240014.02 LG-300 300017.31 bar name specification A (mm) B (mm) (kg) HG-30 bar theory weight 3001.67 HG-60 6002.82 HG-90 9003.97 HG-120 12005.12 HG-150 15006.28

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range