Cup-lock Scaffolding with Nice Application,Enjoying Best Reputation

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1500 pc
Supply Capability:
3000000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

1. Main Intriduction of Cup-lock Scaffolding:

 

  • Name: Cup Lock Scaffolding

  • Category: Scaffolding system

  • Material: Steel (Q235/Q345)

  • Size: as your requirement

  • Surface:  Electro Galvanized/Self Color/Painted/HDG

  • Component: Standard, Ledger, Strengthened ledger, Transom Beam, Diagonal, Bracket, Top cup, Bottom cup, Ledger blade, etc. 

  • Simple structure:

  • The main parts include the standard, ledger and brace, it is easy to assemble and disassemble, and also easy to storage, transfer and maintain.

  • Safety and Steady:

    The up cup has the screw friction and self-gravity, it could self-lock steady, this makes the ledger steady, the loading of the ledger could transfer to the standard through the down cup, even the up cup is loose, the ledger joint could connect with the standard steady.

  • Multi using:

    According to the specific construction, Cup Lock Scaffolding could be assembled into one or two row with different size, it could also be used for multi construction tools, such as supporting frame, supporting column, materials lifting frame, stage supporting, etc.

2. The Advantages of Cup-lock Scaffolding:

  • Easy assembly, time and labor saving. 

  • High load-carrying capacity.

  • Adaptable to various construction projects.

  • All elements safely connected

  • Highly durable

     

3. Images for Cup-lock Scaffolding:

 

Cup-lock Scaffolding with Nice Application,Enjoying Best Reputation

 

 

Cup-lock Scaffolding with Nice Application,Enjoying Best Reputation

Cup-lock Scaffolding with Nice Application,Enjoying Best Reputation

 

 4. FAQ

  • How to guarantee the quality of the products

    We resolutely put an end to unqualified products flowing into the market. At the same time, we will provide necessary follow-up service assurance.

  • Packing & Delivery

    Export standerd package or as customer's requirements.

  • Why Choose us?

    Delivery Detail:

    10-25 days after receipt of payment.

    We are  the biggestmanufacturer on formwork andscaffolding accessories in China.

    We have more than 40 years experience on manufacturing and exporting.

     

    We have the excellent quality control. 

    We have the competitive price.

    We have the completed sales and service team so that we can offer the best service.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Painters on a scaffold?
I know where he should stand, but where he is standing is by the lunch truck when he should be getting his fat-*** back to work.
Q:On a scale of 1-10, how much do scaffolding piercings hurt?
its not that bad, i found the front hurt more than the back, but it's really not that bad.. you will feel it though, compared to the belly
Q:What are the hidden dangers of scaffolding
5, the lack of the lack of the head of the security risks, lack of fire fighting equipment hidden dangers.
Q:Scaffold piercing still throbing?
Ear cartilage piercings generally take longer to heal than lobe piercings. This is often due to a combination of things, such as the location of the piercing in the cartilage, the type of jewellery used and the tension that jewellery creates to the structure of the cartilage. Using biocompatible plastics (like PTFE), cleaning cartilage regularly, and increasing your intake of minerals will certainly benefit your piercing; however a piercing will almost always be doomed to failure if improper jewellery and poor planning are used and left unmonitored.
Q:Calculation method of various kinds of fasteners and fastening screws for engineering scaffold steel pipe
0.7 - the basic wind pressure reduction coefficient determined by the return period of 5 years. In some special cases, a value above 0.7 may be used, but not less than this value.More than W0, Z, beta Z, STW are in accordance with the "building structure load code" (GBJ9-87) of the corresponding provisions of the selection or calculation to determine, which STW 6.3.1 in accordance with its table thirty-second and thirty-sixth.
Q:I would like to ask what is the erection of external wall scaffolding specification?
What is the outer wall scaffolding erection specification: there are several following rn note: in our daily life, it is necessary. That is what to do with it, rn for home improvement, in the end how much help?
Q:has any1 got a scaffold *the bar piercin thru the cartilage*?
I got my scaffold pierced 4 days ago and I found it quite painful, but mostly because it's two piercings at once and not only is it thick cartilage, the second piercing will pull on the second one. It takes about 6 weeks to heal but to be safe you should wait over a month to change the bar. For mine they used a needle and a small cork, but it depends on the piercer. They pierced the part closest to my face first and pushed the needle through one side and into the tube on the other side. He put a cork on it so he could push the same needle through the second hole without the needle going straight through. He then did the normal method of hooking the jewelry onto the end of the needle and pushing it back through. That was painful too! He then screwed the balls on and cleaned up any blood and I was good to go! More information is that scaffold/industrial piercings are quite well-known to not be looked after properly so if you're thinking of getting it you need to make sure that you clean it every day with suitable solution and taking care not to knock it. :)
Q:A window washer is standing on a scaffold?
Analyzing the force diagram Forces in the Upward direction:...T1,T2 (tension of the ropes) Forces in the Downward direction...M1g (scaffold), M2g (man) Fnet = 0 T1 + T2 = M1g + M2g Analyzing the moments about the center T1 is nearest man T1(1.51) =M2g(1.51 - 1.28) + T2(1.51) T1 + T2 = (675 + 145)= 820 T1 - T2 = ((675)(1.51 - 1.28))/1.51 = 102.81 sum the two equations 2T1 = 922.81 T1 = 461.5 N T1 + T2 = 820 T2 = 358.6 N
Q:Scaffolding piercing?
Vist the store you got it and tell them instead of us
Q:Full house scaffolding height of more than the number of meters experts need to do?
The height of the erection of the frame is more than 24m, and only need to be designed and calculated according to the regulations.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range