Cup Lock Scaffolding with Good Quality for Construction China

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1000 kg/m²
Supply Capability:
10000 kg/m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.Structure of cup lock Description

cup lock system is one of the most popular used scaffolding system in the world.It is consisted of cup lock,vertical,ledger,limit pins,blades and base etc.

Packaging & Delivery

Packaging Details:

Pallet or bag or upon client's request

Delivery Detail:

35days

2.Main Features of cup lock

1) Using less pipes

2) Easy to install

3) It can be used again and again for nearly 20years

3.Cup lock product pictures:

Cup Lock  Scaffolding  with Good Quality for Construction China

 4.Cup lock Product Description

Type:

ringlock scaffolding diagonal Brace

specification

Ø48.3×3.20

material:

steel Q235

Finished

Hot DIP galvanized, painted

Diagonal length(m)

Weight(kg)

0.9m * 1.25m

6.28

1.25m * 1.8m

8.6

1.25m * 2.7m

11.45

  5.FAQ

 We have organized several common questions for our clients,may help you sincerely:

1) How many Scaffolding your company have?

Here comes our 5 types of Scaffolding systems:

-Cup lock Scaffolding(C-Lock Scaffolding)

-Ring lock Scaffolding

-Kwistage Scaffolding

-H-frame Scaffolding

-ID15 Scaffolding Tower, this type Scaffolding is the most widely used in construction, such like bridge.

2) How long can we receive the product after purchase?

Lead time is about 30days after getting the signed PI and deposit

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the main safety problems when dismantling the scaffold
1, all the rods and fasteners in the demolition of the separation, not on the rod attached fasteners or two rods connected to the ground.2, all the feet of the hand, should be erected from the outside of the handle, in order to prevent the feet and garbage from falling.
Q:Im planning on getting an industrial (scaffolding) ear piercing...?
I haven't had this piercing but i was thinking of getting one i do have an eyebrow ring and seven earrings in each ear and i use to have a tongue ring, your piercing cartilidge so it is going to sting shouldnt be too bad though for me my most painful piercing was my fourth earring hurt after that it wasnt too bad my seventh was a breeze i knew how to take care of it so that it would heal fast and not get infected. you have to daily sometimes twice a day clean it otherwise it gets infected and its been my exerpience that they get infected easy. the healing time for when you pierce cartilidge is twice that of when you pierce your lobe so about 8-12 weeks give or take as far as i know you have to be 18 to get one if your in the US (or 17 with parental consent) not sure what the age would be over in London as for reputable place most tatto parlors do piercings look for a clean place that sterlizes everything very important (again going on US standards) as for the cost not sure was 10 dollars for ear piercing at wal mart but for this kind of ear piercing i would guess 20-30 dollars cause its at leadt 50 for a eyebrow or tongue ring i know that. i hope this helps good luck
Q:What are the characteristics of disc scaffolding
The Pankou scaffolding 60 heavy support frame as an example, the height of 5 meters of the single pole of the allowable bearing capacity of 9.5 tons, the failure load reached 19 tons, is 2-3 times of traditional products. Advanced technology: disc scaffolding connection disc to the rod force through the center node is mainly used in Europe, countries and regions, is the rise in price replacement products, the scaffold is firm, stable structure of disc type scaffold material upgrade: the main materials used in low alloy structural steel (GB Q345), strength higher than the traditional carbon steel tube scaffold (GB Q235) 1.5-2 times
Q:Have you heard of meat on a scaffold?
Depends on how much it costs to stimulate the growth.
Q:Which loads are considered in the design of the scaffold
The load of the scaffold can be divided into permanent load (constant load) and variable load (live load).The permanent load of the scaffold shall contain the following contents:
Q:A 115 kg scaffold is 7 m long. It is hanging with two wires, one from each end?
Because the scaffold is not moving, we can assume that the net Torque acting on the scaffold equals zero. Net Torque = 0 torque = Force x distance (d) Use the left end of the scaffold as the center point. This will eliminate the Torque caused by the left wire (d = 0, so torque = 0) There are now three forces creating torque on the scaffold. There is the weight (m x g) of the scaffold, at 3.5m from the left end. m1 x g x 3.5m There is the weight of the crate, located 1.4m from the left end: m2 x g x 1.4m These two torques are countered by the torque caused by the Tension (T) of the right wire, located 7m from the left side. T x 7m The sum of these torques is zero. (T x 7m) - (m1 x g x 3.5m) - (m2 x g x 1.4m) = zero solve for T T = ((m1 x g x 3.5m) + (m2 x g x 1.4m)) / 7m T = ((115kg x 9.8m/s^2 x 3.5m) + (520kg x 9.8m/s^2 x 1.4m)) = 1.58 x 10^3 N Hope this helps.
Q:I want to know the classification of scaffolding in the building
Material division according to bar1) single specification steel pipe scaffold. It only uses a steel pipe specifications, such as steel tubular scaffolding, welded steel pipe using only 48 * 3.5.
Q:Is my scaffold piercing infected?
It's irritated. If it was infected, it would be oozing green or yellow gunk:) If it gets to that point, go to the doctor. Until then, just treat is regularly with salt solution:) Hope this helped!
Q:29 meters outside the walls of the house of the two rows of steel pipe scaffolding installation, demolition
With regard to the design and construction of floor type (double pole type) single and double row steel pipe scaffold for industrial and civil construction, and the design and construction of formwork support in the construction of horizontal concrete structure. National compulsory technical norms, because of its complexity, and you proposed "one square meter standard steel scaffolding the number of meters" is a vague and unclear description of the problem, considering the matter of security,
Q:How to set up the temporary structure of the external structure of the balcony on the two structure
Main projectCast - in - place main beam, board, column, stair - prefabricated board is installed - brick wall - door window hole is reserved, water and electricity Guan Xianyu is buried.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range