CUP LOCK SCAFFOLDING WITH DIP GALVANIZATION

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
20000 pc
Supply Capability:
3000000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

Cup-lock scaffolding system:


material:Q235,Q255,Q345
cup-lock scaffolding Surface treatment:hot-dip galvanized.dip-painting,powder coated

size:48.3*3.25mm

high quality and competitive price cup-lock scaffolding

OEM services

ISO9001:2000 approved.

Cup-lock scaffolding consists of adapter of cuplock,standard,ledger,diagonal brace,top support.screw jack base and orther supporting compinents,the adapter is the core part of cuplock scaffolding.mainly by the top cup.bottom cup,connector of standard and ledger,and limit pins of top cups.


Specification:


Components:

Standard ,ledger,diagonal , top cup, bottom cup,

Ledger Blade

Material:Q235/345/195

Surface:galvanized, Hot dip galvanized, Painted

color:red paint, blue paint, yellow paint, green paint, bright galvanized

size:

Steel pipe diameter is 48.3mm

Thickness :2.75/3.0/3.2/3.25/4.0mm

standard Length:0.5/1.0/1.5/2.0/2.5/3.0M

Ledger length:0.6/0.9/1.0/1.2/1.5/1.8

usege:Our products are used widely in bridge, tunnel, petrifaction, shipbuilding, railway, airport, dock industry and civil building etc


Packaging & Delivery

Packaging Detail:export standerd package or as customer's requirements.

Delivery Detail:10-25 days after receipt of deposit


Pictures of Cup-lock Scaffolding:



CUP LOCK SCAFFOLDING WITH  DIP GALVANIZATION


CUP LOCK SCAFFOLDING WITH  DIP GALVANIZATION


FAQ

 

How to guarantee the quality of the products?

We resolutely put an end to unqualified products flowing into the market. At the same time, we will provide necessary follow-up service assurance.

What's the Packing & Delivery Term?

Export standerd package or as customer's requirements.

Within 30 Days.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Scaffolding plug (90, outside the 400), this is what ah? How to use ah?
Go on, with 3 m long rod, the top layer with 1.8 m and 3 m two. The length of leveling under 30 m high scaffold verticality deviation should be controlled within 1/200, 30 m high above the scaffold should be controlled at 1/400~1/600, the total height of the vertical deviation should be less than 100 mm.The domestic vertical bar bowl buckle spacing of 600mm, the number of foreign pitch bar button spacing is some of the 500mm, the foreign specifications of the crossbar as well as 1m, 2m, 2.5m
Q:He'd talk to all the people from his scaffold ~~~the laws were obsolete, a change they should demand~~~?
TWO HANGMEN!!! As I rode into Tombstone on my horse whose name was Mac I saw what I relate to you goin' on behind my back It seems the folks were up in arms a man now had to die For believin' things that didn't fit the laws they'd set aside The man's name was I'm a freak the best that I could see He was an executioner a hangman just like me I guess that he'd seen loopholes from working' with his rope He'd hung the wrong man many times so now he turned to hope He'd talk to all the people from his scaffold in the square He told them of the things he found; But they didn't seem to care He said the laws were obsolete, a change they should demand But the people only walked away, he couldn't understand The Marshall's name was Uncle Sam he said he'd right this wrong He'd make the hangman shut his mouth if it took him all year long He finally arrested Freak and then he sent for me To hang a fellow hangman from a fellow hangman's tree It didn't take them long to try him in their court of law He was guilty then of thinking a crime much worse than all They sentenced him to die so his seed of thought can't spread And infect the little children; that's what the law had said So the hanging' day came 'round and he walked up to the noose I pulled the lever but before he fell I cut him loose They called it all conspiracy and that I had to die So to close our mouths and kill our minds they hung us side by side And now there's two hangmen hangin' from a tree That don't bother me at all Two hangmen hangin' from a tree That don't bother me at all
Q:When will the NYC's Guggenheim museum be free of that scaffolding?
My friend, the restoriation of the outside facede of the Guggenheim Museum should be completed in spring of 2008. The exterior restoration is part of $29 million restoration project to the 46 year building. Good luck Native New Yorker
Q:The latest version of the external scaffolding erection norms and template construction quality acceptance
The current template specification is JGJ162-2008 "construction formwork safety technical specifications"; belong to the high formwork project also must obey GB50666-2011 "concrete structure engineering construction code" fourth chapter
Q:What is a bowl buckle scaffold? What is the full house scaffolding?
1, according to the relationship between the location of the building:1 external scaffolding: external scaffolding erected along the periphery of the building from the ground, both for masonry walls, but also for the construction of external decoration. The main form of focotex rod, frame type bridge, etc.. Focotex rod is the most widely used, the time frame. Minimum bridge application.
Q:Scaffold Piercing (opinion)?
It is one of the more painful ear cartilage piercings and, as such, hurts more than getting your lobes pierced. It's also much more difficult to take care of. BTW: I love your Andy Warhol avatar. He's my favorite artist.
Q:Free fall physics question: a construction worker accidentally drops a brick from a high scaffold..?
Since acceleration is constant which is 9.8 m/s^2, the velocity increases by the fixed 9.8 amount every second, so: A) v = v0 + gt = 0 + 9.8*4 = 39.2 m/s where v0 is initial speed which in this case is zero. B) We use constant acceleration equation: x = x0 + v0*t + 1/2gt^2 = 1/2 gt^2 = 1/2 *9.8 * 16 = 8*9.8 = 80 - 1.6 = 78.4 m
Q:What is the height limitation of the standing braces in ringlock scaffolding system?
Hi addla, I do not know, but I am sure you do and please tell us all addla.
Q:Scaffold/Industrial piercing & healing?
it not to big a deal if you get it before, but if youre worried about keeping it clean than i would wait untill afterwards. cartledge pierceing can take anywhere from 6 months to 2 years to completly heal. plus it will be sensitive for quite a while and if youre going to be partying it may not be a good idea to have cuz you'll probably hurt it alot. you'd be surprised how many things your ear touches.
Q:Steel tube scaffolding construction labor time
The scaffolding in the quota is set in square meters. Including the demolition and demolition. Labor costs about 35.05~100 yuan, depending on the local market.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range