Cup-lock Scaffolding with Competitive Prices, Q235 Steel, with HDG

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT or LC
Min Order Qty:
1000 pc
Supply Capability:
3000000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:


1. Main Intriduction of Cup-lock Scaffolding:

  • Name: Cup Lock Scaffolding

  • Category: Scaffolding system

  • Material: Steel (Q235/Q345)

  • Size: as your requirement

  • Surface:  Electro Galvanized/Self Color/Painted/HDG

  • Component: Standard, Ledger, Strengthened ledger, Transom Beam, Diagonal, Bracket, Top cup, Bottom cup, Ledger blade, etc. 

  • Application: 

    Highways/Subways, Bridges, Tunnels and Fire Electrical Engineering, Marine Engineering 

      

2. The Advantages of Cup-lock Scaffolding:

  • Easy assembly, time and labor saving. 

  • High load-carrying capacity.

  • Adaptable to various construction projects.

  • All elements safely connected

  • Highly durable

     

3. Images for Cup-lock Scaffolding:

Cup-lock Scaffolding with Competitive Prices, Q235 Steel, with HDG

Cup-lock Scaffolding with Competitive Prices, Q235 Steel, with HDG

 

Cup-lock Scaffolding with Competitive Prices, Q235 Steel, with HDG

 

 4. FAQ of cup scaffolding

 

     a) What about of our after-sale services?

     Response will be carried out  in 24hours  after receiving any complain or request.

     Any formwork cost can be refund after order is confirmed. 

     If the products are not based on the requirements, there will be the relevant compensations made for you. 

 

    b) What about the package and shipping time?

    Packing: wood package and adhesive tape

    Shipping: by sea

    Shipping time: Normally small orders, it just1week business days to arrive your hand; When comes to the customs declaration, it may need 2weeks.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:When will the NYC's Guggenheim museum be free of that scaffolding?
My friend, the restoriation of the outside facede of the Guggenheim Museum should be completed in spring of 2008. The exterior restoration is part of $29 million restoration project to the 46 year building. Good luck Native New Yorker
Q:Hi i am 13 and going into 8th grade. i want to get a industrail piercing (scaffold)?
No don't do that.. That is a really masculine piercing. I've hurt it hurts pretty bad to. Get one cartilage or a tragus. Much more feminime and very cute.
Q:a 65 kg painter paints a side of a house while standing on a 5.5m long board w/c rests on a scaffold. the end?
1.692m, but you should have included a diagram, I am still not sure if you are talking about a cantilever force couple or a simple lever pivot..
Q:when there is an alternative route to my back garden to put up scaffolding,?
Call your lawyer.
Q:What's the story in March to the Scaffold?
Idee Fixe Definition
Q:There are many kinds of scaffolding market now, like what kind of scaffold
Because the service life of Pankou scaffold in 20 ~ 30 years period between and no maintenance, and the service life of the bowl scaffold is only 7 years, but every year maintenance is very convenient. Nine for the group so we recommend you buy Pankou scaffolding.
Q:A window washer is standing on a scaffold?
461.40N at the nearer end and 358.60N farther end.
Q:why did the minister visit the scaffold at night?
Because of the guilt he was suffering from, he decided to hold a vigil (a long period of staying awake) at the scaffold where Hester was chastised from their sin. He does this hopeful for a remedy of the pain he has endured.
Q:Where can I find 2nd hand/brand new H frames for scaffolds in Cebu?
while commuting in Cebu, look for on going construction in the surrounding. take time to get off and ask where they get their scaffoldings, they either fabricated, bought or rented it. from there you know where to start.
Q:What are the requirements for the removal of scaffolding
3, to the lower part of the scaffolding removed the last of a long pole, should be first in proper position of the erection of temporary bracing reinforcement, and then remove the wall; and by dividing the facade scaffolding removed when the ends do not remove scaffolding, should be set up the wall and cross bracing reinforcement according to the provisions

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range