Cup-lock Scaffolding with Competitive Prices, HDG Q235 Steel

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 pc
Supply Capability:
3000000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1. Structure of Cup-lock Scaffolding

Cup-lock Scaffolding consists of adapter plug of cup-lock, post, cross bar ,diagonal brace ,top bar, base and other fittings. The adapter plug of cup-lock is the core and consists of top cups, bottom cups, post ,ledger connections and limit pins of top cups.

 

It can be widely used for industrial and civil construction and maintenance, such as workshop, large gymnasium, conference& exhibition center conversation, billboard, market, dock, tunnel, subways, etc. used for mobile working platform installation of electrical & mechanical engineering, ship repair and other decoration engineering, for building temporary stand ,with simple roof frame, frame-connected Scaffolding can from temporary dormitory, depot and work shed.

 

2. Main Features of Cup-lock Scaffolding


.Multifunction: equipments of construction with different size and load of construction could be assembled, such as one-size double-sides scaffolding, props, etc. Applied to high-rise building, bridge, water tower, and so on.

.Avoid using bolt in assembly and low down labor intensity

.Reliable bending, shearing, torsional strength of dentation &cup-lock connection, the overall of it is more stable than normal

.Not easy to lose fastener, portable firm and easy to maintain and transport 

3. Cup-lock Scaffolding Images 

Cup-lock Scaffolding with Competitive Prices, HDG Q235 Steel

Cup-lock Scaffolding with Competitive Prices, HDG Q235 Steel

Cup-lock Scaffolding with Competitive Prices, HDG Q235 Steel

4. Cup-lock Scaffolding Specification

.There is a pair of adapter plugs of cup-lock every 0.5m-0.6m on the post and top bar

.5 times fast of adapter plug assembly and disassembly than normal 

.Assuring construction of high-rise scaffolding with the whole safety facilities, the safety and reliability in usage

 

5. FAQ of Cup-lock Scaffolding

1) What can we do for you? 

We can ensure the quality of the vinyl banner and avoid extra expenses for customers.    

    .We can provide you the professional design team.    

    .We can provide fashionable and newest styles for you.    

    .We can design the artwork for you.    

    . Please feel free to customize.  

 

2) What promises can be done by us?

  . If interested in Cup-lock Scaffolding, please feel free to write us for any QUOTE.

   . If printing required, please advise asap because the whole set need much more time to complete.

   . Please DO check goods when courier knocks your door and contact us asap if any issue.

 

3) What about of our after-sale service?

   . Response will be carried out in 24hours  after receiving any complain or request.

   . Frame-Connected Scaffolding cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.  

 

 4) What about the package and shipping time?

   .Packing:  As Customer's Requirements

    .Shipping: We have various shipping ways for our customers, such as express which including TNT,  DHL,  FEDEX, UPS, EMS, etc. ; by air/ sea, and we are VIP of these express.  

  .Shipping time:

    Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days

    Other mass qty of Cup-lock Scaffolding, we send them out by sea or by air to sea port or air port to save some shipping freight for our customers. By ocean, it may need 45~60days, by air, it may need 25~40days.  

 

 

 


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:scaffold piercing really bleeding?
Is there a reason you haven't any longer been to the ER or pressing care an prolonged time in the past? circulate there now. You gotta use some easy experience here. we will not make it easier to be conscious of what to do while it includes scientific judgements or making up your ideas. you are able to beware for your self.
Q:What kind of bowl buckle scaffold specifications, I would like to know what is the rack
Your question is very professional, just have time to help you find some information to see if you can not use! Pankou scaffolding specification as follows:
Q:Two window washers, Bob and Joe, are on a 3.00 m long, 295 N scaffold supported by two cables attached to its?
Rainwater forgot about the weight of plank itself... So: (0.5 m)×(910 N) + (1 m)×(500 N) + (1.5 m)×(295 N) + (2 m)×(730 N) = (3 m)× T₁ T₁ = 952.5 N (1 m)×(730 N) + (1.5 m)×(295 N) + (2 m)×(500 N) + (2.5 m)×(910 N) = (3 m)× T₂ T₂ = 1482.5 N Check: (952.5 N) + (1482.5 N) ?=? (730 N) + (295 N) + (500 N) + (910 N) (2435 N) !=! (2435 N) Seems OK ;-)
Q:How do each of the scaffold scenes in the Scarlet letter have Puritan and Romantic ideaology??
the first is puritanistic because of public humiliation and romanic because pearl notices her father at such a young age. the second because they are together as a fam(puritans did not belive in individualism) and romantic because the stars make an A in the sky. the third because of public confession and dimmesdale dies
Q:Construction of the bowl button steel scaffolding and fastener type scaffolding which cost high
Bowl button steel scaffolding is not commonly used, so the relative price of a little higher
Q:When will the NYC's Guggenheim museum be free of that scaffolding?
My friend, the restoriation of the outside facede of the Guggenheim Museum should be completed in spring of 2008. The exterior restoration is part of $29 million restoration project to the 46 year building. Good luck Native New Yorker
Q:Does getting a scaffold piercing hurt?
No good piercer (in the United States) would do an industrial/scaffold piercing on someone younger then 16 with parental consent. Any piercing (even lobes) is better done with a needle. The needle hurts less, is sterile (where a gun can't be sterilized), and the piercer has lots of experience and will use the right length of jewelry for YOUR anatomy. Mine didn't hurt much..the second hole was definately worse then the first though. It may be sore for months afterwords, they take a year to heal. The one I've had for 3 years still gets sore although it's fully healed.
Q:how long untill i can change my scaffolding bar?
Well it doesn't really matter what anyone else thinks as long as you like them, you are the one that has to live with them. and i would recommend leaving for about 4-6 weeks depending on how well and quick you heel as everybody heels different. ring the place were you had it done and they will be able to advise you more on it. Hope this helped
Q:I would like to ask the bowl buckle scaffold operating layer is what?
Its main function is to protect. Specific reference to JGJ 1302011 "construction fastener type steel pipe scaffolding safety technical specifications" in the relevant instructions, and illustrations.
Q:Cleaning my new scaffolding piercing?
nonono, industrials or infamous for infections. in case you do no longer sparkling it, think of how lots bacteria is going to be close to it considering all of the folds of the ear and the oils or your hair. I sparkling my business a minimum of two times on an primary basis, and that i've got yet to get an infection although. What I do is Sea Salt Soaks interior the morning and nighttime. I placed a sprint emu oil to advoid hypertrophic scarring. and that i've got saved my hair up on a daily basis considering getting it pierced to confirm my hair does not worsen it jointly as its nevertheless in its early healing section.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range