Cup-lock Scaffolding System for Shoring Formwork

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT or LC
Min Order Qty:
50 m²
Supply Capability:
1000 m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1. Structure of Cup-lock Scaffolding System for Shoring Formwork

Cup-lock Scaffolding consists of adapter plug of cup-lock, post, cross bar ,diagonal brace ,top bar, base and other fittings. The adapter plug of cup-lock is the core and consists of top cups, bottom cups, post ,ledger connections and limit pins of top cups.

 

It can be widely used for industrial and civil construction and maintenance, such as workshop, large gymnasium, conference& exhibition center conversation, billboard, market, dock, tunnel, subways, etc. used for mobile working platform installation of electrical & mechanical engineering, ship repair and other decoration engineering, for building temporary stand ,with simple roof frame, frame-connected Scaffolding can from temporary dormitory, depot and work shed.

 

2. Main Features of Cup-lock Scaffolding System for Shoring Formwork

Equipment of construction with different size and load of construction could be assembled, such as one-size double-sides scaffolding, props, etc. Applied to high-rise building, bridge, water tower, and so on.

Avoid using bolt in assembly and low down labor intensity

Reliable bending, shearing, torsional strength of dentition &cup-lock connection, the overall of it is more stable than normal

Not easy to lose fastener, portable firm and easy to maintain and transport 

 

3. Cup-lock Scaffolding System for Shoring Formwork Images

 

Cup-lock Scaffolding System for Shoring Formwork

 

Cup-lock Scaffolding System for Shoring Formwork

 

4. Cup-lock Scaffolding System for Shoring Formwork Specification

Cup-lock Scaffolding System for Shoring Formwork

 

5. FAQ of  Cup-lock Scaffolding System for Shoring Formwork

1) What can we do for you? 

    We can ensure the quality of the Cup-lock Scaffolding System for Shoring Formwork and avoid extra expenses for customers.    

    We can provide you the professional technical team.    

    We can provide professional building proposal for your project.       

    Please feel free to customize. 

 

2) What promises can be done by us?

    If interested in Cup-lock Scaffolding System for Shoring Formwork, please feel free to write us for any QUOTE.

    If need any technical and building assistance, we could provide on-site professional staff for instruction.

    Please DO check goods when courier knocks your door and contact us asap if any issueS.

 

3) What about of our after-sale services?

    Response will be carried out  in 24hours  after receiving any complain or request.

    Any formwork cost can be refund after order is confirmed. 

    If the products are not based on the requirements, there will be the relevant compensations made for you.  

 

 4) What about the package and shipping time?

    Packing: wood package and adhesive tape

    Shipping: by sea

    Shipping time: Normally small orders just takes 7 business days to arrive your hand;. When it comes to the customs declaration, it may need 2weeks.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Bowl buckle scaffold theory weight table who has, the distance is how much?
The bridge supports the use of bowl buckle scaffold in the majority, but also the use of portal scaffolding
Q:Scaffolding Tube Strength?
though that page doesn't seem to be quite complete
Q:How much for scaffold piercing in Los Angeles? (90039 area)?
It all depends on where you go. They can range between 25-35 dollars. Just remember to relax and eat a good meal before you go. Healing takes around 6 months to a year. Your piercer will instruct you on how to care for it. Always ask your piercer any and all questions you have.
Q:Industrial/Scaffold Piercings.?
Love them, but they hurt so bad to get pierced and to heal.
Q:Calculation method of various kinds of fasteners and fastening screws for engineering scaffold steel pipe
0.7 - the basic wind pressure reduction coefficient determined by the return period of 5 years. In some special cases, a value above 0.7 may be used, but not less than this value.More than W0, Z, beta Z, STW are in accordance with the "building structure load code" (GBJ9-87) of the corresponding provisions of the selection or calculation to determine, which STW 6.3.1 in accordance with its table thirty-second and thirty-sixth.
Q:What are the advantages of rental scaffolding
Fine design geometry and improve steel turnover material consumption from economic effect fastening steel frame equivalent per square meter construction steel consumption of about 15 kg (1) special screw fastener defects) easily lost; 2) node rod connected by partial sliding resistance load transfer in force to reduce its carrying capacity; 3 the fastener fastener connection quality) by itself quality significantly affected the operation adaptability of 1) to build various forms of scaffolding, the template support frame;
Q:Scaffolding steel pipe, the number of fasteners?Small wall scaffolding, formwork scaffolding support, the number of steel pipe and fastener calculation,
If the project is not too complicated, the use of a number of steel pipe fasteners in the case of small
Q:What kind of scaffolding used in engineering construction
Scaffolding has a single floor, double row fastener type steel pipe scaffolding, full fastener type steel pipe scaffolding, steel cantilever fastener type steel pipe scaffolding, full fastener type steel pipe support, etc..
Q:Scaffolding Cost for a Detached Dwelling?
I had a detached 4-bed house surrounded (soffit and barge boards to do) by scaffold to a high standard for £180 in Kent. Two weeks hire, assembly and dismantle included (they left it there for 3 weeks in fact). Pay more than 200 outside and you're being ripped-off...
Q:¿which tragic dead is better in the scaffold to end my tragic story of the forbbiden lovers?
Definitely the stake. Consumed by love and all that. Good luck with your story!

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range