Cup-lock Scaffolding High Quality System

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 pc
Supply Capability:
100000000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.   Structure of Cup-lock Scaffolding

Cup-lock Scaffolding consists of adapter plug of cup-lock, post, cross bar ,diagonal brace ,top bar, base and other fittings.It can be widely used for industrial and civil construction and maintenance, such as workshop, large gymnasium, conference& exhibition center conversation, billboard, market, dock, tunnel, subways, etc. used for mobile working platform installation of electrical & mechanical engineering, ship repair and other decoration engineering, for building temporary stand ,with simple roof frame, frame-connected Scaffolding can from temporary dormitory, depot and work shed.

 

2.   Main Features of Cup-lock Scaffolding

.Multifunction: equipments of construction with different size and load of construction could be assembled, such as one-size double-sides scaffolding, props, etc. Applied to high-rise building, bridge, water tower, and so on.

.Avoid using bolt in assembly and low down labor intensity

3.   Cup-lock Scaffolding Images

 

4.   Cup-lock Scaffolding Specification

1. Strength bearing capacity: Stable and reliable structure, strength bearing capacity.

 

2. Safe and reliable: The adapter has the reliable self-locking ability when it is designed with considering the gravity and force of friction.

 

3. Less lost: There is not scattered coupler, it can be reduced the least for the component.

 

4. Less maintenance: It is connected without the bolted, there is no to maintain.

 

5. Easy to manage: Components are neatly stacked and manufactured standard, it’s easy to manage on site and satisfied with civilized construction requirements at same time.


 

5.   FAQ of Cup-lock Scaffolding

1) What can we do for you? 

We can ensure the quality of the vinyl banner and avoid extra expenses for customers.    

    .We can provide you the professional design team.    

    .We can provide fashionable and newest styles for you.    

    .We can design the artwork for you.    

    . Please feel free to customize.  

 

2) What promises can be done by us?

  . If interested in Cup-lock Scaffolding, please feel free to write us for any QUOTE.

   . If printing required, please advise asap because the whole set need much more time to complete.

   . Please DO check goods when courier knocks your door and contact us asap if any issue.

 

3) What about of our after-sale service?

   . Response will be carried out in 24hours  after receiving any complain or request.

   . Frame-Connected Scaffolding cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.  

 

 4) What about the package and shipping time?

   .Packing:  As Customer's Requirements

    .Shipping: We have various shipping ways for our customers, such as express which including TNT,  DHL,  FEDEX, UPS, EMS, etc. ; by air/ sea, and we are VIP of these express.  

  .Shipping time:

    Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days. 

    Other mass qty of Cup-lock Scaffolding, we send them out by sea or by air to sea port or air port to save some shipping freight for our customers. By ocean, it may need 45~60days, by air, it may need 25~40days.  


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is scaffolding pole, bar, scissors support?
Bowl buckle steel pipe scaffolding when using steel pipe, as a single steel scaffolding, when the use of steel when the edge of the cross bar, for the steel based scaffolding
Q:what is differences between scaffold and scaffolding?
Scaffold is what scaffolding is constructed of.
Q:A brick is dropped from a high scaffold. What is its velocity after 2.9 s?
v=at (assuming acceleration is constant as it is in this case) acceleration is gravity, G=9.8 m/s or 10 m/s v=(10 m/s)2.9 29 m/s
Q:I want an industrial piercing?(Scaffolding)?
It can collapse your cartilage, if you get it done with a gun. If you go to a professional, and they do it with a needle, you'll be fine.
Q:Bridge formwork support bowl button steel scaffolding, you need to set the floor bar?
Bridge formwork support bowl buckle type steel pipe scaffold, need to set the sweeping rod.
Q:In the construction of the construction, the template and the selection of the scaffold has no corresponding specification
JGJ231-2010 construction of socket type plate type steel pipe scaffold safety technical regulationsTechnical code for safety of JGJ162-2008 construction formworkJGJ166-2008 technical code for safety of steel tubular scaffold with bowl buckle
Q:The bowl locking conditions of scaffolding, to determine what,
Now the general approach is to use artificial eye detection
Q:Bowl buckle scaffold is not a steel pipe scaffolding
Bowl buckle scaffold with steel scaffolding is different
Q:A window washer is standing on a scaffold?
461.40N at the nearer end and 358.60N farther end.
Q:musical elements of March to the Scaffold by Hector Berlioz and Danse Macabre by Saint Saens?
I would suggest you take the score (any good music library should have it) and listen to the music. That would give you all the information you need. It doesn't take THAT long.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range