Cup-lock Scaffolding for High-Efficiency, Great Reputation
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 15000 pc
- Supply Capability:
- 3000000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. Main Intriduction of Cup-lock Scaffolding:
Name: Cup Lock Scaffolding
Category: Scaffolding system
Material: Steel (Q235/Q345)
Size: as your requirement
Surface: Electro Galvanized/Self Color/Painted/HDG
2. The Advantages of Cup-lock Scaffolding:
The cup lock scaffolding is safety and reliable.
Convenient ,redundant utilization ration higher merit.
Low pressure fluid high strength welded pipe, welds through the carbon dioxide protection according to the specific shape welding becomes.
3. Images for Cup-lock Scaffolding:
4. FAQ
How about your company?
We are the leading manufacturer and exporter of construction equipments in Southern China. By conducting 5 fabricating factories which cover construction areas more than 50,000SQMT, we professionally manufactures high qualityConstruction scaffolds, formworks and Steel Structures, with annual full production capacity of 30,000 tons for scaffolds and 10,000 tons for formworks.
We resolutely put an end to unqualified products flowing into the market. At the same time, we will provide necessary follow-up service assurance.
Packing & Delivery Term?
Export standerd package or as customer's requirements.
- Q:Bridge formwork support bowl button steel scaffolding, you need to set the floor bar?
- Bridge formwork support bowl buckle type steel pipe scaffold, need to set the sweeping rod.
- Q:What kind of scaffolding used in engineering construction
- Fastener type steel pipe scaffold for engineering building".
- Q:The latest version of the external scaffolding erection norms and template engineering construction quality acceptance specification which two ah? Thank you
- The current template specification is JGJ162-2008 "construction formwork safety technical specifications"; belong to the high formwork project also must obey GB50666-2011 "concrete structure engineering construction code" fourth chapter
- Q:I bought 100 tons of scaffolding steel pipe, according to the 150 tons of rack pipe to prepare various kinds of fasteners and fastening screws. How to calculate.. Thank you all
- For flexural members:No combination of wind load for gamma 'm = 1.19Combination of wind load of gamma 'm = 1.19For axial compression member:No combination of wind load for gamma 'm = 1.59Combination of wind load of gamma 'm = 1.59
- Q:What's your opinion of them?
- love , i think they look really good.
- Q:The scaffold is 18 m long. A 650-N box sits 3.0 m from the left end. What is the tension in each wire? left wire = 520 N; right wire = 130 N left wire = 640 N; right wire = 210 N left wire = 195 N; right wire = 975 N left wire = 295 N; right wire = 1000 N can someone show me how to do this please :)
- Lets call left wire T1, right = T2 T1 = (200 x 9) + (650 x 15) = 11550 11550 = 18T1 11550/18 = 641.67 N T2 = (200 x 9) + (650 x 3) = 3750 3750 = 18T2 3750/18 = 208.33 N left wire = 640 N; right wire = 210 N
- Q:Pankou scaffolding function how powerful
- Scaffolding, low cost, high efficiency, convenient disassembly build effort, on the ground after the installation of integral hoisting
- Q:What is scaffolding pole, bar, scissors support?
- Bowl buckle steel pipe scaffolding when using steel pipe, as a single steel scaffolding, when the use of steel when the edge of the cross bar, for the steel based scaffolding
- Q:In the first scaffold scene, which is at the beginning of the book with Hester's sentencing of three hours on the scaffold. This is when Pearl is still a baby. And the last scene where things are being revealed at the end of the book. What time of day are both of those? Like afternoon, evening; month; season, etc. Do you guys have any info about that? It doesn't have to be all I listed just something that says the time they occurred.Thanks.:)
- At the beginning of the Market Place chapter..it starts off with The grass plot before the jail, in Prison Lane, ona certain summer morning.... so that one is morning and in the summer and the last one....is probably in mid morning b/c its after a sermon and also..i think in the forest chapter it says something about it being in autumn *.*
- Q:Now there are many kinds of scaffolding market, like what wheel buckle scaffolding, scaffolding, scaffolding, what. I would like to buy a large number of scaffolding, and then lease out, which type of scaffolding to buy what is better?
- Especially you want to rent it, the more appropriate scaffolding. Because the service life of Pankou scaffold in 20 ~ 30 years and during the basic need of maintenance
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Cup-lock Scaffolding for High-Efficiency, Great Reputation
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 15000 pc
- Supply Capability:
- 3000000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products