Cup Lock Scaffolding /Cuplock Scaffolding

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
10000 PCS
Supply Capability:
10000 PCS/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

Model Number:

cuplock scaffolding





Size:

48mm

material:

Q235/Q345

surface:

Paint,Galvanized,HDG

thickness:

2.5mm/2.75mm/3.0mm/3.25mm





Packaging & Delivery

Packaging Detail:in bulk or as customer's require
Delivery Detail:25-30 days after receiving deposit

Specifications

cuplock scaffolding 
Material:Q235 
Surface: HDG, Color:Silver 
Function: Connection &Support


Cuplock Scaffolding

Cuplock scaffolding system is widely used for false work support structures. Its high leg load and wide range of components gives the system the capacity to tackle virtually and soffit support application with a cost-effective solution. For formwork support, a vide number of grid variations can be created to suite differing load requirements and decking systems

Basic information of scaffolding:


Product

Cup lock scaffolding

Material

Q235 carbon steel, Q345, Q195

Surface treatment

Electronic galvanized, hot galvanized and print

Color

Red, blue, yellow, green, bright galvanized

Package

Steel belt or iron plate/Customized

Accessories

Standard, ledger, diagonal brace, upper cup, bottom cup, steel plank, bracket

Technique Delivery detail

High Frequency Welding

MOQ

100pcs

Delivery detail Payment

10-25 Days After Receiving The Deposit & Confirm All Information

Payment Standard

30% deposit by T/T, pay for the balance when you see the copy of B/L

Standard

EN74/ BS1137/ JIS

Production capability

50000 pieces/month


 


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How long after getting an industrial/scaffold ear piercing does it stop hurting?
go the the dr or you piercer
Q:Industrial Scaffold HELP!?
Antiseptics are too harsh for a healing piercing, the pain, swelling and redness is completely normal. Stop using antiseptic and go to the grocery store to get some non-iodized sea salt, its only a few dollars and you can find it in the spice aisle where the regular salt is.
Q:How to remove the disc scaffolding ah, do not know how to get through the decoration
First, in the demolition of the mobile frame should pay attention to the partner can not be replaced, it is better to slow down or stop work, do not have the experience of the construction personnel to carry out the demolition work.
Q:Is it easier to build a disc scaffolding system than a bowl buckle scaffold?
It is widely used in bridge engineering, tunnel engineering, workshop, elevated water tower, power plant, oil refinery... Support design and special plant, is also applicable to overpass span scaffolding, storage shelves, chimney, water tower and indoor and outdoor decoration, large concert stage, the background frame, stands, balcony frame, stairs, other party system, stage setting, sports watch station project.
Q:Which piercing hurts less - helix or scaffold?
The first piercing of the scaffold will feel the same as getting your helix done. The second will hurt a bit more. The healing of a scaffold, however, will probably be more painful than just one helix piercing and will take a bit longer.
Q:The relevant provisions of the demolition of the external wall scaffold:
Two, removal of scaffolding, should meet the following requirements:1, the demolition work must be from top to bottom layer by layer, prohibited from top to bottom operation at the same time;2, even the wall must be removed with the scaffolding layer by layer, is strictly prohibited even after the first wall or a few layers of the demolition of the demolition of the scaffolding; demolition of the height difference should not be greater than 2 steps, such as the height difference is greater than the step, should be added to strengthen the wall;3, when the scaffolding down to the bottom of a long rod height (about 6.5m), should be in the appropriate position to set up temporary support reinforcement, and then dismantle the wall;4, when the scaffolding to take the sub section, the demolition of the sub elevation, the demolition of the scaffold should not be removed at both ends, should be added to the wall and lateral oblique reinforcement.
Q:what is common cause of formwork and scaffolding failure during construction?
Improper assembly seems to be a big one. Workers often neglect to install the internal diagonal from upper corner to opposite lower corner when it comes to scaffolding. Formwork usually fails by inadequate bracing at the bottom as hydrostatic pressure builds. This can be mitigated to some extent by allowing the concrete to set up a bit before pouring the next layer. For earth formwork, you have to be real careful about expansive clay becoming saturated and overwhelming the bracing as it expands.
Q:Is there any requirement for the installation of the disc scaffold?
Regardless of the site is the use of their own disc foot accessories, or rental of disc scaffolding accessories, before use should be carried out preliminary calculations, see how many accessories,
Q:Industrial / scaffold piercings - pierced with rings?
Scaffold Piercing Jewellery
Q:Is my scaffold piercing infected?
it sounds like it's just irritated, if it's infected it will be secreting puss. Have you tried to soak it in the rock salt solution? Soak two cotton balls and put one on each side on the piercing and keep it there for 10 minutes a day. And make sure the antiseptic spray has zero alcohol in it because that can irritate it and prolong healing. Try this for a few days and if it's not getting better then go see your doctor.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range