Product Description:

1.Structure of cup lock Description

cup lock system is one of the most popular used scaffolding system in the world.It is consisted of cup lock,vertical,ledger,limit pins,blades and base etc.

Packaging & Delivery

Packaging Details:

Pallet or bag or upon client's request

Delivery Detail:

35days

2.Main Features of cup lock

1) Using less pipes

2) Easy to install

3) It can be used again and again for nearly 20years

3.Cup lock product pictures:

Cup Lock  Scaffolding by Painting for Construction

 4.Cup lock Product Description

Type:

ringlock scaffolding diagonal Brace

specification

Ø48.3×3.20

material:

steel Q235

Finished

Hot DIP galvanized, painted

Diagonal length(m)

Weight(kg)

0.9m * 1.25m

6.28

1.25m * 1.8m

8.6

1.25m * 2.7m

11.45

  5.FAQ

 We have organized several common questions for our clients,may help you sincerely:

1) How many Scaffolding your company have?

Here comes our 5 types of Scaffolding systems:

-Cup lock Scaffolding(C-Lock Scaffolding)

-Ring lock Scaffolding

-Kwistage Scaffolding

-H-frame Scaffolding

-ID15 Scaffolding Tower, this type Scaffolding is the most widely used in construction, such like bridge.

2) How long can we receive the product after purchase?

Lead time is about 30days after getting the signed PI and deposit

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Disc scaffolding and bowl buckle scaffolding which kind of bridge support better?
3 products have a high degree of economic, the use of more convenient and efficient in use, only need to put the plug into the hole of the ends of the cross rod pole corresponding, and then knock tightly, the quality of the demolition ride fast and overlapping is the traditional scaffold cannot do. Its erection speed is 4-8 times more than 2 times that of steel pipe scaffold. Reduce labor time and labor remuneration, reduce shipping costs to reduce the overall. The joint is reasonable in structure, easy in operation, light and handy. Vertical rod weight than the same length of the size of the bowl buckle 6-9%.
Q:The relevant provisions of the demolition of the external wall scaffold:
The relevant provisions of the demolition of the external wall scaffold:First, the removal of scaffolding before the accurate preparation work should meet the following requirements:1, should be a comprehensive inspection of the scaffold fastener connection, even wall pieces, support system, etc. are in line with the requirements of the structure;2, should be based on the results of the inspection to improve the construction organization design of the demolition order and measures, approved by the competent authorities before the implementation;3, should remove the scaffolding on the debris and ground obstacles.
Q:Construction scaffolding fastener weight?
Weight: 48kg above 3, single piece weight in 20Kg or so, easy to carry and construction operation. 4, the installation and removal of only bare handed, greatly improved the efficiency of the door scaffolding installed than the fastener steel tube fast 1/2 time, faster than bamboo scaffolding 2/3 time. 2 the maximum weight of a single piece is not more than 20 kg, so lifting, assembling and disassembling and transportation are convenient
Q:New features of quick dismantling scaffolding?
Material: the main keel is made of cold rolled steel with 2mm thickness
Q:What are the requirements for the construction of the scaffolding structure?
The scaffold structure is basically in the two-dimensional grid and a substantially two-dimensional outer grid connected grid, each of the included in the expected load conditions of scaffolding structure after long time has a bearing component of relatively stable strength. The anchor is connected with the support arm and has a first leg in the form of a bar or rod. The anchor may be aligned such that the first leg is substantially parallel to the longitudinal axis of the arm, and the distal end of the first leg extends beyond the arm. The structure of the scaffold also comprises one or more platforms, each platform is arranged between the two corresponding bearing bars of the inner and outer grid frames at the same height.
Q:Should the WWE put John Cena in a triple threat thumbtack scaffold cage of death with New Jack & Necro Butcher?
They make Cena look like Kurt Angle in there!
Q:Where to use scaffolding in construction
1, set up a high-level scaffolding, the various materials used must meet the quality requirements.2, the foundation must be firm, before the erection of the calculation, to meet the load requirements, and according to the construction code set up, do drainage measures.3, scaffolding erection technical requirements shall comply with the relevant provisions of the code.4, we must attach great importance to a variety of structural measures: scissors, pull nodes, etc. should be set according to requirements.
Q:Targus or scaffold piercing?
If you want to be different AND have something that looks really cute, get a micro dermal. Either on your collar bone, or lower back dimples if you have cute ones! Good luck hun!
Q:29 meters outside the walls of the house of the two rows of steel pipe scaffolding installation, demolition
When the double row scaffolding longitudinal distance 1.5m, horizontal distance 1.2m, step 1.8m, as per 100 square meters of double row scaffolding rod parts
Q:What are the dangers of scaffolding
Analysis of the types of scaffolding accidents1) the entire frame dumping or local collapse frame2) the whole frame instability and vertical collapse3) personnel from scaffold falling

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range