Crane TC7050 Construction Equipment Building Machinery Distributor Sales

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Tower Crane TC7050 Description:

1.CMAX Tower Crane TC7050  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC7050 can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC7050 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC7050  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC7050  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.


Tower Crane TC7050 Parameter:

 Max. working range 70m, tip lifting weight 5T and Max. lifting weight 20T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 50

Max height with attachment (m) 200

Working range can be adjusted (m) 50、55、60、65、70

Min working range (m) 2.5

Max lifting capacity (t) 20

Tip load @ 50m (t) 5


Tower Crane TC7050 Packaging & Delivery:

40HQ container

20~25days after deposit


Tower Crane TC7050 Diagram:

Crane TC7050 Construction Equipment Building Machinery Distributor Sales

Crane TC7050 Construction Equipment Building Machinery Distributor Sales

Tower Crane TC7050 Technical Sheet:

Crane TC7050 Construction Equipment Building Machinery Distributor Sales

Tower Crane TC7050 FAQ:

1.What is tower crane?

Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

2. What is the meaning of the tower crane’s code?

Take Tower Crane TC7050 for example, the first two letters “TC” means Tower Crane, “70”means jib length is 70 meter, and the last two letter “50” means the tip load is :5 ton.

3. What is the principal to quote the right tower crane to the client?

First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:hey i have to submit this information about siberian cranes..please help me out....?
This species breeds in arctic Russia in Yakutia and western Siberia. It is a long distance migrant. The eastern population winters on the Yangtze River in China, the central population at Keoladeo National Park, India and the western population in Fereidoonkenar and Esfahan in Iran. It breeds and winters in wetlands, where it feeds on the shoots, roots and tubers of aquatic plants. This is a large white crane. Large males can exceed 140 cm (55 inches) in length and weigh over 10 kg (22 lbs). Adults are all white, except for a dark red mask extending from the bill to behind the eye. It has a yellow iris and reddish legs. The male is slightly larger than the female. Juveniles have a feathered mask and buff or cinnamon plumage. The voice is flute-like and musical. The status of this crane is critical, as it is expected to undergo a rapid population decline in the near future. The wintering site in China holding 95% of the population is threatened by hydrological changes caused by the Three Gorges Dam. Historic records from India suggest that a number of them wintered there in the past. This number has steadily declined and the birds are no longer found there. Mr. Rutledge of Entally told me that for twenty years he tried unsuccessfully to get live specimens of this crane, but did not succeed till a few years ago, when he and one of the native dealers got so many that the market was quite glutted, and many were sent to Europe. Since then the bird got scarce again, so this was evidently only a temporary invasion. —Frank Finn, Frank Finn in How to know the Indian waders. 1906 The Siberian Crane is one of the species to which the Agreement on the Conservation of African-Eurasian Migratory Waterbirds (AEWA) applies and is subject of a Memorandum of Understanding concluded under the Bonn Convention. =]
Q:What is the minimum radius of a tower crane?
Luffing jib crane luffing mechanism to control the lifting radius, which is lifting and landing boom.At the minimum radius, the boom is angled to the vertical.
Q:How Illegal is Crane Climbing?
It's quite illegal. The penalties will be severe. That's nice you think you take responsibility. When you fall and injure yourself, you will not have the money to pay your medical bills, including your years on life support in a coma, etc. You'll be dumping that responsibility on everyone else. You do not just magically take responsibility by saying you do.
Q:How good a job do you think Crane did in voicing the theme of pride/morales in Red Badge of Courage?
If you believed in the characters with their flaws and their goals, Crane did a good job. Henry Fleming's attitudes towards heroism and war seem to be changing as his experiences increase. What is significant about both pride and fear?
Q:A crane lifts a 2355 N bucket containing 1.81 m3 of soil (density=2084 kg/m3) to a height of 7.56 m.?
W=Fdcos(angle) W=mgh=2355(7.56)=17803.8 J
Q:What is the insulation resistance of tower crane?
The lightning resistance of tower crane (tower crane) on the construction site shall be no more than 4 ohms.I. tower crane GB/T 5031--20085.5.5.9 lightning protectionIn order to avoid lightning stroke, the main structure of the tower crane, the motor frame and all the electrical equipment metal shell, wire metal protection tube should be reliable grounding, and its grounding resistance should be no more than 4 ohms. When multiple repetitive earthing is adopted, the grounding resistance shall be no more than 10 ohms.
Q:How to do a simple Fujian White Crane block?
Not sure if there is a video but if you check out Analysis of Shaolin Chin Na by Dr. Yang Jwing-Ming you might find something.
Q:in the red badge of courage explain the mechanical metaphor crane uses to describe war?
I don't have a copy of TRBOC around but what you want to look for is a passage in which war is compared to, say, a machine of some sort.
Q:What measures should be taken to make tower cranes stable?
The fatigue test data show that the fatigue life of the phosphating coating of steel wire rope is about 3 times of the same structure light steel wire rope (laboratory comparable conditions), not easy to wear and corrosion is not easy to cause the service life of wire rope large amplitude extension. Manganese phosphating is wear resistant phosphating, which can solve the wear problem in the use of wire rope and improve the corrosion resistance. It is for reference only
Q:Is it difficult to test tower cranes?
A tower crane installation scheme, 1, compilation basis, project overview, working environment, 2 workers and 3 endurance calculation and installation equipment for 4, installation procedures, methods and requirements for 5, commissioning record 6, two safety technical measures, safety technical disclosure, three installation foundation concrete test report of four, the tower crane installation and acceptance of table five, safety supervision station issued a permit for six, seven, demolition demolition project safety technical clarificaiton tower crane installation scheme project name: preparation: position (title): Approval: job (title): the construction unit: tower crane installation demolition project, the preparatory work before construction: 1. The tower crane installation position, according to the effective range of the construction requirements, site conditions and the role of tower crane, convenient installation and disassembly, the tower crane configuration in 17 axis to 18 Between the axis, away from the outer wall of 5 meters, with 11 standard section. 2, the basis of the principle, the use of concrete foundation, strictly according to random basis drawing. 3, the examination of concrete pressure report, tower foundation has been completed by design and construction, the safety group acceptance, the basic test block delivery, after the test pressure qualified, must be installed. 4. The installation site is level and the channel is repaired. 5, transport parts admission

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range