Crane TC7034 Construction Equipmen Building Machinery Distributor Sales

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Tower Crane TC7034 Description:

1.CMAX Tower Crane TC7034  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC7034 can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC7034 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC7034  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC7034  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.


Tower Crane TC7034 Parameter:

 Max. working range 70m, tip lifting weight 3.4T and Max. lifting weight 12T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 50

Max height with attachment (m) 200

Working range can be adjusted (m) 50、55、60、65、70

Min working range (m) 2.5

Max lifting capacity (t) 12

Tip load @ 50m (t) 3.4


Tower Crane TC7034  Packaging & Delivery:

40HQ container

20~25days after deposit


Tower Crane TC7034 Diagram:

Crane TC7034 Construction Equipmen Building Machinery Distributor Sales

Crane TC7034 Construction Equipmen Building Machinery Distributor Sales

Tower Crane TC7034 Technical Sheet:

Crane TC7034 Construction Equipmen Building Machinery Distributor Sales

Tower Crane TC7034 FAQ:

1.What is tower crane?

Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

2. What is the meaning of the tower crane’s code?

Take Tower Crane TC7034 for example, the first two letters “TC” means Tower Crane, “70”means jib length is 70 meter, and the last two letter “34” means the tip load is :3.4 ton.

3. What is the principal to quote the right tower crane to the client?

First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Is making 1000 cranes a good gift to give to my friend?
A 1000 cranes set is a lovely thought would be a wonderful present. But you have one problem. How many boxes will it take to ship 1000 origami cranes to Japan? How much will it cost? Remember, airmail is very expensive, USPS doesn't do overseas surface mail anymore. Mailing parcels to Japan with DHL/UPS would cost you at least $80 for 20 pounds or less. You would do better to send your friend cash by wire transfer. Furthermore, since your friend will be in Japan for 12 months, I would guess his living quarters are not spacious. The average home is only 1000 sq feet in size. Apartments can be as tiny as 100 sq.ft. Where will he put 1000 cranes? He will have it for a few months before he has to pack to return home. What will he do then? Toss the cranes or ship them home? I believe he would prefer to have the wire transfer. Cost of living in Japan is high. Cash is going to be so appreciated even if 1000 cranes gift is a sweet sentimentality. Check the sites referenced for cost of shipping.
Q:What is a CCRadio ? (C. Crane)?
Hard to say much about it without knowing the model #. DX = distance in radio parlance.
Q:What is the definition of lifting, slewing and luffing of tower cranes?
Rotary is cantilever tower crane tower crane rotary shaft winding;Is the hook shaft distance amplitude change;
Q:Best structural crane design?
Is this for a nuclear power station? If 2500 Te and 60m really are the specified loads and span then it is likely that it will be used very seldom. In theory you can design for any load to be lifted but maintenance on a crane system that is used once a year (10 years?) is a real problem. The main items to consider are: Availability of winches and bogies which then dictates running beam and rail sizes. For the spanning beam several alternative sizes needed to be designed and then costed. It will be not just weight but transport costs that determine the most efficient sizes The overall height of the crane will then determine the required roof height assuming that the crane is under cover. For comparison the Harland and Wolf cranes in Belfast called Samson and Goliath can lift 840 Tonnes each. Overall design needs to consider speed of travel, acceleration and deceleration rates and a host of other things.
Q:A crane lifts a load of 3000 kg to a height of 8.5 meters in 15 seconds?
The work done (W)= Force*Distance. Force is 9.81*3000kg. So W = 9.81*3000*8.5 = 250,155 J Power (P)= Work(W)/Time(t) = 250,155/15 = 16,677 W 60% efficiency means that the lift is only using 60% of its maximum amount of power output. So to find 100% (lets call it x) of the crane's efficiency, consider the following: x * 0.6 = 16,677 x = 16,677 / 0.6 = 27,795 W Total mechanical energy in a system remains constant, so the kinetic energy the moment it hits the ground equals the potential energy when it is still hanging in the air. Potential energy = mgh = 3000x9.81x8.5 = 250,155 J You know this is correct, because it is the same amount of work the crane performed on the object to lift it.
Q: why use 'and to also making the cranes', not 'to also make the cranes'?
I personally would write it as... So, we decided to do a show on the earthquake and to make origami cranes. However, for proper English grammar, your idea of saying to also make the cranes is correct for an addition with and. The sentence fragment ... and to also making the cranes... would not work because also is a interrupter to show continuation and is not a verb. To make is an infinitive so adding also would not allow the conjugation of the infinitive due to the rule that a verb cannot follow a verb unless if the second verb is in an infinitive form. And is never used with commas unless there are items in series such as ducks, chickens, and hens. And is not correct after a comma unless if there are items in series. In addition, the items in series rule can change slightly if there is a description with the items or a sentence fragment such as with the sentence... There are several large hens with an egg; a few with large wings; and a few with a large pile of food. In this situation a semicolon(;) is used to help people know that it is a series with a group of sentence fragments. If you need help contact me or find help with items in series, types of sentences, sentence fragments, and sentence interrupters. I am learning to speak Spanish so I am willing to help anyone with English because I know how difficult it can be to learn English.
Q:How to distinguish self lifting tower crane with counterweight and lifting tower crane without counterweight
1 self lifting tower cranes with counterweight are common tower cap tower cranes, plate type tower cranes and flat head tower cranes, characterized by a counterweight made of several concrete on the balance arm,
Q:What is the difference between lifting height of tower crane and independent height?
It is not the kind of independent highly rigid or flexible attachment function when the tower reached the maximum height, lifting height of the tower is at the maximum height and the minimum amplitude in hook, hook support face datum allows the maximum vertical distance of tower crane.
Q:A thousand cranes' gift? (Korean context)?
I think that gift would be perfect for a teacher! If I was a teacher and a student gave that to me i'd cry. Have you heard about that book of the 1000 paper cranes? (Can't remember the name) but it says if you make a 1000 paper cranes then you get a wish. Well anyways make sure you present the presents nicely. Like put the cranes in a pretty jar with a beautiful ribbon wrapped around it and get flowers that're her favorite colors.
Q:In the story Cranes, what was Tokchae's mission for the league?
The main idea of Cranes by Hwang Sun-Won is more of a symbolic thing; he uses different objects such as chestnuts and cigarettes, as well as the cranes in the story to convey his hope and his dream, along with his message. He is expressing the power of war, particularly civil war, which can rip apart families, neighbors and the best of friends. The story, unlike many other tragic civil war tales, is not focused on the idealogical difference btw Tok-Chae and Song-Sam. Rather, it is about the human tragedy of the Korean War. Tok-Chae and Song-Sam were ripped apart by the War. Song-Sam, on his return to his village, he finds Tok-Chae and decides to escort him to a Public Peace Police office a few miles away. On the way, he gets flashbacks and talks with Tok-Chae. These things help to change his mind and he frees Tok-Chae. This is symbolized by the two cranes which soared high into the sky. Hwang-Sun Won conveys his message effectively; unification will be achieved and is needed to repair such ties like Tok-Chae and Song-Sam. He is saying that the two cranes will fly together once more.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range