Crane TC6024 Sale Construction Equipment Building Machineruy Wholesaler Sales

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Tower Crane TC6024 Description:

1.CMAX Tower Crane TC6024  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC6024  can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC6024has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC6024  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC6024  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.


Tower Crane TC6024  Parameter:

 Max. working range 60m, tip lifting weight 2.4T and Max. lifting weight 10T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 50.5

Max height with attachment (m) 200

Working range can be adjusted (m) 48、54、60

Min working range (m) 2.5

Max lifting capacity (t) 10

Tip load @ 50m (t) 2.4


Tower Crane TC6024  Packaging & Delivery:

40HQ container

20~25days after deposit


Tower Crane TC024 Diagram:

Crane TC6024 Sale Construction Equipment Building Machineruy Wholesaler Sales


\Crane TC6024 Sale Construction Equipment Building Machineruy Wholesaler Sales\

Tower Crane TC6024 Technical Sheet:

Crane TC6024 Sale Construction Equipment Building Machineruy Wholesaler Sales

Tower Crane TC6024 FAQ:

1.What is tower crane?

Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

2. What is the meaning of the tower crane’s code?

Take Tower Crane TC6024 for example, the first two letters “TC” means Tower Crane, “60”means jib length is 60 meter, and the last two letter “24” means the tip load is :2.4 ton.

3. What is the principal to quote the right tower crane to the client?

First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the construction cranes? 50
Tower crane, crane, man goods elevator, lift, there are national standards
Q:Tower crane 5610 why call QTZ63 tower crane, 5613 call QTZ806015, call QTZ100
As for the calculation method, the weight of a simple arm length * arm tip can not be used, because the nominal lifting torque of the tower crane is not calculated at the maximum amplitude.However, the maximum weight can be calculated by the maximum amplitude of the maximum weight, such as 5613 tower cranes, the maximum lifting capacity of 6 tons, while the maximum variable distance of 6 tons reached 15m, 60KN * 15m=800KN.m.The above is only my personal understanding of the tower crane, but I am not a professional construction machinery, the above calculations do not know whether it is reasonable, I hope to help you.
Q:How many tons of tower crane QTZ80A lifting?
Lifting torque = mass * radius of gyration (amplitude). That is to say, the bigger the weight is small.
Q:How to distinguish self lifting tower crane with counterweight and lifting tower crane without counterweight
1 self lifting tower cranes with counterweight are common tower cap tower cranes, plate type tower cranes and flat head tower cranes, characterized by a counterweight made of several concrete on the balance arm,
Q:Equipment safety of tower crane
Safe distance tower and transmission line is not up to the requirements of the tower frame door frame to design, erection principle to power erection, do not use metal materials, bamboo and other materials can be used. The distance between a bamboo pole and a power line shall not be less than 1m, and a certain degree of stability shall be taken to prevent the wind from blowing. The tower crane height and bottom bearing size ratio is large, and the center of gravity of the tower body, high torque, braking frequency, impact force, in order to increase its stability, we will analysis the main causes of the tilting of the tower crane has the following:Overloading. Different types of cranes usually adopts the lifting torque based control, when the amplitude exceeds the rated load weight increase or the corresponding weights, the overturning moment more than stable moment of it, it may cause the collapse of the tower crane.Two, inclined hanging. Slant weights will increase its overturning moment, the lifting point will produce horizontal force and vertical force on the crane, bottom supporting point will produce an additional overturning moment, and the stability coefficient is reduced, resulting in tower crane collapse.Three, the tower crane foundation is uneven, the ground endurance is insufficient, the perpendicularity error is too big, also can cause the tower crane to overturn the moment to increase, causes the tower crane stability to reduce. Therefore, we should proceed from these key factors to strictly check, check and check, and prevent major equipment personal safety accidents. State explicitly eliminated the model should resolutely prohibit the use of, in disrepair, tower crane in the identification of the repair, to limit the use of load, tower crane for the use of fixed number of years there is no uniform standards, opinions vary, different places have different provisions.
Q:The special equipment specified by the state is a periodical inspection cycle, wherein the crane is carried out every many years
(two) small light lifting equipment, bridge crane, gantry crane, gantry crane, cable crane, crane mast, railway crane, jib crane, mechanical parking equipment every 2 years 1 times, the crane annual molten metal and hot metal 1.The rated load test, static load test and dynamic load test shall be carried out in the first test and the first periodic inspection, and the rated load test shall be carried out 1 times after each of the 1 inspection periods.The inspection process, the existence of major risks of hoisting machinery (such as special work environment, frequent accidents, etc.), inspection agencies approved by the provincial quality technical supervision department agree, can be appropriate to shorten the regular inspection period, but the short period of not less than 6 months.
Q:What kind of bodies are tower cranes made of?
First, the working mechanism of tower cranesThe working mechanism of tower crane is usually composed of lifting mechanism, luffing mechanism, slewing mechanism, hydraulic jacking mechanism and running mechanism.The hoisting mechanism to realize heavy vertical up and down movement; luffing mechanism and slewing mechanism to achieve weight moving in two horizontal directions; hydraulic lifting mechanism of standard section, increase or decrease, so as to increase or decrease the tower; range of weights can achieve walking mechanism in tower crane and force of arbitrary space motion.
Q:How many meters does the tower crane installation height require expert proof?
The installation, disassembly and jacking of tower cranes must be carried out by experts
Q:Examples of filling and acceptance forms for tower cranes and examples of filling in.
The 1 conclusion is "qualified" project, fill out the "tick".2, the conclusion is "unqualified" project, fill in "x"". Part of the "unqualified" sub item should also be painted on its number *".
Q:What are the lifting moment requirements for tower cranes?
1. Tower crane consists of three parts: metal structure, working mechanism and electrical system. The three main technical parameters are lifting moment, lifting weight and working speed. Lifting moment refers to the boom as the basic arm length maximum amplitude corresponding to the rated lifting weight of product, product or maximum weight with the corresponding inflection point.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range