Crane TC4808 Construction Equipment Building Machinery

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Tower Crane TC4808 Description:

1.CMAX Tower Crane TC4808  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC4808  can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC4808 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC4808  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC4808  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.


Tower Crane TC4808  Parameter:

 Max. working range 48m, tip lifting weight 0.8T and Max. lifting weight 4T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 31.5

Max height with attachment (m) 110

Working range can be adjusted (m) 38、43、48

Min working range (m) 2.25

Max lifting capacity (t) 4

Tip load @ 48m (t) 0.8


Tower Crane TC5013   Packaging & Delivery:

40HQ container

20~25days after deposit


Tower Crane TC5013 Diagram:

Crane TC4808 Construction Equipment Building MachineryCrane TC4808 Construction Equipment Building Machinery

Tower Crane TC4808 Technical Shee:

Crane TC4808 Construction Equipment Building Machinery

Tower Crane TC4808 FAQ:

1.What is tower crane?

Tower crane is a modern form of balance crane that consist of the same basic parts Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

2. What is the meaning of the tower crane’s code?

Take Tower Crane TC4808  for example, the first two letters “TC” means Tower Crane, “48” means jib length is 48 meter, and the last two letter “08” means the tip load is :0.8 ton.

3. What is the principal to quote the right tower crane to the client?

First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Is a tower crane a fixed type crane? Still can walk? Thank you
It can also be called a fixed crane. But there are many kinds of fixed cranes.
Q:What are the special operators of tower cranes?
The tower has special operations personnel of heavy machinery refers to the construction site in the tower crane division signal cable, installation and disassembly, the driver, and the demolition work of gondola installation, may cause serious harm to themselves, others and the surrounding facilities operations personnel.
Q:Tower crane 4 how to change the rate of 2 magnification, how to change, say detailed points
At this point, the rope will be turned into 2 fold!Some manufacturers produce pulley, also need to be in the car, and then the magnification pulley with pin shaft fixed in the car!
Q:Emergency treatment of interrupted electricity during lifting of tower crane
It is very dangerous to stop the electricity during the lifting of tower crane. Because the slewing brake is missing, the tower crane is very dangerous because the wind rotates.
Q:How to explain and classify the types of tower cranes? What do QTZ80 and Q5510 mean?
80 is lifting torque of 800 KN.M, 5510 is 55 meters, big arm of the front crane 1 tons
Q:How do tower cranes rise?
The weight and concrete foundation shall be made in advance and marked, and the ground ground endurance shall be no less than 20T per square meter. The chassis and standard sections are then assembled on this basis. The standard section of tower crane is the main part of the main part of tower crane. It is also the main role of heightening the height of tower crane". In the construction process, tower crane accompanied by the rise of buildings, naturally need to heighten. When the tower is hoisted, the upper frame is raised upwards with the jack up, so that there is a space between the tower body and the frame, and the standard section of the tower body is installed in the space. In this way, the purpose of the tower crane is realized.
Q:What is the difference between crawler crane and tower crane?
There are many differencesThe crawler is used to transport items in a smaller range of motion (site)A tower, used for construction, stationary, or maneuvering along a railroad track.Crawler can easily reach the magnitude of 50 tons or moreMore than ten tons of tower are relatively commonTrack internal combustion engine, hydraulicTower type general power consumptionWait, wait......
Q:The special equipment specified by the state is a periodical inspection cycle, wherein the crane is carried out every many years
(two) small light lifting equipment, bridge crane, gantry crane, gantry crane, cable crane, crane mast, railway crane, jib crane, mechanical parking equipment every 2 years 1 times, the crane annual molten metal and hot metal 1.The rated load test, static load test and dynamic load test shall be carried out in the first test and the first periodic inspection, and the rated load test shall be carried out 1 times after each of the 1 inspection periods.The inspection process, the existence of major risks of hoisting machinery (such as special work environment, frequent accidents, etc.), inspection agencies approved by the provincial quality technical supervision department agree, can be appropriate to shorten the regular inspection period, but the short period of not less than 6 months.
Q:What is the function of the balance valve in the hydraulic jacking system of tower crane?
The function of the balance valve is to maintain the balance of the oil pressure, the hydraulic oil delivery flow is stable, so that the tower crane jacket and the upper part of the lift, disassembly, standard time, lift and smooth.
Q:What is the free height of a tower crane?
The free height of tower crane is different according to the size of tower crane.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range