Couplers Rebar Steel from Jiangsu China with High Quality

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
30000 pc
Supply Capability:
300000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Couplers Rebar Steel from Jiangsu China in High Quality

1.Description of Couplers Rebar Steel from Jiangsu China in High Quality:

Lapped joints are not always an appropriate means of connecting rebar. The use of Steel Rebar Couplers can simplify the design and construction of reinforced concrete and reduce the amount of reinforcement required. 


The threaded steel coupler system is designed as a threaded reinforcement connection with 100% load transmission. The steel coupler rebar connection system is suitable for both static and dynamic load transmission in construction joints.


The coupler is designed as a threaded reinforcement connection for formed construction joints. Reinforcement work is normally carried out on both sides of the construction joint using lap joints or one side is anchored. The bar lengths are based on the structural analysis requirements of the building component and are calculated from anchorage and lap lengths.

Couplers Rebar Steel from Jiangsu China with High Quality

Couplers Rebar Steel from Jiangsu China with High Quality

2.Advantages of Couplers Rebar Steel from Jiangsu China in High Quality: 

Advantages of Cut and Bend Services

Rebars are cut and bent to exact specifications, ensuring precision and consistency.

Cut and bend reinforcement bars do conform to BS 8666.

Material wastage is controlled and reduced.

Lesser on-site labour is required.

Better utilisation of on-site space, logistics and reduction of inventory on-site.

In-house processes and procedures that ensure traceability down to the order level

Weather independent

The coupler system provides the opportunity to connect rebars quickly, easily and cost effectively, even when large rebar diameters are used. This makes the steel coupler rebar range a logical extension to our rebendable CNBM reinforcement continuity system for rebars over 12 mm.


3.Available sizes of Couplers Rebar Steel from Jiangsu China in High Quality:

14mm,16mm,18mm,20mm,22mmm,25mm,28mm,32mm,36mm,40mm


4.Delivery:

Delivery Term: FOB / CFR / CIF available.

Delivery Time: 15 days or less after order confirmed.


5.Why choose us?

Technical Expertise

Experienced Management

Stringent Quality Control

Exemplary Service

On-Time Delivery

Wide Product Range

Competitive Pricing

Huge branch network capable of catering worldwide


6.FAQ

Couplers Rebar Steel from Jiangsu China in High Quality

Why Us?

We are one of the Top 500 in the world, largest construction materials supplier in China. Also we are a state-owned company and respond to every customer with large and also small orders.

We own professional manufacturers with powerful producing capacity.

Extensive and comprehensive quality control system

Excellent products with competitive prices.

Efficient  services in pre and after sale.

Full energy with affluent experience team.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the main safety problems when dismantling the scaffold
5, all construction materials must be set according to the material classification management requirements must be neatly stacked, "work finished, as material, the site is clean before work".6, on-site construction waste in a timely manner to clean up and deal with the designated place.7, scaffolding workers must be trained and qualified, safety examination, hold certificate to posts jiazigong.
Q:Find the demolishing scheme of scaffold
Removal methodThe development of the demolition plan, the program should include the removal of the steps and methods, safety measures, etc.. Demolition order should be observed from top to bottom, the first after the demolition, after taking the first demolition principle. That is, first remove the railings, scaffolding, scissors support, diagonal bracing, and then small beams, large cross bars, vertical poles, etc., and according to the principle of one step clear in order to be prohibited from top to bottom at the same time the demolition work. Remove the shelf of the high-altitude personnel should wear safety helmet, safety belt, wear soft shoes on the shelf, at the same time, around the railing or set up a warning sign and a special command, in order to avoid casualties.
Q:How to set up the temporary structure of the external structure of the balcony on the two structure
Construction scheme and technical measuresAccording to the actual situation of the 1.1. design drawings and combined with the content of the project construction site, the project arrangement of small water method construction work construction, construction division order: positioning line - based project main project - - - Roof Engineering Decoration Engineering hydropower installation engineering - completion of cleaning, acceptance, delivery. Positioning of engineering survey according to the plan and the total construction plan.
Q:Are there any biological examples of scaffolding in evolution?
The classic demonstration was in the E. coli long term experiment. A strain gained the ability to metabolize citric acid after 31,500 generations. Culturing preserved strains from 15,000 and 20,000 generations showed that there was an event that occurred in between that enabled the later conversion to citrate metabolism.
Q:How much more painful is the scaffold/industrial piercing opposed to a normal cartilage piercing?
Gosh Industrial do hurt I'm not going to lie. Cartilage piercings don't hurt. But industrials are really hard to take care of. If you can handle pain then get it. They're worth it but they do hurt.
Q:Scaffolding stuck, need ideas for removing.?
Heat the female connection with a torch. The outer connection will expand from the heat. Heat the connection hot enough not to touch but not cherry red. Put a pipe wrench on male side of tubing where its is cool and tap wrench with a hammer and it will come apart. If possible lay the scaffold on its size for better leverage.
Q:Scaffold removal should comply with those requirements......
Demolition safety requirementsThe removal order should be 1 layers from the top down, at the same time no homework.2 remove the frame rods and connectors, springboard and other materials, should be used in rolling, prohibited throw down. The foot lever and remove the plate have been demolished, should be disposable.3 all the pieces of the wall should be removed from the scaffold layer by layer, it is strictly forbidden to take the whole or a few layers of the demolition of the wall and then dismantle the scaffolding; the demolition of the height difference should not be greater than two steps, such as the height difference is greater than the two step should be added to strengthen the wall.4 when the scaffolding removed to the lower part of the last long steel pipe height, according to the needs of the site in the appropriate position to take temporary support reinforcement, after the demolition of the wall.
Q:What is the mobile scaffolding materials
. 5 years of surface treatment period, and the use of the elimination period, very close to the larger share of the market share. Determine where you can find the mobile scaffolding, because mobile scaffolding is easy to find, and mobile scaffolding is not too difficult to find.
Q:Can you do the outer scaffolding?
(4) the lower part of the inclined bar at 30 cm in height from the ground and control connection pole. (5) according to the height of the structure and the length and the width of the scaffold, it should be combined with the actual situation in the construction to set up the scissors and the diagonal brace. (6) the scissors rod connected by the lap, lap length not less than 100 cm, and not less than 2 rotating fastener, rod end edge to the distance of the fastener cover more than 10 cm. 8, laying the scaffolding board (1) scaffold set level in 3 horizontal bar, and the two ends at 8 cm with a diameter of 1.2 mm galvanized wire hoop around the 2 to 3 ring fixed. When the scaffold length is less than 2 meters, the two small bar support.
Q:A painter is standing on a scaffold raising at a constant speed. He pushes a can over at 15.00 meters.?
The initial velocity is not zero since the scaffold is moving upward when the can gets pushed over. And final velocity, vf, does not represent the speed of the scaffold (if that is what you're trying to solve). y = (vo)(t) - (1/2)gt² 15 m = (vo)(3.25 s) - (1/2)(9.81 m/s²)(3.25 s)² vo = +20.5 m/s

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range