Couplers Rebar Steel from Jiangsu China with Good Price

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
30000 pc
Supply Capability:
300000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Couplers Rebar Steel from Jiangsu China in High Quality

1.Description of Couplers Rebar Steel from Jiangsu China in High Quality:

Lapped joints are not always an appropriate means of connecting rebar. The use of Steel Rebar Couplers can simplify the design and construction of reinforced concrete and reduce the amount of reinforcement required. 


The threaded steel coupler system is designed as a threaded reinforcement connection with 100% load transmission. The steel coupler rebar connection system is suitable for both static and dynamic load transmission in construction joints.


The coupler is designed as a threaded reinforcement connection for formed construction joints. Reinforcement work is normally carried out on both sides of the construction joint using lap joints or one side is anchored. The bar lengths are based on the structural analysis requirements of the building component and are calculated from anchorage and lap lengths.

Couplers Rebar Steel from Jiangsu China with Good Price

Couplers Rebar Steel from Jiangsu China with Good Price

2.Advantages of Couplers Rebar Steel from Jiangsu China in High Quality: 

Advantages of Cut and Bend Services

Rebars are cut and bent to exact specifications, ensuring precision and consistency.

Cut and bend reinforcement bars do conform to BS 8666.

Material wastage is controlled and reduced.

Lesser on-site labour is required.

Better utilisation of on-site space, logistics and reduction of inventory on-site.

In-house processes and procedures that ensure traceability down to the order level

Weather independent

The coupler system provides the opportunity to connect rebars quickly, easily and cost effectively, even when large rebar diameters are used. This makes the steel coupler rebar range a logical extension to our rebendable CNBM reinforcement continuity system for rebars over 12 mm.


3.Available sizes of Couplers Rebar Steel from Jiangsu China in High Quality:

14mm,16mm,18mm,20mm,22mmm,25mm,28mm,32mm,36mm,40mm


4.Delivery:

Delivery Term: FOB / CFR / CIF available.

Delivery Time: 15 days or less after order confirmed.


5.Why choose us?

Technical Expertise

Experienced Management

Stringent Quality Control

Exemplary Service

On-Time Delivery

Wide Product Range

Competitive Pricing

Huge branch network capable of catering worldwide


6.FAQ

Couplers Rebar Steel from Jiangsu China in High Quality

Why Us?

We are one of the Top 500 in the world, largest construction materials supplier in China. Also we are a state-owned company and respond to every customer with large and also small orders.

We own professional manufacturers with powerful producing capacity.

Extensive and comprehensive quality control system

Excellent products with competitive prices.

Efficient  services in pre and after sale.

Full energy with affluent experience team.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Erection of scaffolding accessories
When the scaffolding height of more than 20m, should be in the scaffolding outside every 4 steps to set a level of reinforcement bar, and even walls should be in a horizontal layer set pieces; set of longitudinal reinforcement bars should be continuous, and the formation of the level of closed loop; on the bottom step lower door frame scaffolding should be sealed in the mouth bar, door frame and should be located on both sides of long rod should adopt sweeping bar; fastener rack pole fastened by. Construction should pay attention to the door frame and accessories should not be mixed with the same hand rack.
Q:Specification for construction steel pipe scaffolding and construction safety rules?
Construction preparation1, materialThe steel pipe diameter is 48 or 51mm, wall thickness is 3 ~ 3 5mm or hot-rolled seamless pipe joints, used as the main column, a large bar, a small bar, inclined support.The connecting member: rotary buckle, square buckle, buckle, docking barge core.The base made of phi 40 steel tubes and 4 ~ 5mm steel, used for main column stepping. The floor area of the base should not be less than 200C.
Q:Hester Prynne on the scaffold?
Hester Prynne On The Scaffold
Q:What are the problems with having scaffolding piercing in the ear? (pic inside)?
i've not had scaffolding but i've got a wide range of cartilage piercings and they take about 12weeks to heal... i would just say be careful not to catch it and keep it clean. good luck :)
Q:What scaffold courses do i need to do to work offshore?
Sorry if I'm not serious, but go to Hong Kong as there they do scaffolding made of bamboo and 170 floors high ,2000mtrs above the sea level... Now that is serious...
Q:Electric basket accessories are generic
Electric basket full name is called electric gondola, the construction of electric basket is mainly suitable for high-rise buildings on the electric power from the electric hoist special basket, basket accessories have what those:
Q:Construction scheme of portal scaffold
1 in order to design and construct the steel pipe scaffold in the door, to carry out the relevant regulations of the state on safe production, and to realize the advanced technology, reasonable economy and safe application.
Q:people who have an industrial/scaffolding piercing?!?
I okorder.com for barbells. They have some pretty epic lightnight bolt ones and zigzags and they are like 3 bucks!!!! You can never find them in the mall like that :P lol. Anyway, i deff. think you should get the piercing. It's worth the pain. It'll be over in 2 seconds lol. Good luck :D
Q:Scaffold Piercing Aftercare?
I've had my industrial for over two years, it's a great piercing but aftercare is important and it does take awhile for it to heal. Here was my schedule for my industrial and all of my piercings since then... When I got my industrial I was in school until about 4 pm as well (I'm no longer in school now so I do it a little differently now) so this schedule might be doable for you. I took showers in the morning but that's not a huge problem. I'd wake up in the morning and while showering I'd clean my piercing with antibacterial soap AFTER I washed my hair and did my other shower rituals. Then when I got out of the shower I would do a short sea salt soaks (sea salt soaks are going to be much better for your piercing than H2O). I'd mix non-iodized sea salt in a clean new dixie cup with warm water, then I'd bend over and let my ear soak in the water for about five minutes. Sea salt soaks are great because they help promote healing and prevent/clean up infections. Then I'd go to school and after school I'd do a simple little rinse with a saline solution (which you can buy at any grocery store, usually around the contact supplies). Saline is good for when you're in a rush and don't have time to do a sea salt soak. Then at night I'd do a long sea salt soak and I'd soak my ear for about 10-15 minutes. Now for you, since you shower at night I would clean my ear with antibacterial soap every night in the shower and do a long sea salt soak after my shower, before bed. Then in the morning I'd so a short little sea salt soak before school and after school you can use a saline solution or the H2O. Good luck! This worked for me with all 6 of my piercings.
Q:The role of the external scaffolding and the relevant provisions?
There are many kinds of scaffolding, there are many types of scaffolding alone. According to the use, structure, decoration scaffolding scaffolding and protective scaffolding; according to the use of materials, there are bamboo scaffolding, scaffolding, metal scaffolding; according to the structure form, there are several independent bar type, frame type, bridge, hanging, hanging, pick style etc..

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range