Couplers Rebar Steel from Jiangsu China under High Quality

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
40000 pc
Supply Capability:
300000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Couplers Rebar Steel from Jiangsu China in High Quality

1.Description of Couplers Rebar Steel from Jiangsu China in High Quality:

Lapped joints are not always an appropriate means of connecting rebar. The use of Steel Rebar Couplers can simplify the design and construction of reinforced concrete and reduce the amount of reinforcement required. 


The threaded steel coupler system is designed as a threaded reinforcement connection with 100% load transmission. The steel coupler rebar connection system is suitable for both static and dynamic load transmission in construction joints.


The coupler is designed as a threaded reinforcement connection for formed construction joints. Reinforcement work is normally carried out on both sides of the construction joint using lap joints or one side is anchored. The bar lengths are based on the structural analysis requirements of the building component and are calculated from anchorage and lap lengths.

Couplers Rebar Steel from Jiangsu China under High Quality

Couplers Rebar Steel from Jiangsu China under High Quality

2.Advantages of Couplers Rebar Steel from Jiangsu China in High Quality: 

Advantages of Cut and Bend Services

Rebars are cut and bent to exact specifications, ensuring precision and consistency.

Cut and bend reinforcement bars do conform to BS 8666.

Material wastage is controlled and reduced.

Lesser on-site labour is required.

Better utilisation of on-site space, logistics and reduction of inventory on-site.

In-house processes and procedures that ensure traceability down to the order level

Weather independent

The coupler system provides the opportunity to connect rebars quickly, easily and cost effectively, even when large rebar diameters are used. This makes the steel coupler rebar range a logical extension to our rebendable CNBM reinforcement continuity system for rebars over 12 mm.


3.Available sizes of Couplers Rebar Steel from Jiangsu China in High Quality:

14mm,16mm,18mm,20mm,22mmm,25mm,28mm,32mm,36mm,40mm


4.Delivery:

Delivery Term: FOB / CFR / CIF available.

Delivery Time: 15 days or less after order confirmed.


5.Why choose us?

Technical Expertise

Experienced Management

Stringent Quality Control

Exemplary Service

On-Time Delivery

Wide Product Range

Competitive Pricing

Huge branch network capable of catering worldwide


6.FAQ

Couplers Rebar Steel from Jiangsu China in High Quality

Why Us?

We are one of the Top 500 in the world, largest construction materials supplier in China. Also we are a state-owned company and respond to every customer with large and also small orders.

We own professional manufacturers with powerful producing capacity.

Extensive and comprehensive quality control system

Excellent products with competitive prices.

Efficient  services in pre and after sale.

Full energy with affluent experience team.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the requirements for acceptance of external scaffolding? Want to know before
Hello, this has the following specifications: safety 1, set up a high level scaffolding, the various materials used must meet the quality requirements. 2, the foundation must be firm, before the erection of the calculation, to meet the load requirements, and according to the construction code set up, do drainage measures. 3, scaffolding erection technical requirements shall comply with the relevant provisions of the code
Q:Find the demolishing scheme of scaffold
Removal of scaffolding shall comply with the following requirements:11.2.1 removal operations must be carried out from top to bottom, prohibited from top to bottom operation at the same time;11.2.2 even wall pieces must be removed with the scaffolding layer by layer, is strictly prohibited even after the first wall or a few layers of the demolition of the dismantling of scaffolding; demolition of the height difference should not be greater than 2 steps, such as the height difference is greater than the 2 step, should be added to strengthen the wall;
Q:How to set up the temporary structure of the external structure of the balcony on the two structure
Earthwork:The pile cap is shallow, the foundation beam and sand filling quantity is less, the depth is to the outdoor floor 1.5m, so the earthwork construction adopts the mechanical leveling site construction scheme. Backfill soil must be layered compaction, density of not less than 0.9. Construction lap should be compact, interval time should not be too long, in case of rain water, the construction of various types of pipe should be synchronized with the foundation construction.
Q:What is rolling scaffolding?
Scaffolding that utilizes rollers that are attached to the bottom section of scaffolding.
Q:Fastener type steel pipe scaffold composed of components
Fastener type steel pipe scaffold, mainly by the cross bar, vertical pole, fasteners (commonly used is the rotation button, right angle button, connecting rod), foot board, etc.
Q:Why won't the WWE hire Necro Butcher and New Jack to work scaffold matches with John Cena?
World Wrestling Entertainment has never done Scaffold Matches in it's 5 Decade Histrory. If you want to see Scaffold Matches, go buy tickets to an Independent Wrestling Show. WWE has no interest in hiring Necro Butcher. He doesn't have the Look that they want. WWE doesn't have any interest in New Jack. They've known about New Jack for 2 decades and haven't made any attempts or expressed any interest in signing him.
Q:Bowl buckle type steel pipe scaffolding should set up a few people
Structural partsThe bowl buckle steel tube scaffold is composed of steel pipe pole, cross bar, bowl buckle joint and so on. The basic structure and erection requirements and fastener type steel pipe scaffolding similar, the main difference lies in the bowl buckle joint.
Q:How do you calculate the tonnage of scaffolds to use in a project?
tonnage is related to the volume of a certain material to be used in a certain project... so as to volume, tonnage is just the volume of the material to be used, given the specifiations in this case, scaffolds. consult your design and count the distribution of the scaffolds to be used.. average ratio of scaffolding tonnage is a ton per 10 square meter... also depends on the quantity of the project.
Q:Fastener type steel pipe scaffold accessories
Steel pipeScaffolding steel pipe should be used outside diameter 48mm, wall thickness of 3.5mm welded steel pipe, can also be used outside diameter 51mm, wall thickness of 3.1mm welded steel pipe. The maximum length of the steel pipe used for horizontal horizontal rod shall not be greater than 2m; the other rods shall not be more than 6.5m, and the maximum quality of each steel pipe shall not exceed 25kg, so as to be suitable for manual handling.
Q:Please help me in building professional people (scaffolding)
Door type scaffolding when used in general decoration, that thing is a direct product, a simple spell on the line, who rent who fightBowl buckle scaffold is also finished steel pipe, but there is no fastener, his fastener is a kind of fixed in the steel pipe instead of the demolition of the scaffolding is more convenient than ordinaryRent depends on the specific market

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range