COST REDUCING CUP LOCK SCAFFOLDING with Q235 Grade

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
30000 pc
Supply Capability:
300000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details:

Place of Origin:Heibei, China

Model Number: W104

Material: Q235

Surface: Painted or galvanzied

 

Packaging & Delivery

Packaging Detail: vinner case,20ft,21T/GP,by sea;or welded on the cup lock vertical then bundle on steel pallet or Customer needs.

Delivery Detail: 1 month after the contract or as customer's requirement.

Specifications

1.GREAT REPUTATION CUP LOCK SCAFFOLDING

2.Three Year Warranty


3.Operating Friendly


4.Full Safety Devices


5.Provide OEM service


6.Reasonable price


Pictures of Cup-lock Scaffolding:


COST  REDUCING  CUP LOCK SCAFFOLDING with Q235 Grade


FAQ:

What promises can be done by us?


If interested in Cup-lock Scaffolding, please feel free to write us for any QUOTE.

If printing required, please advise asap because the whole set need much more time to complete.

Please DO check goods when courier knocks your door and contact us asap if any issue. 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the requirements for the removal of scaffolding
For example, fastener type scaffolding, demolition should be met: 1, the demolition work must be from top to bottom layer, the upper and lower non simultaneous operation of 2, the wall must be removed with the scaffolding layer by layer, even the non first wall pieces of the whole layer or several layers removed after removal of the scaffolding dismantled; height should be less than 2 step, such as the height difference is greater than 2 steps should be added to the reinforcement of diaphragm wall
Q:On a scale of 1-10, how much do scaffolding piercings hurt?
A friend of mine has hers done and she said it was just like getting her upper ear cartilage pierced all over again, but it wasnt bad at all. :D
Q:What are the hidden dangers of scaffolding
3, do not approve the construction plan to guide the construction.4, the settlement of the foundation of the ground scaffolding.
Q:What is scaffolding pole, bar, scissors support?
1 divide the material according to the bar1) a single standard steel scaffolding steel pipe. It uses only one standard, such as steel tubular scaffolding, welded steel pipe using only 48 * 3.5.2, a variety of specifications of steel scaffolding, which consists of more than two kinds of different specifications of the steel pipe, such as door scaffolding3) steel based scaffolding. As to the steel pipe, and combined with other type of steel pieces composed of scaffolding, such as the channel has a base in the backwater or scaffolding, connecting steel scaffolding.
Q:I would like to ask what is the erection of external wall scaffolding specification?
Must we hand frame erection specification wall outside the word feel strange, don't know what it is about the meaning of it? Now look at the next
Q:A 85 kg scaffold is 6.4 m long. It is hanging with two wires, one from each end. A 440 kg box sits 1.4 m from?
scaffold mg = 85 x 9.8 = 833 N box mg = 440 x 9.8 = 4312 N left hand wire = ((833/2) x 6.4) + (4312 x (6.4 - 1.4)) = 24225.6 24225.6 = 6.4 x left hand tension 24225.6/6.4 = 3785.25 N (answer)
Q:describe Vygotsky’s contribution to our understanding of cognitive development? What is scaffolding?
Cognitive development is the growth of a child when they have sexual urges
Q:What kind of scaffolding used in engineering construction
Scaffolding is a special type of work closely related to production safety. In the design and construction of steel tubular scaffolding in the implementation of national safety production policies, to ensure the safety of construction workers, do apply advanced technology, reasonable economy, safety, it must comply with the "construction of steel tubular scaffold safety technical specifications" (JGJ 130 - 2011) requirements, the new standard by the Ministry of construction in People's Republic of China Announcement No. 902, and in 2011 - 01 - 28 - 12 - 2011 approved 01 implementation.
Q:How long does it take to put up scaffolding?
all depends how many guys are putting up the scaffold but I would say more than two hours
Q:can I claim compensation for falling of scaffolding and breaking my arm?
If you can prove that the company was responsible i.e. the scaffolding was not safe, then yes. If it is proved that you ignored instructions, signage preventing your access or training, then no. The company cannot be held responsible for your stupidity, if for example, you decided to climb over a guardrail rather than leave the scaffold at the proper access points. In this case, you would get nowhere with a claim. If the scaffold was missing guardrails where it should have them, then quite rightly the company in charge of the site on which the scaffold is erected is responsible.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range