Cost-Efficient Construction Steel Quick Scaffolding Replace Cuplock Scaffolding

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 kg
Supply Capability:
100000 kg/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Cost-Efficient Construction Steel Quick Scaffolding Replace Cuplock Scaffolding


Packaging & Delivery

Packaging Detail:

steel bracket / suitable for shipment

Delivery Detail:

15-20 days after payment


Specifications

1 scaffolding replace cuplock 
2 to support slab formwork 
3 to build concrete slab floor 
4 prop joint no lamp/fastener

used scaffolding for sale/ latest concrete formwork for building

 

Cost-Efficient Construction Steel Quick Scaffolding Replace Cuplock Scaffolding

Cost-Efficient Construction Steel Quick Scaffolding Replace Cuplock Scaffolding

Cost-Efficient Construction Steel Quick Scaffolding Replace Cuplock Scaffolding


XMWY main products: 

construction steel scaffolding system/  steel scaffold parts and couplers/  formwork system/  scaffold frame/  scaffold props /  shuttering materials/ base jack/  plywood supporting/  post shore/  shoring props/  steel pipe/ galvanized scaffold plank/  formwork accessories/ H frames/ quicklock and ringlock scaffolding system


Cuplock Scaffolding

Cuplock scaffolding is one of the world’s widely used systems.

It’s unique circular node allows up to 4 components to be assembly in quick action.

 

Steel Tube:  Diameter:48mm  Thickness:2.75mm/3.0mm/3.2mm

Steel Grade: Q235,Q345

Surface:     Hot Dip Gal., Electro Gal., Painting

Component:  Standard, Ledger, Brace, Metal Plank, Ladder, Base jack, Up/bottom cup, Blade

 

 Detailed information:

Assembly Name

Length(mm)

Standard

500, 1000, 1300, 1500, 1800,2000, 2300,2500,3000

Ledger

600, 900, 1000, 1200, 1300, 1600, 1800, 2500

Brace

1300x2000, 1800x2000, 2500x2000

Transom

565, 795, 1200, 1300, 1800, 2500


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:why is dimmesdale on the scaffold in chapter 12 of the scarlet letter?
dawww when I saw dimmesdale' I thought you were going to talk about Fairly Odd Parents. If you want to know, try reading the book or watching the movie. According to the movie easy A, you have to watch the old movie not the new, better one.
Q:He'd talk to all the people from his scaffold ~~~the laws were obsolete, a change they should demand~~~?
what?
Q:The combination form of bowl buckle type common scaffold?
High 30m below the scaffold verticality deviation should be controlled within 1/200, high 30m above the scaffolding should be controlled in 1/400~1/600, the total height deviation should not be greater than 100mm.
Q:Cost of rent per day per month per ton of scaffolding
Different leasing companies, fees are different
Q:Whom does Hester recognize in the crowd as she stands on the scaffold?
her husband, he has been in England while she was in America for a year or 2 can't remember; I think she thought he was dead or not coming cannot remember. It frightens her because she has a kid that cannot be his.
Q:More than 3 floors of the building can be erected with bamboo scaffolding
3, the structure of the scaffold, the components of the initial defects, such as the initial bending of the rod, corrosion, erection size error, eccentric load, etc.;4, and the wall of the connection point, the binding of the scaffold variation. The study of the above issues and lack of systematic accumulation of statistical data, does not have the independent probability analysis of the conditions and structure of the resistance is less than 1 of the adjusted coefficient multiplied by the value determined by calibrating system and safety coefficient used in the past. Therefore, the design method used in this specification is essentially a semi probabilistic, semi empirical. Scaffolding to meet the requirements of this specification is the basic requirements of the design calculation.
Q:I would like to ask what is the erection of external wall scaffolding specification?
N need to pay attention to several points: 1, scaffolding load shall not be more than 270kg/m2, after the acceptance of the listing can be used before the use of the regular inspection and maintenance. More than 270kg/m2 load, or the form of special scaffolding should be designed. rn2, steel pipe column should be set metal base, on the basis of the soft foundation of the board should be filled with wood or stick. rn3, scaffolding vertical pole should be vertical, vertical deviation shall not exceed the height of 1/200, vertical pole spacing of not more than 2 meters
Q:Can the horizontal bar of the bowl buckle scaffold be oblique to the horizontal position of the vertical bar
The utility model can not form a parallelogram, and the joint of the bowl buckle and the horizontal rod is fixed by the joint.
Q:What are the requirements for the broken seam connection of bowl buckle scaffold. For example, both sides of the seam on the vertical pole is very neat, with steel pipe
According to your description, I guess you use a different length of the vertical pole, or the use of ordinary steel pipe mixing bowl buckle scaffold. If the use of uniform specifications of the bowl buckle steel pipe should not be your problem.
Q:Full house scaffolding height of more than the number of meters experts need to do?
The height of the erection of the frame is more than 24m, and only need to be designed and calculated according to the regulations.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range