Cooler Tube/ Cooler Pipe./ Tubo de Enfirador

Ref Price:
Loading Port:
Nanjing
Payment Terms:
TT OR LC
Min Order Qty:
10 set
Supply Capability:
100 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Cooling pipe application

Suitable for machine tools, hydraulic machinery, CNC machine tool for oil, water cooling system.

Cooling pipe by manual assembly, adjust the use length can be arbitrary, and the size of the nozzle diameter, round flat swaps, direction freely convertible, with color and beautiful shape, large amount of oil, non-conductive, corrosion resistance, high temperature resistant characteristics.

Types of Cooling Pipe:

1.According to the material can be divided into two kinds of metal and plastic.
2.According to the model can be divided into three quarters, 1/2, 1/4, 3/8, 1/8, 6 points, 4 points, three points, 2 points, 1 points.
3.Plastic cooling pipe

4.Metal cooling tube
5.Have a round nose, flat nose, with switch, there are female and male thread.Note: JLP on behalf of the ordinary;JLC on behalf of the special type;JLK representative zone switch type;JLD on behalf of the flat nose type



TYPE

Diagobal

mm

outer diameter

φmm

Flow Inner diameter

φmm

Tread inner diameter

press asistance

kg

Length

(mm)


JL10P

JL12P

18

10

12

3

1/4"

2

150.200.250.300.350.400


JL15P

JL16P

22

141516

4

5

3/8"

1/4"

3

200.300.350.400.450.

500.550.650.700


JL20P

JL22P

28

16

20

22

6

8

1.2"

3/8"

4

300.350.400.450.500.

550.600.650.700.800.


JL15K

JL16K

22

141516

4

5

1/4"

3/8"

3

200.300.350.400.450.

500.550.600.


JL20K

JL22K

28

16

20

22

6

8

3/8"

1/2"

1/4"

4

300.350.400.450.500.

550.600.650.700.800.


Model

MM

φMM

dmm

内径

kg

2m


JL15B

JL16B

22

14

15

16

4

5

1/4"

3/8"

3

300.350.300.420.450.500

16

30

JL20K

JL22B

28

16

20

22

6

8

3/8"

1/2"

1/4"

4

300.350.380.400.450

460.500

40

45

JL24C

30

24

10



300.340.380.420.


FAQ

We have organized several common questions for our clients,may help you sincerely:

①How about your company?

A world class manufacturer & supplier of castings forging in carbon steel and alloy steel,is one of the large-scale professional investment casting production bases in China,consisting of both casting foundry forging and machining factory. Annually more than 8000 tons Precision casting and forging parts are exported to markets in Europe,America and Japan. OEM casting and forging service available according to customer’s requirements.

②How to guarantee the quality of the products?

We have established the international advanced quality management system,every link from raw material to final product we have strict quality test;We resolutely put an end to unqualified products flowing into the market. At the same time, we will provide necessary follow-up service assurance.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Resistors problem plz help ?
english.cxem.net/infrared/ir3-5.g Anita
Q:I want to know about electricals on scooters Specifically for high wattage lights.?
When it comes to adding electrical stuff on a bike(or anything)you need to know how much amperage the total equipment will draw.You need to find the output of your alternator and how many amps your electrical system draws now.Then how much whatever lights you want to add draw.If you exceed the output your system will not be able to keep up and your battery will discharge instead of charge.That's the best i can do for an answer as i have no idea what that is your riding.Chances are your electrical system couldn't handle the amperage draw of too much extra lighting.Try looking in your owners manual or a repair manual for the amperage output of your scooter and go from there.Or contact the technical department of that company and ask them if you can add extra lights.They will know.
Q:Is your MOS 52c? How is it?
Army equipment is often electrically powered. It's up to the Utilities Equipment Repairer-an essential member of the Army electrical maintenance team-to make sure all the electrical equipment remains in excellent working order. Utilities Equipment Repairers maintain and repair electrical equipment such as electric motors and electric tools. The Utilities Equipment Repairer is responsible for supervising and performing maintenance on utilities equipment and special purpose support systems. Some of your duties as a Utilities Equipment Repairer may include: Maintaining, testing, and repairing electric motors in many kinds of machines, such as lathes and pumps Inspecting and repairing electrical equipment Inspecting and repairing electric instruments, such as voltmeters Replacing worn gaskets and sealing in watertight electrical equipment Maintaining and repairing gasoline engine systems, air conditioner electrical systems and portable heater fuel/electrical systems SSG Schramm US Army 15 years OIF 2003
Q:Convert an electric attic light to an electrical outlet?
Go to Lowes, Home Depot, or any local Ace Hardware and tell them what you have written here. They are still available. Oh yeah, it's called a socket adapter.
Q:What is the day like for an electrical engineer?
There is no typical day for most engineers and that is a good thing. Yes, some engineers settle for repetitive engineering jobs but you don't have to. There are always jobs with variety and interesting stuff to do.
Q:Is mounting Pad-mounted equipment overhead illegal?
I don't believe that there is anything in the NEC that addresses this. Obviously, installing anything on a structure presents challenges that require the attention of a qualified structural engineer. And depending on the location, you could be facing some additional concerns. You would need to check on seismic activity in the area, and since 'pad mount' equipment has a broad profile, wind-loading could be more challenging if you have a wind-force specification to meet. The other issue you would need to consider is whether installation on a structure presents any particular safety concerns. Without knowing any more, my inclination would be to think that you might want to provide an enclosure around the structure to prevent civilians (rmeaning 'teenagers and drunk college students) from climbing it. Just out of curiosity - why does your client want this? We know that the client is always right - even when he insists to stupid things. I trust there is a good reason for asking for something that is bound to increase installation cost by probably 100%.
Q:How long would it take for the world to recover from a series of EMP nuclear attacks?
About 15 or 20 minutes maybe?
Q:How exactly would a huge solar flare destroy the electrical grid?
It's a worry, especially by the insurance companies which have been raking in premiums for years and never had to pay out. Gosh, paying out might affect their profits. As the 2012-3 solar max will likely be lower than AVERAGE, the chances of a CME during it are low. We COULD get a CME today, as they are NOT tied to solar Maximums like a lot of people think. Its just unlikely. Fear sells, so expect your insurance companies to raise your rates, even though they won't pay out anything. Oh, and they won't LOWER your rates in 2013, either. Have you figured out who is in charge, yet?
Q:What does an electrical instrumentation technician do?
You don't have the necessary qualifications for either immigration or temporary employment visa to Canada (or the US, for that matter). Instrumentation techs lack sufficient education and skill levels. You would need at least at bachelors, preferably masters, degree in Instrumentation Engineering to start with.
Q:How is the electrical maximum demand?
Sorry Sparky its not that type of maximum demand. Max demand on a UK electricity bill is determined as follows UK industrial tariffs are generally measured on a 1/2 hour basis that is the 24 hour day is split into 48 1/2 hour segments during the annual period of increased demand September to March the electricity company records your usage for each 1/2 hour segment in KWH the highest KWH in any 1/2 period between september and March is your maximum demand charge This will be a time when most or all of your electrical equipment is on together drawing the maximum power consumption. If you have an old analogue type meter it has a max demand needle that displays the up to date maximum demand figure if in the next 1/2 hour period you exceed this value the needle will be pushed up to this higher value and will not reset. The next high demand period if greater than previous will again push the needle up to a new maximum value. At the end of march or end of max demand period the highest 1/2 hour figure will be used in your bill.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range