Construction Walk System Andaime Multidirecional with En12810 Standard CNBM

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
50 m.t.
Supply Capability:
30000 m.t./month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

  • Quick Details of   Construction Walk System Andaime Multidirecional with En12810 Standard  

  • Type:High Building

  • Material:Steel

  • Lapping Form:Full Scaffolding

  • Framework:Combined Scaffolding

  • Supporting Mode:Wall Hanging Scaffolding

  • Erection Position:External Scaffolding

  • Scaffolding Part Type:Scaffolding Platform

  • Move Method:Horizontal mobile Scaffolding

  • Structural Style:Tower Scaffolding

  • Surface Treatment:Hot DIP Galvanized, Galvanized, DIP Painted

  • Certificate:En12810, SGS Test Report for Loading Capacity

  • Color:Silver, Dark Red, Orange

  • Production Capability:100 Tons Per Week

  • Delivery Time:About 20-30 Days After Confirmation

  • Export Markets:Global


  • Construction Walk System Andaime Multidirecional with En12810 Standard CNBM

  • Construction Walk System Andaime Multidirecional with En12810 Standard CNBM


  • Construction Walk System Andaime Multidirecional with En12810 Standard CNBM



  • Descriptions of  Construction Walk System Andaime Multidirecional with En12810 Standard 

  • 1. Standard:
        3000mm, 2500mm, 2000mm, 1500mm, 1000mm, 500mm.
    2. Ledger:
        3000mm, 2000mm, 1780mm, 1500mm, 1000mm, 500mm.
    3. Diagonal brace:
        3000x2000mm, 1780x2000mm, 1000x1500mm, 1000x2000mm, 1500x2000mm.
    4. Tube specification:
        Φ 48.3x4.0mm, φ 48.0 x3.25mm, φ 48.0 x3.0mm.
    5. Surface Finish:
        Hot DIP Galv. Electric Galv.Powder coating, Dip Painting.
    6. Material:
        Q235, Q345
    7. Certificate: 
        EN12810,SGS test report for loading capacity.

The Parts of  Construction Walk System Andaime Multidirecional with En12810 Standard 

DESCRIPTIONMATERIALQTY.   (PCS)W. T.     (KG/PC)SURFACE
3.00m  standardQ345  48.3*3.2mm1.00 15.3Hot-dipped  Galvanized
2.50m  standardQ345  48.3*3.2mm1.00 12.9Hot-dipped  Galvanized
2.00m  standardQ345  48.3*3.2mm1.00 10.5Hot-dipped  Galvanized
1.50m  standardQ345  48.3*3.2mm1.00 8.1Hot-dipped  Galvanized
1.00m  standardQ345  48.3*3.2mm1.00 5.7Hot-dipped  Galvanized
0.50m  standardQ345  48.3*3.2mm1.00 3.3Hot-dipped  Galvanized
2.00m  ledgerQ345  48.3*2.5mm1.00 6.8Hot-dipped  Galvanized
1.80m  ledgerQ345  48.3*2.5mm1.00 6.2Hot-dipped  Galvanized
1.50m  ledgerQ345  48.3*2.5mm1.00 5.3Hot-dipped  Galvanized
1.20m  ledgerQ345  48.3*2.5mm1.00 4.4Hot-dipped  Galvanized
0.90m  ledgerQ345  48.3*2.5mm1.00 3.5Hot-dipped  Galvanized
0.60m  ledgerQ345  48.3*2.5mm1.00 2.6Hot-dipped  Galvanized
2.00*2.00m  braceQ235  33.5*2.3mm1.00 7Hot-dipped  Galvanized
1.80*2.00m  braceQ235  33.5*2.3mm1.00 6.7Hot-dipped  Galvanized
1.50*2.00m  braceQ235  33.5*2.3mm1.00 6.4Hot-dipped  Galvanized
1.20*2.00m  braceQ235  33.5*2.3mm1.00 6.1Hot-dipped  Galvanized
2.00*1.50m  braceQ235  33.5*2.3mm1.00 6.3Hot-dipped  Galvanized
1.80*1.50m  braceQ235  33.5*2.3mm1.00 6Hot-dipped  Galvanized
1.50*1.50m  braceQ235  33.5*2.3mm1.00 5.6Hot-dipped  Galvanized
1.20*1.50m  braceQ235  33.5*2.3mm1.00 5.2Hot-dipped  Galvanized
0.90*1.50m  braceQ235  33.5*2.3mm1.00 4.9Hot-dipped  Galvanized
0.60*1.50m  braceQ235  33.5*2.3mm1.00 4.7Hot-dipped  Galvanized
2.00*1.00m  braceQ235  33.5*2.3mm1.00 5.8Hot-dipped  Galvanized
1.80*1.00m  braceQ235  33.5*2.3mm1.00 5.4Hot-dipped  Galvanized
1.50*1.00m  braceQ235  33.5*2.3mm1.00 4.9Hot-dipped  Galvanized
1.20*1.00m  braceQ235  33.5*2.3mm1.00 4.5Hot-dipped  Galvanized
0.90*1.00m  braceQ235  33.5*2.3mm1.00 4.1Hot-dipped  Galvanized
0.60*1.00m  braceQ235  33.5*2.3mm1.00 3.8Hot-dipped  Galvanized
2.00*2.00m  braceQ345  48.3*2.5mm1.00 10.2Hot-dipped  Galvanized
1.80*2.00m  braceQ345  48.3*2.5mm1.00 9.8Hot-dipped  Galvanized
1.50*2.00m  braceQ345  48.3*2.5mm1.00 9.2Hot-dipped  Galvanized
1.20*2.00m  braceQ345  48.3*2.5mm1.00 8.8Hot-dipped  Galvanized
2.00*1.50m  braceQ345  48.3*2.5mm1.00 9.1Hot-dipped  Galvanized
1.80*1.50m  braceQ345  48.3*2.5mm1.00 8.7Hot-dipped  Galvanized
1.50*1.50m  braceQ345  48.3*2.5mm1.00 8Hot-dipped  Galvanized
1.20*1.50m  braceQ345  48.3*2.5mm1.00 7.4Hot-dipped  Galvanized
0.90*1.50m  braceQ345  48.3*2.5mm1.00 7Hot-dipped  Galvanized
0.60*1.50m  braceQ345  48.3*2.5mm1.00 6.6Hot-dipped  Galvanized
2.00*1.00m  braceQ345  48.3*2.5mm1.00 8.3Hot-dipped  Galvanized
1.80*1.00m  braceQ345  48.3*2.5mm1.00 7.7Hot-dipped  Galvanized
1.50*1.00m  braceQ345  48.3*2.5mm1.00 7Hot-dipped  Galvanized
1.20*1.00m  braceQ345  48.3*2.5mm1.00 6.2Hot-dipped  Galvanized
0.9*1m  braceQ345  48.3*2.5mm1.00 5.6Hot-dipped  Galvanized
0.6*1m  braceQ345  48.3*2.5mm1.00 5.2Hot-dipped  Galvanized
0.88m  board  bracketQ345  48.3*2.5mm1.00 9.5Hot-dipped  Galvanized
0.60m  base  collar  downQ235  38.1*4.5mm1.00 4.4Hot-dipped  Galvanized
0.60m  base  collar  upQ235  38.1*4.5mm1.00 5.2Hot-dipped  Galvanized
0.24*2.00m  PlankDX51D-Z801.00 8.2Hot-dipped  Galvanized
0.24*1.80m  PlankDX51D-Z801.00 7.5Hot-dipped  Galvanized
0.24*1.50m  PlankDX51D-Z801.00 6.5Hot-dipped  Galvanized
0.24*1.20m  PlankDX51D-Z801.00 5.5Hot-dipped  Galvanized
0.24*0.90m  PlankDX51D-Z801.00 4.5Hot-dipped  Galvanized
0.50*2.00m  PlankDX51D-Z801.00 15.3Hot-dipped  Galvanized
0.50*1.80m  PlankDX51D-Z801.00 14Hot-dipped  Galvanized
0.50*1.50m  PlankDX51D-Z801.00 11.9Hot-dipped  Galvanized
0.50*1.20m  PlankDX51D-Z801.00 9.9Hot-dipped  Galvanized
0.50*0.90m  PlankDX51D-Z801.00 7.9Hot-dipped  Galvanized
  • FAQ

  • 1. What is considerations of Scaffolding installation?

  • There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

  • (1) scaffold frontage hurtful to prevent falling objects protection is required.

  • (2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

  • 2.What are the certifications of your products?

  • Certified by SGS, BS1139, EN74, Local Test Report.

  • 3. How long is the warranty period for your product?

  • Our products warranty is 2 years.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How long do you have to wait in between getting two piercings? cartilage and industrial (scaffold)?
You can have both done in the same day if you can handle the pain and shock. Get the industrial done first, and if you still feel OK afterwords, you can get your other ear done by the same piercer. Talk to him/her and let them know what you want to do before you start. If you feel like you need to wait after the industrial, wait at least a day before getting the second piercing. It's all about what you can handle.
Q:Whats a scaffold in ac brotherhood?
Wrong category. Post under Video and Online Games.
Q:Can I get an industrial/scaffold piercing pierced with 2 separate bars?
Yep, some piercers prefer to do it that way. Just make sure you let them know that that's what you want when you go into the shop and they can accommodate you. No cartilage piercing is healed enough to remove in 6 weeks. Cartilage piercings can take anywhere from 6-12 MONTHS to fully heal.
Q:What are the requirements for the construction of the scaffold eye in the building?
Calculation basisScaffolding input: for the template support part of the steel pipe material in accordance with the 1.5 layer of the amount of consideration: the amount of external scaffolding steel pipe in accordance with the full closed scaffolding consideration; safety net in accordance with the external scaffolding full consideration.
Q:I need to set up scaffolding on a tiled floor to reach some lights 28 ft high?
unless you are majorly manhandling the scaffolding, such as slamming it around and jerking it into place, etc, you won't crack the tiles (this is being said with the hopes that the flooring was installed correctly.) i would throw a layer or two of bedsheets or a good heavy drop cloth over the tiled floor just to protect the tile from being chipped or scratched. be careful going up so high. good luck!
Q:Do you have to have a certain ear shape for Industrial/Scaffold Piercings?
Only a professional piercer can decide if your ear can handle and industrial piercing. Consultations are free and I highly recommend booking one before you get the piercing. Mine was $70, but my regular piercer does them for $50. It just depends on what shop you go to.
Q:What is the mobile scaffolding materials
About looking for specific mobile scaffolding, I suggest you here to see the mobile scaffolding, mobile scaffolding here all, other parts of the mobile scaffolding, mobile scaffolding may not fully determine where is here, you can find the mobile scaffolding, mobile scaffolding because it is easy to find, but now is not the mobile scaffolding too hard to find. About looking for specific mobile scaffolding, I suggest you here to see the mobile scaffolding, mobile scaffolding here all, other parts of the mobile scaffolding, mobile scaffolding may not fully here,
Q:Construction scheme of portal scaffold
1 in order to design and construct the steel pipe scaffold in the door, to carry out the relevant regulations of the state on safe production, and to realize the advanced technology, reasonable economy and safe application.
Q:What is a bar in the scaffold
Scaffolding is 1.5 meters of the cross bar is called the cross bar; long to such as the steel pipe is generally called the 6 horizontal pull rod
Q:In Virtual Villagers 3, my builders won't build the scaffolding for the statue! Help!?
Hey, This is a good link for downloading Virtual Villagers 3 The Secret City for free: j.mp/1pnRgNo it's completely free and it's very fast to install It is an entertaining game series that consist in exploring new corners of Isola Island, building structures and unraveling mysteries that you will find during the adventure.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range