Construction Suspended Platform Parts Safety Rope / Steel Wire Rope

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
1000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Customized Suspended Platform Parts Safety Rope, Steel Wire Rope, Cable For Construction

Description:

1. Specifications:

Steel Wire Rope:

DiameterФ8.3mmФ8.6mm Ф9.2mm

Suspended

Platform

ZLP500&ZLP630ZLP800&ZLP1000

Safety Rope:

DiameterФ18mm Ф20mm
Breaking Force47250N
Length100m or customized as your requirements

Cable:

Length100m/piece
Specification3*2.5+2*1.5

We can customized the length of steel wire, safety rope and cable based on your requires.

2. Packing:

Construction Suspended Platform Parts Safety Rope / Steel Wire Rope

Construction Suspended Platform Parts Safety Rope / Steel Wire Rope

Construction Suspended Platform Parts Safety Rope / Steel Wire Rope

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How many kilograms weight can the basket hold?
ZLP500 basket: 1) platform length: 5 meters (2.5 meters) 2.5 meters) 2 load: 500 kg 3 Motor Power: 1.5 kW)
Q:Construction basket use, need to the quality supervision department for the record?
Supervision units responsible for the safe use of basket responsibility oversight. Responsible for checking the relevant technical data of the products and the basket basket installation and disassembly operations personnel documents, installation and disassembly plan approval basket, installation, disassembly and use of supervision and inspection of the basket, the discovery of the existence of production safety accidents, shall require the general contractor of the construction and use of sub units for rectification, refuses to rectification the report to the competent department of construction units and construction in a timely manner.
Q:High altitude hanging basket in construction, sudden power failure, emergency measures
Hot dip galvanized electric basket in the lifting process, if the suspension platform tilt angle will cause the safety lock, automatic lock rope, you should promptly turn the switch point, hoist moving one side of the platform, the platform is close to the level of the state, the safety lock open after normal operation recovery. When the work rope is suddenly stuck on the hoist, it must stop immediately. It is strictly prohibited to use repeated ascending and descending operations to forcibly eliminate danger. The operating personnel from the suspension platform under the premise of ensuring safety, and inform professional maintenance personnel to enter the suspension platform for risk.
Q:How long is the ceiling overhang for high-rise buildings?
In addition, even if the calculation of anti overturning moment can meet the standard requirements of the extended forearm, also need to consider the extension cantilever stiffness is enough, generally more than 2 meters above the length of them requires the use of two reinforcing steel wire rope improve stiffness.
Q:What are the structural components of an electric gondola?
The force exerted on the building or structure by the suspension mechanism shall be in accordance with the carrying requirements of the building structure. Figure two, 2, 1 before the beam front bracket 3, inserted rod 4, 5, 6, beam beam connection sleeve 7, 8, 9, the support weight on pillar 10, strengthened steel wire rope 11, rigging screw. The suspension mechanism comprises a front beam, the middle beam and the back beam, a front bracket, on balance, strengthen the pillar, steel wire rope, plug rod, connecting sleeve and other components, before and after inserted in the beam, flexible regulation. In order to meet the requirements of work environment, by adjusting the inserting rod height to height adjusting beam before and after adjusting the height of 1.15 ~ 1.75m, front and rear bracket with roller, can be used to move the suspension mechanism, the weight of the quantity according to the corresponding model configuration.
Q:Construction plan for mounting basket on steel pipe support frame
(3) the front and rear beams are respectively arranged before and after stent insertion within the casing, with the beam to the front and rear beams set, and according to the situation before the selected overhanging beam, the distance between the front and rear supports should be put to the maximum, will be placed on the front seat pillar rod sleeve. The small connecting sleeve is arranged on the inserting rod sleeve of the back support, and is fixed by bolts, and the bracket is assembled and completed.
Q:How to grasp the proper use of basket
The first point is must pay attention to grasp the good plan targeted and feasibility, can not speak generally, should be based on the specific construction scheme, the use of a good grasp of the building to building basket, the basket cover the entire face, do not stay dead, so as to guarantee the safety of.
Q:What are the requirements for the installation of overhead basket?
Safety requirements for overhead operation basket 1, unified safety requirements for overhead operation basket, relevant standards: GB19155-2003 "hanging basket for height work". 2. The basic structure of overhead hanging basket is divided into three parts: suspension platform, wire rope and suspension mechanism. The front end of the suspension mechanism is provided with a rear counterweight to overcome the overturning moment at the front end. The steel rope is hung on the hanging mechanism, and the steel rope is divided into a work rope and a safety rope. Hoist for electric and manual, general electric climbing type, wire rope hoist is wound in a circle, hoist and hoist platform connected with the steel wire rope climbing platform. Safety at work rope break when the suspension platform lock on the safety rope.
Q:Counterweight requirement of basket
1) the hanging mechanism of the hanging basket or the roof trolley must be equipped with proper counterweight; (2) the counterweight shall be accurately and firmly installed on the focal point, and the counterweight shall be configured according to the drawing specifications
Q:Construction basket operation certificate is not able to operate?
1, basket must be made special equipment manufacturing license, manufacturers of qualified products. 2, basket factory must have the following technical documents: product certification; II. Installation, use and maintenance instructions; installation plans, wearing parts, electrical schematics and wiring diagram, hydraulic system diagram.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range