construction machine Haihong CTX950 wheel loader, cheap wheel loader

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
100 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Description of CTX950:

   Haihong wheel loader combines strong power with advanced intelligent design together to make the products superior in this area. It can be called"both intelligent and courageous" . The closed type load sensing hydraulic system can provide you with accurate power you need. So even work on steep slope, the wheels can still obtain powerful motive force to ensure strong loading capacity. The full usage of HP reduces fuel consumption and decrease the times of wear and maintenance. We believe that "possessing Haihong loaders, work excellently".

    Our wheel loaders have the following features:

    Good economy: belt drive, automatically adjust the output torque according to load change, high efficiency and convenient repair.

    High production efficiency: the optimization design of working devices makes strong lift force and high automatic flat function.

    Flexibility: articulated frame structure, double steering oil cylinder, small turning radius, convenient operation in narrow space.

    High pass through ability: rear axle can swing around the lifting frame to improve the pass ability.

    Comfortable driving: hydraulic load sensing steering system is stable and reliable.

construction machine Haihong CTX950 wheel loader, cheap wheel loader

construction machine Haihong CTX950 wheel loader, cheap wheel loader

construction machine Haihong CTX950 wheel loader, cheap wheel loader

construction machine Haihong CTX950 wheel loader, cheap wheel loader

construction machine Haihong CTX950 wheel loader, cheap wheel loader

construction machine Haihong CTX950 wheel loader, cheap wheel loader

construction machine Haihong CTX950 wheel loader, cheap wheel loader


Technical Specifications of CTX950:

construction machine Haihong CTX950 wheel loader, cheap wheel loader


FAQ:

1.How about the shipment?

You can put 3 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days. 


2. What about your service?

Our quality ensurance time is 3 months. And our engineers can supply overseas service. 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Does the AMD970A motherboard support the AMD bulldozer eight core CPU? Is the CPu interface supported by AM3+?
Comrade Mars on the first floor, right? The spaceship hasn't been put in place yet The 970A motherboard is the AM3 interface, your own DIY?970 chipset is equipped with FX bulldozer, the interface is all AM3+. Landlord, you remember, the motherboard socket is black, you can, and AM3 are white. For example, now Gigabyte's non 970A motherboard, including the nVidia520 chipset, AMD's 770870880G, and all rev3.1 versions are socket black, that is, AM3+, these boards can also support FX bulldozers.If you buy a line (MSI, gigabyte, ASUS) and second-line (Hua Qing) 970A motherboard, it definitely supports 8 nuclear bulldozers, design and strength there, are supporting 125W +. For example, Gigabyte 870A-USB3L, do not see is sold only 550 of the narrow board, 5 phase power supply, but the power supply part is strengthened, and 140W is no problem. I use the Yilong II X4 955 (3.2G) to 4.1G, run the "Crysis 2" estimate of the peak power of 140W, but OK.However, the 5 phase power supply on the 140W processor, inductors are very hot, I put a heat sink. I also have Gigabyte 770T-UD3P, 10 phase power supply, that is, the temperature. After all, the number of inductors and field transistors doubled and diverted. 12 If you want to change the bulldozer or nuclear Yilong II overclocking (now popular play is to buy package of 6 core Athlon II X4 640 II X6 1450T, a Yilong), it is recommended to buy the 10 phase power supply (also called the 8+2 phase).
Q:How many types of bulldozers are most suitable for farmland transformation?
Is the main general type bulldozers, bulldozers and wetlands are suitable for the development of West China reached the prototype of bulldozer.
Q:Forklift truck, bulldozer, excavator, what's the difference?
Hello, this is known as the loader, bulldozer (forklift), is tracked, the front is a 30 degree arc plate. The front of the excavator has a long arm that can be stretched
Q:Why is AMD's CPU called a bulldozer, a pile driver?
The AMD bulldozer, the pile driver, as the name suggests, is the new generation of architecture that toppled the old version of U for the new architecture of CPU piling. The architecture is different. But now performance is not good, and for a long time, user evaluation is the truth.
Q:Anyone know about the TY165-3 bulldozer? What's the difference between it and TYS165-3?
Xuangong is TYS165-3 and TY165-3 is the standard of swamp bulldozer bulldozer.
Q:Excavators, bulldozers, loaders, roller distance does not exceed 5 kilometers, want to know how to calculate the cost,
Worker pay + machine wear + fuel consumption + all kinds of wearing parts wear + freight + default =
Q:What's the size of a bulldozer? How small is this thing?
The length, width and height of the model are multiplied by 48, which is the actual size of the real car.
Q:AMD phenom or bulldozer?
The performance of AMD bulldozer in the system and the game does not show, AMD955 can also finish second FX4100, you can select the 960T current price is also very good Taobao 690 bag Kaimo electric ultra stable 3.6G if LZ love open nuclear U
Q:Can the GPU of AMD bulldozer fight with independent video cards?
Upstairs are nonsense, first bulldozer is not APU, now the bulldozer is not integrated GPU, A4, A6, A8, APU and GPU integration, integrated graphics and only 6670 can fire
Q:What is the difference between bulldozer and bulldozer?
Use the grader and bulldozer, grader is mainly used for road or site formation, and then use the roller or other subsequent operations, can also be used for earthwork operations, but by the traction force and blade capacity constraints, the effect is far better than the bulldozer bulldozer;

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range