• construction machine Haihong CTX912 wheel loader, cheap wheel loader System 1
  • construction machine Haihong CTX912 wheel loader, cheap wheel loader System 2
  • construction machine Haihong CTX912 wheel loader, cheap wheel loader System 3
  • construction machine Haihong CTX912 wheel loader, cheap wheel loader System 4
construction machine Haihong CTX912 wheel loader, cheap wheel loader

construction machine Haihong CTX912 wheel loader, cheap wheel loader

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
100 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Description of CTX912:

• Low fuel-consuming, high-quality turbo charged engine has good power performance and big torque   reserve.

•Double rocker with better visual field. Short wheel base chassis improves steering flexibility and operation efficiency.

• Steering system provides flexible steering operation.

•Unique energysaving patent technology, including double pumps and double circuits, turning priority and unloading hydraulic pressure system, is efficient and energy-saving with better power performance and lower fuel consumption.

•Turbo hydraulic torqueconverter together with dynamic planettype gear box enables a wide and high efficient range and facilitates the gear shifting.

• Bigger driving axle, 4-wheel drive ensures excellent towing performance.

• Four-wheel, dual-line and pliers disc braking system ensures safer and more reliable operation.

•The soundproofing, heatproofing and shockabsorbing driver’s cab has a spacious operating space, a broad view and comfortable adjustable seats, specialized cool & hot air-condition can also be equipped.

• Z-form connecting rod has strong breakout force and high raising ability, and enables high operating efficiency.

•Low alloy material and alloying blade and corner tines are used for the bucket, which is stronger and more durable.

• Higher dumping height and biggest dumping reach.

• The front loader frame provides good machine stability and stronger structural strength.

• Rational matching parts, superior machine performance and extraordinary operating efficiency.

• Various optional equipments and buckets can satisfy different needs of customers.


construction machine Haihong CTX912 wheel loader, cheap wheel loader


construction machine Haihong CTX912 wheel loader, cheap wheel loader


construction machine Haihong CTX912 wheel loader, cheap wheel loader


construction machine Haihong CTX912 wheel loader, cheap wheel loader


construction machine Haihong CTX912 wheel loader, cheap wheel loader



Technical Specifications of CTX912:

construction machine Haihong CTX912 wheel loader, cheap wheel loader


FAQ:

1.How about the shipment?

You can put 3 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days. 


2. What about your service?

Our quality ensurance time is 3 months. And our engineers can supply overseas service. 

Q:at the moment what is the fastest CPU i can buy from AMD?
The top of the line is the AMD Phenom II X6 1100T, the Bulldozer is right around the corner. ADD: The Bulldozer is supposed to be a socket AM3+ chip, **BUT** some socket AM3 - 8XX series chipsets are stating they will support bulldozer. You will need to consult your motherboard manufacturer to see if they will support bulldozer when it comes. It would normally require a BIOS flash as well.
Q:make sense?
Sure, The wrong tool for a task.
Q:Release and Estimate Cost?
Third Quarter 2011.
Q:been waiting but they keep pushing back the date and no offcial info is being released. my computer is failing and i need to upgrade soon
Agreed,It okorder /... So it just might be worth the wait.
Q:AMD Bulldozer FX-8150 vs intel core i5 3470 for gaming
if you use gaming purpose then no problem go ahead
Q:Can loaders and bulldozers work in conjunction with earthworks?
Bulldozer earthmoving, loader and dump truck with earth, earth, sprinkler, sprinkler, bulldozer flat, flat machine end, roller molding, this is the whole earthwork required machinery. Or excavator with the dump truck, soil, sprinkler, sprinkler, bulldozers flat, flat machine end flat, roller mill rolling molding
Q:What is environmentalism like in Israel?
Galactic, Don't forget that the Zionists are mainly Europeans, the minority are arabs or Palestinians, they think like westerners, so all environment protocols are followed as in the west.
Q:I have a list of computer parts here that I looked around and put together. I didn't, just use random parts. I have matched up everything if im right, although im not totally sure seeming this is my first time building a computer.
Where's your GFX Card? You want to use it don't you? Also, AMD Bulldozer is coming out in about a month or two, wait to build an AMD build because prices will drop/you could get a much better CPU. For the GFX (since your going AMD) I'd go for 6770, 6870, 6850, 6950, 6970, or 6990. Yes, all of those parts do work together.
Q:Here are the questions if you know how to work it out please show what you can and the answer. Thanks!1. A 1,000 newton skydiver jumps from an altitude of 3000 meters. What is the total work performed on the skydiver?2. A bulldozer performs 80,000 joules of work pushing dirt a distance of 20meters. What is the force of the dirt?3. What is the force on a 1 kg ball that is falling freely due to the pull of gravity?4. A mass of 1 kg is acted upon by a force of 2 newtons. What acceleration does the mass acquire?5. Find the distance an object will move if it travels at a speed of 4 meters/second for 10 seconds. 6. Find the time it would take a vehicle moving north at 30 km/hr to travel 27 kilometers.
1) Work is force x distance (if they are parallel, if not you have to apply vector calculus) so it'd be 1,000,000 joules 2) again, if W = F*d, then F is W/d which would be -4,000 N (negative because it opposes the bulldozer's force, which is the one which performs the work) 3) F = mass*acceleration, so F = m*g (g is the gravitational pull, or 9,8 m/s^2) so 9,8 N 4) 2 m/s^2, by the same formula 5) distance = velocity*time, so it's 40 metres 6) by the same formula, 54 minutes.
Q:Does it shares with graphic card??..what should i buy phenom2 x-6 or fx8150 of amd??
why are you comparing irrelevent things? Chache memory is on cpu and its never shared with a dedicated graphics card. Graphics card have their own dedicated graphic memory and if ur using onboard graphics then it will share your system memory (RAM), not the chache.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords