Construction Lifting Hoist 2016 China Construction Elevator

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
1000 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Item specifice:

Power Source: Electric Maximum Lifting Weight: 2000 Maximum Lifting Height(M): 200
Lift Speed: 40

Product Description:


 Construction Lifting Hoist  2016 China  Construction Elevator 

We are special supplier of building hoist in China, our building hoist have been Widely exported to all over the world and won good reputation, whose payload capacity is as much as 10000kg, lifting speed can reach up to 96m/min, and the erection height reaches up to 550m., our products have been widely used for transportation for both men and cargo in field of general buildings, but also industry, electric power, mining well, oil, chemical industry etc.
SC270TD, SC270/270TD building hoist:
1). Each cage load capacity: 2700kg
2). Lifting speed: 36m/min, or 0∼ 63m/min, or 0∼ 96m/min
3). Mast section: Paint or hot dipping zinc
4). Cage: Single cage or twin cage
5). Recommended cage inner dimension(LxWxH)(m): 2.5x1.3 x2.5; 3.0x1.3x2.5; 3.2x1.5x2.5; 3.6x1.5x2.5; 3.8x1.5x2.5; 4.0x1.5x2.5; 4.2x1.5x2.5, cage dimension is according to requirement of customer and special project.
6). Motor and reducing device: Made in China, can be SEW Germany according to requirements.
7). Counterweight: With counterweight or without counterweight
8). The colors of cage: Yellow, or red, or blue
9). Other each cage load capacity for your to choose: 1000kg, 2000kg, 2700kg, or 3200kg




Type
 
Payload kg
 
Lifting speed m/min
 
Motor power kW
 
Inverter power kW
 
Counter Weight kg
 
Low speed
 
Single cage no counterweight
 
SC200GD
 
2000
 
0~46
 
3×15
 
45
 
0
 
SC270GD
 
2700
 
0~46
 
3×18.5
 
55
 
0
 
SC320GD
 
3200
 
0~46
 
3×22
 
75
 
0
 
Twin cage no counterweight
 
SC200/200GD
 
2×2000
 
0~46
 
2×3×15
 
2×45
 
0
 
SC270/270GD
 
2×2700
 
0~46
 
2×3×18.5
 
2×55
 
0
 
SC320/320GD
 
2×3200 
 
0~46
 
2×3×22
 
2×75
 
0
 
Middle speed
 
Single cage no counterweight
 
SC120GZ
 
1200
 
0~63
 
3×15
 
45
 
0
 
SC200GZ
 
2000
 
0~63
 
3×18.5
 
55
 
0
 
Single cage with counterweight
 
SCD200GZ
 
2000
 
0~63
 
2×15
 
30
 
2000
 
SCD270GZ
 
2700
 
0~63
 
2×18.5
 
37
 
2000
 
SCD320GZ
 
3200
 
0~63
 
3×15
 
45
 
2000
 
Twin cage no counterweight
 
SC120/120GZ
 
2×1200
 
0~63
 
2×3×15
 
2×45
 
0
 
SC200/200GZ
 
2×2000
 
0~63
 
2×3×18.5
 
2×55
 
0
 
Twin cage with counterweight
 
SCD200/200GZ
 
2×2000
 
0~63
 
2×15
 
2×30
 
2×2000
 
SCD270/270GZ
 
2×2700
 
0~63
 
2×18.5
 
2×37
 
2×2000
 
SCD320/320GZ
 
2×3200
 
0~63
 
2×3×15
 
2×45
 
2×2000
 
High speed
 
Single cage no counterweight
 
SC100GS
 
1000
 
0~96
 
3×22
 
75
 
0
 
SC120GS
 
1200
 
0~96
 
3×22
 
75
 
0
 
SC200G
 
2000
 
0~96
 
3×22
 
90
 
0
 
SC200GS
 
2000
 
0~96
 
3×22
 
90
 
0
 
Single cage with counterweight
 
SCD200G
 
2000
 
0~96
 
3×15
 
45
 
2000
 
SCD200GS
 
2000
 
0~96
 
2×22
 
45
 
2000
 
SCD270G
 
2700
 
0~96
 
3×18.5
 
55
 
2000
 
SCD320GS
 
3200
 
0~96
 
3×22
 
75
 
2000
 
Twin cage no counterweight
 
SC100/100GS
 
2×1000
 
0~96
 
2×3×22
 
2×75
 
0
 
SC120/120GS/
 
2×1200
 
0~96
 
2×3×22
 
2×75
 
0
 
SC200/200G
 
2×2000
 
0~96
 
2×3×22
 
2×90
 
0
 
SC200/200GS
 
2×2000
 
0~96
 
2×3×22
 
2×90
 
0
 
Twin cage with counterweight
 
SCD200/200G
 
2×2000
 
0~96
 
2×3×15
 
2×45
 
2×2000
 
SCD200/200GS
 
2×2000
 
0~96
 
2×2×22
 
2×45
 
2×2000
 
SCD270/270G
 
2×2700
 
0~96
 
2×3×18.5
 
2×55
 
2×2000
 
SCD320/320G
 
2×3200
 
0~96
 
2×3×22
 
2×75
 
2×2000
 
SCD320/320GS
 
2×3200
 
0~96
 
2×3×22
 
2×75
 
2×2000
 


Construction Lifting Hoist  2016 China  Construction Elevator

Construction Lifting Hoist  2016 China  Construction Elevator

Construction Lifting Hoist  2016 China  Construction Elevator


Construction Lifting Hoist  2016 China  Construction Elevator


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How many meters must be installed in the construction elevator search?
In the guangdong area, the first installation and acceptance of the equipment will be below 7 levels, and more than 7 floors will be charged for the inspection. Another 9 meters per wall, the most suitable installation time is a building at least 12 meters, which can be installed at 21 meters in the evening.
Q:Construction elevator positioning should consider which problems
The construction elevator is short for construction. It is an important equipment in high-rise building construction, and construction site accident hazards easily, because it can cause many major accidents, injuries in the inspection should be listed as a key to check the content. Based on past accidents and on-site inspections, we often find topics that we think should be examined in a critical area
Q:Do the elevator need to be installed when the main project is in construction
Installation, of course. The general building should be installed at about 10 meters on the 4th floor, or the person will go up and down the time is dangerous, and there will be some materials that can't be carried by the tower, too slowly
Q:How large a leakage protector is used for the construction elevator
If it is 33KW, direct start, single cage, 160A, leakage action current 50ma-75ma, movement time 0.1 s, electrical machine leakage protector. The best.
Q:How does the construction lift fall without electricity
The lockers are finished with the report, unless there is a problem
Q:Is the elevator detail a construction plan? Do you have a detailed picture of the elevator?
The construction diagram of the elevator appears to be a qualified elevator construction unit
Q:What is the main function of the construction elevator safety guard
When the cage is unexpectedly overspeed, the cage will be stationary on the rail frame and cut off the power supply to ensure the safety of personnel and equipment.
Q:Can a construction elevator use a single cage
The construction elevator is designed to solve the construction machinery that can not be carried by the dragon door frame. Dual-use is the biggest feature of the construction elevator.
Q:The tower crane is on a surface with the construction elevator, and only 2 or 3 meters away. Is that allowed
There are no rules for the distance between tower crane and construction elevator, but note the following points: (1) the foundation of the tower crane and the construction elevator cannot affect each other; (2) the construction elevator shall not be higher than the tower crane. (3) the location of the elevator shall not be blocked by the position of the construction elevator; (4) the use of the same circuit and the same distribution box with the construction elevator shall not be used by the tower crane. The distance between the tower crane and the construction elevator can be anywhere, as long as the above aspects are met.
Q:The construction elevator relies on what to carry heavy, static hour force point where
The driver of the elevator ladder cage is driven by two or three worm gear reducers, which carry heavy lifting parts, and gravity is carried by the rack. At rest, the force point is in the meshing of the gear and rack. It is the main balance between the rewire rope and the ladder cage and the relative motion. For heavy can improve dynamic performance, a heavy on the ladder cage running more smoothly, when a fall, fall of heavy can slow down the ladder cage speed, it should be said that safety performance is better.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range