• Construction Lifter SCD200/200 Hoists for Sale System 1
  • Construction Lifter SCD200/200 Hoists for Sale System 2
  • Construction Lifter SCD200/200 Hoists for Sale System 3
Construction Lifter SCD200/200 Hoists for Sale

Construction Lifter SCD200/200 Hoists for Sale

Ref Price:
$200.00 - 2,000.00 / unit get latest price
Loading Port:
Dalian
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
20 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Structure of Building Hoist 

 

1.Feature: Construction Hoist                        

2.Payload(kg):2*2000                                          

3.Lifting Speed(m/min):0-60                          

4.Motor Power(kw): 2*2*15

5.Safety Device: 2*SAJ40-1.4                             

6.Cage: Double                                              

7.Counterweight: Yes

8.Certification: CE,ISO                                      

9.Place of Origin: China(Mainland)              

10.Model Number: Type:SCD200/200

 

Main Parts of Building Hoist 

 

1. The cage drive system is equipped with buffering device, so the cage moves more stable.
2. The ergonomically designed cage interior improves comfortableness.
3. The unique structural design has applied for patent.
4. The typical technologies ensure the malposition difference of the guide rail.
5. The excellent parts in the industry ensures reliable quality of the machine.
6. Precise assembly and accurate drive.
7. Professional solutions for special projects.
8. The complete safety devices ensures reliable control system.

 

Building Hoist images

 

Construction Lifter SCD200/200 Hoists for Sale

 

Building Hoist Specifiction

 

Model

SC200

SC200/200

SC100

SC100/100

Rated Capacity (kg)

2000

2x2000

1000

2x1000

Rated Hoist Speed (m/min)

36

36

32

36

Max. sling Height (m)

200

200

200

200

Motor Power (kw)

3x11

2x3x11

2x11

2x2x11

Cage Inner Dimension (m)

3x1.3x2.5

3x1.5x2.5

3x1.3x2.5

3x1.5x2.5

Cage Weight (kg)

1400

1400

1400

1400

Mast Section Weight (kg)

163

163

163

163

Mast Section Spec (mm)

1508x650x650

1508x650x650

1508x650x650

1508x650x650

Steeve Rated Sling Weight (kg)

180

180

180

180

Bottom Cage Exterior Dimension (mm)

3100x4200

3100x4200

3100x4200

3100x4200

 

FAQ of Building Hoist

 

Q: What is the building hoist main purpose? 

A: Building hoist equipped with double or single cabin to transport the materials and labors up and down. It's the ideal construction equipment for vertical transportation in the field of construction.  

 

Q: What is the main structure of building hoist? 

A: The P/M construction hoist mainly contains metal structure, driving system, electrical control system, cable guide & protection system, electrical top crane and safety device.

  

Q: What is the meaning of the building hoist’s code?

 A: Take SC200/200 for example: “SC” stands for rack and pinion hoist, “200/200” stands for double cage and capacity is 2 tons per cage. “SC200” stands for single cage and capacity is 2 tons. 

Q:What is the main function of elevator motherboard?
It's collecting the peripheral signals and testing and assigning the output instructions,
Q:The construction elevator can only go up can't come down what happened
Look at the contactor connectionThe drop contactor does not absorb
Q:How does the construction lift fall without electricity
This is not calculated according to the distance, it is calculated speed, when the anti-pendant achieves the rated speed, the pendant should be held automatically. It can't go on.
Q:The difference between the derrick and the construction elevator?
Derrick is with the hoist rope hoisting, referred to as goods for SSB100 type, with construction lifter model does not allow the manned, deadweight is one tons, construction lifter is said cargo amphibious ladder, with gear and rack driving, weight is 2 tons, you can have a look at the GB/T 10054-2005, the construction lifter, with clear rules.
Q:Where is the location of the elevator in the project
Construction elevator location setting, need to take into consideration the situation of the scene and the layout of the building, should consider the following factors: To facilitate the conveyance of material transportation, choose the more spacious rooms in the layout of the floor as import and export; The outside of the elevator is as spacious as possible, with construction channels and materials. The construction materials are minimized in the floor, usually in the middle of the flat. The construction personnel are handy; Monomer building expansion joints at the junction, traffic between unit set up by the elevator capsules export operation platform is completed, so the corresponding reduced floor wall body of the reserved hole lien expansion joints
Q:The construction elevator should have those procedures
Installation and demolition plan, content can guide safe construction, and have complete approval procedure. The installation and demolition of the team must hold the certificate of safety of the above provincial competent authorities. There should be substantial content for the safety of the installation, the demolition of the staff and the safety technology of the driver. Should have basic design, hidden acceptance and concrete strength speech. The inspection and acceptance of the installation completed and the inspection presentation of the competent part. The construction elevator has a record. The elevator is using a copy of the original copy. An employee's special course post certificate. Other relevant safety information. The construction elevator is a larger vertical transport equipment, and the safety and blood lessons of previous accidents are profound. Strict inspection, the key prevention of elevator accidents, is the key link of the safety management at the construction site, and the safety management staff at all levels should be awake and familiar.
Q:The construction elevator is commonly used in the process of the project
For example, building construction is used for more than two floors
Q:Why is the construction elevator open on one side and the other on the other
Open the door, commonly known as the feed door, usually open up, and add weights to both sides. Only if the construction ladder stops at the bottom. If the door is double open, the room must be left with half a door (> 1.3 m) to open the door completely. If it is a single open door that opens up, you can save space in the cage. Double door, namely, two doors, either up or down, the two doors balance weight. It usually arrives on the required floor. There is enough room for double doors.
Q:What is the height of protecting door protection of construction elevator
Referring to the unified code of construction safety technology of GB 50870-2013, and the construction safety inspection standard JGJ59-2011
Q:Is the elevator detail a construction plan? Do you have a detailed picture of the elevator?
You're talking about the elevator or the elevator shaft, the elevator is the equipment, the elevator manufacturer has the working paper. As for the elevator well according to the data of zxtech figure design, general construction diagram and structure diagram, industry make a steel cylinder or cone steel structure party sometimes out construction diagram, according to the structure of the construction

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords