• Construction Hoist SC300 heavy Machinery System 1
  • Construction Hoist SC300 heavy Machinery System 2
  • Construction Hoist SC300 heavy Machinery System 3
  • Construction Hoist SC300 heavy Machinery System 4
  • Construction Hoist SC300 heavy Machinery System 5
Construction Hoist SC300 heavy Machinery

Construction Hoist SC300 heavy Machinery

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Structure of Construction Hoist Description


1.Feature: Construction Hoist                                  

2.Payload(kg):3000                                          

3.Lifting Speed(m/min):33                             

4.Motor Power(kw): 3*15

5.Safety Device: SAJ50-1.2                              

6.Cage: Single                                              

7.Counterweight: No

8.Certification: CE,ISO                                      

9.Place of Origin: China(Mainland)               

10.Model Number: Type:SC300

 

Packaging & Delivery of Construction Hoist 


Packaging Detail: Nude package          Delivery Detail: 25-30days

 

Main Parts of Construction Hoist

1. Quality raw material, strict production management and career responsibility to make the hoist with the highest safety control, and the advanced design make it with good vision to enhance the safety.

2. Simple structure and low cost

3. Convenient in installation, disassembly and maintenance.

4. Energy-saving, starting current is lower than the rated current.

5. Adjustable speed, the maximum speed could reach 96m/min.

6. Frequency conversion control system, stable starting and breaking and low mechanical wear


Construction Hoist Specifiction

 

Single cage High speed  

Model

Speed(m/min)

Deadweight(kg)

Motor(KW)

Counterweight

Specification(L×W×H)(m)

SC100G

96

1000

3×22

No

2.5×1.3×2.5

SC120G

96

1200

3×22

NO

3.0×1.3×2.5

SCD200G

96

2000

3×15

Have

3.2×1.5×2.5

SC200G

96

2250

3×22

No

3.2×1.5×2.5

SC270GS

96

2700

3×22

No

3.8×1.5×2.5

SCD270G

96

2700

3×18.5

Have

3.8×1.5×2.5

SCD300G

96

3000

3×22

Have

4.0×1.5×2.5

SCD320GS

96

3200

3×22

Have

4.2×1.5×2.5

 Single cage Medium speed 

SC100GZ

63

1000

3×15

No

2.5×1.3×2.5

SC120GZ

63

1200

3×15

No

3.0×1.3×2.5

SCD200GZ

63

2000

2×15

Have

3.0×1.3×2.5

SC200GZ

63

2000

3×18.5

No

3.0×1.3×2.5

SC225GZ

63

2250

2×18.5

No

3.2×1.5×2.5

SC225GZ

63

2250

3×18.5

Have

3.6×1.5×2.5

SCD250GZ

63

2500

2×18.5

Have

3.6×1.5×2.5

SC250GZ

63

2500

3×18.5

Have

3.8×1.5×2.5

SCD270GZ

63

2700

2×18.5

Have

3.8×1.5×2.5

SC270GZ

63

2700

3×22

NO

4.0×1.5×2.5

SCD300GZ

63

3000

3×15

Have

4.0×1.5×2.5

SCD320GZ

63

3200

3×15

Have

4.2×1.5×2.5

 Single cage standard speed 

SC100TD

36

1000

2×11

NO

2.5×1.3×2.5

SC120TD

36

1200

2×11

NO

3.0×1.3×2.5

SC200TD

36

2000

3×11

NO

3.0×1.3×2.5

SCD200TD

36

2000

2×11

Have

3.2×1.5×2.5

SC270TD

36

2700

3×15

NO

3.6×1.5×2.5

SCD270TD

36

2700

2×11

Have

3.8×1.5×2.5

SC320TD

36

3200

3×18.5

NO

4.0×1.5×2.5

SCD320TD

36

3200

2×11

Have

4.2×1.5×2.5

Construction Hoist SC300 Heavy Machinery

Construction Hoist SC300 Heavy Machinery

Construction Hoist SC300 Heavy Machinery

Construction Hoist SC300 Heavy Machinery

Construction Hoist SC300 Heavy Machinery

FAQ of Construction Hoist


Q: What is the building hoist main purpose? 

A: Building hoist equipped with double or single cabin to transport the materials and labors up and down. It's the ideal 

construction equipment for vertical transportation in the field of construction.  


Q: What is the main structure of building hoist? 

A: The P/M construction hoist mainly contains metal structure, driving system, electrical control system, cable guide & 

protection system, electrical top crane and safety device.  

  

Q: What is the meaning of the building hoist’s code?

 A: Take SC200/200 for example: “SC” stands for rack and pinion hoist, “200/200” stands for double cage and capacity 

is 2 tons per cage. “SC200” stands for single cage and capacity is 2 tons. 

 

Q: What is the dimension of the cage? 

A: Normally the cage dimension is 3X1.5X2.5M (L/W/H) for 2t type hoist. Details should be checked according to our 

quotation sheet. Also, the size can be customized according to the factual site condition.  There are two doors (entrance

 & exit doors) for each cage, It can be produced as up & down sliding or ramping model for safety and convenience.  

Q:Is there a specification requirement for the floor door of the elevator to the floor? How high
There is no technical requirement, usually to see party a's request, want to be with party a the ground level that finish finished decorate just like, can,
Q:Why do you ask the construction elevator to be a certain distance from the structure? Is very close to if not you can not bother to do delivery channel security protection or something, out of the elevator out directly, and attachment should be able to get more easily, to solve. Thank you very much!!
Isn't there a car? Normally, the center line of the car should be in the same line as the support frame center. If the frame body (standard) get into the building, inevitably cause capsules center, usually the center of gravity and center is not a straight line on the standard section, capsules will force up and down roller, increase and the frame body wear, and certainly not safe.
Q:What is the need for the sc200/200 construction elevator cable?
General is 3 times 16 + 2 * 6, want to know can seek professional construction lift machine cable market manufacturer ask
Q:The construction elevator can only go up can't come down what happened
Does the motor have electricity when it falls? Look at the switch and the line first, then check the controller.
Q:How many meters or how many layers should the construction elevator be installed?
In the guangdong area, the first installation and acceptance of the equipment will be below 7 levels, and more than 7 floors will be charged for the inspection. Another 9 meters per wall, the most suitable installation time is a building at least 12 meters, which can be installed at 21 meters in the evening.
Q:How large a leakage protector is used for the construction elevator
The leakage current is less than 30 milliamps The short circuit current is typically 1.2 to 1.5 times the rated current If the motor is rated at 10, it is usually used with a 125-15 leakage protector
Q:The staff on the construction platform shall not exceed the number of people
Different models have different load rating and platform lift platform size, this depends, suzhou new aluminium alloy elevator, Lin professional aluminum alloy lift platform.
Q:Gear rack driven
The driver of the elevator ladder cage is driven by two or three worm gear reducers, which carry heavy lifting parts, and gravity is carried by the rack. At rest, the force point is in the meshing of the gear and rack. It is the main balance between the rewire rope and the ladder cage and the relative motion. For heavy can improve dynamic performance, a heavy on the ladder cage running more smoothly, when a fall, fall of heavy can slow down the ladder cage speed, it should be said that safety performance is better.
Q:Construction elevator positioning should consider which problems
The construction elevator is short for construction. It is an important equipment in high-rise building construction, and construction site accident hazards easily, because it can cause many major accidents, injuries in the inspection should be listed as a key to check the content. Based on past accidents and on-site inspections, we often find topics that we think should be examined in a critical area
Q:There are differences between the construction elevator and the construction elevator
Construction lifter and building construction elevator, manned cargo construction machinery is a frequently used in construction, because of its unique enclosure structure make it take up both comfort and safety, construction lifter is usually used with tower crane on the construction site, the average load in 1-3 tons, running speed is 1 to 60 m/min. There are many kinds of elevators in construction, there are no two kinds of weights and weights in the way of operation, and they are controlled by manual control and automatic control. You can also add inverter and PLC control modules as needed, and also add floor calling devices to the peace layer.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords