Construction Hoist SC300 heavy Machinery

Ref Price:
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Structure of Construction Hoist Description


1.Feature: Construction Hoist                                  

2.Payload(kg):3000                                          

3.Lifting Speed(m/min):33                             

4.Motor Power(kw): 3*15

5.Safety Device: SAJ50-1.2                              

6.Cage: Single                                              

7.Counterweight: No

8.Certification: CE,ISO                                      

9.Place of Origin: China(Mainland)               

10.Model Number: Type:SC300

 

Packaging & Delivery of Construction Hoist 


Packaging Detail: Nude package          Delivery Detail: 25-30days

 

Main Parts of Construction Hoist

1. Quality raw material, strict production management and career responsibility to make the hoist with the highest safety control, and the advanced design make it with good vision to enhance the safety.

2. Simple structure and low cost

3. Convenient in installation, disassembly and maintenance.

4. Energy-saving, starting current is lower than the rated current.

5. Adjustable speed, the maximum speed could reach 96m/min.

6. Frequency conversion control system, stable starting and breaking and low mechanical wear


Construction Hoist Specifiction

 

Single cage High speed  

Model

Speed(m/min)

Deadweight(kg)

Motor(KW)

Counterweight

Specification(L×W×H)(m)

SC100G

96

1000

3×22

No

2.5×1.3×2.5

SC120G

96

1200

3×22

NO

3.0×1.3×2.5

SCD200G

96

2000

3×15

Have

3.2×1.5×2.5

SC200G

96

2250

3×22

No

3.2×1.5×2.5

SC270GS

96

2700

3×22

No

3.8×1.5×2.5

SCD270G

96

2700

3×18.5

Have

3.8×1.5×2.5

SCD300G

96

3000

3×22

Have

4.0×1.5×2.5

SCD320GS

96

3200

3×22

Have

4.2×1.5×2.5

 Single cage Medium speed 

SC100GZ

63

1000

3×15

No

2.5×1.3×2.5

SC120GZ

63

1200

3×15

No

3.0×1.3×2.5

SCD200GZ

63

2000

2×15

Have

3.0×1.3×2.5

SC200GZ

63

2000

3×18.5

No

3.0×1.3×2.5

SC225GZ

63

2250

2×18.5

No

3.2×1.5×2.5

SC225GZ

63

2250

3×18.5

Have

3.6×1.5×2.5

SCD250GZ

63

2500

2×18.5

Have

3.6×1.5×2.5

SC250GZ

63

2500

3×18.5

Have

3.8×1.5×2.5

SCD270GZ

63

2700

2×18.5

Have

3.8×1.5×2.5

SC270GZ

63

2700

3×22

NO

4.0×1.5×2.5

SCD300GZ

63

3000

3×15

Have

4.0×1.5×2.5

SCD320GZ

63

3200

3×15

Have

4.2×1.5×2.5

 Single cage standard speed 

SC100TD

36

1000

2×11

NO

2.5×1.3×2.5

SC120TD

36

1200

2×11

NO

3.0×1.3×2.5

SC200TD

36

2000

3×11

NO

3.0×1.3×2.5

SCD200TD

36

2000

2×11

Have

3.2×1.5×2.5

SC270TD

36

2700

3×15

NO

3.6×1.5×2.5

SCD270TD

36

2700

2×11

Have

3.8×1.5×2.5

SC320TD

36

3200

3×18.5

NO

4.0×1.5×2.5

SCD320TD

36

3200

2×11

Have

4.2×1.5×2.5

Construction Hoist SC300 Heavy Machinery

Construction Hoist SC300 Heavy Machinery

Construction Hoist SC300 Heavy Machinery

Construction Hoist SC300 Heavy Machinery

Construction Hoist SC300 Heavy Machinery

FAQ of Construction Hoist


Q: What is the building hoist main purpose? 

A: Building hoist equipped with double or single cabin to transport the materials and labors up and down. It's the ideal 

construction equipment for vertical transportation in the field of construction.  


Q: What is the main structure of building hoist? 

A: The P/M construction hoist mainly contains metal structure, driving system, electrical control system, cable guide & 

protection system, electrical top crane and safety device.  

  

Q: What is the meaning of the building hoist’s code?

 A: Take SC200/200 for example: “SC” stands for rack and pinion hoist, “200/200” stands for double cage and capacity 

is 2 tons per cage. “SC200” stands for single cage and capacity is 2 tons. 

 

Q: What is the dimension of the cage? 

A: Normally the cage dimension is 3X1.5X2.5M (L/W/H) for 2t type hoist. Details should be checked according to our 

quotation sheet. Also, the size can be customized according to the factual site condition.  There are two doors (entrance

 & exit doors) for each cage, It can be produced as up & down sliding or ramping model for safety and convenience.  

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:The tower crane is on a surface with the construction elevator, and only 2 or 3 meters away. Is that allowed
There are no rules for the distance between tower crane and construction elevator, but note the following points: (1) the foundation of the tower crane and the construction elevator cannot affect each other; (2) the construction elevator shall not be higher than the tower crane. (3) the location of the elevator shall not be blocked by the position of the construction elevator; (4) the use of the same circuit and the same distribution box with the construction elevator shall not be used by the tower crane. The distance between the tower crane and the construction elevator can be anywhere, as long as the above aspects are met.
Q:How many kw is the sc construction elevator
A double cage, the three-drive is 11 * 3 * 2KW and the two drives are 12 * 2 * 2KW
Q:The staff on the construction platform shall not exceed the number of people
There is no specific specification that should be more platform-specific
Q:How is the construction elevator installed
The construction elevator should choose a good position first, do the elevator foundation, at the same time make the wall in the setting process. This one has the corresponding elevator basic drawing, should the professional personnel carry on setting up and disassembling.
Q:The construction of more than many floors must be used for construction elevators
The average height is more than 12 stories. Construction elevators are often called construction elevators, but construction lifts include a broader definition, and construction platforms are part of the construction elevator series. Simple construction elevator is by car, driving mechanism, standard section, attached to the wall, chassis, fence, electrical system and so on several parts, manned cargo construction machinery is a frequently used in construction, because of its unique enclosure structure make it take up both comfort and safety, construction elevator is usually used with tower crane on the construction site, the average load in 1-3 tons, running speed is 1 to 60 m/min. The construction elevator of our country is more and more mature, and gradually goes to the international.
Q:What are the requirements for the construction elevator
The anti-drop safety device is an important part of the construction elevator, which can be relied on to eliminate the occurrence of the fall accident and guarantee the safety of the crew. So for safety device factory test is very strict, before delivery by the statutory inspection unit for torque measurement, critical speed measurement, measuring the amount of spring compression, each with the test report, after assembly to the construction lifter for drop test under rated load, and the site to use the elevator must be every three months to conduct a drop test. For safety device to the factory for two years for safety device (delivery date), must also be sent to the statutory inspection unit to carry on the test, after testing once a year. So far few inspection, some sites even once every three months to detect don't do drop test, all think that their is no problem for safety device, but once had an accident, repent at leisure. Why not do regular tests and tests? The use of units blindly thinks that not bad is good. Actually good or bad for safety device can only judge by test and inspection in the daily operation is not sure whether it is good or bad, for those who are serving for safety device, or advice for the earlier inspection and regular test, only accomplish know fairly well, to malignant accident prevention rather than cure.
Q:Should a fire extinguisher be equipped in the construction elevator?
The temporary building area shall be equipped with fire equipment according to the regulations. In general temporary facilities, each 100m2 is equipped with two 10L extinguisher. If the total area of a large temporary facility exceeds 1200m2, there shall be a special service for fire fighting, such as taiping pail, water bucket (pool), and huangsha ponds, etc. No items shall be piled up around the facilities. Between temporary carpenter's room, paint room, wood and machine tools, each 25m2 should be equipped with a suitable extinguisher. The oil depot and dangerous goods warehouse shall be equipped with sufficient quantity and type suitable extinguisher.
Q:How many guides are in the construction elevator
A guide frame on each side of the construction elevator, which is formed by using the section of the standard section in section 1.
Q:What procedures and procedures will be required to re-use after the construction elevator overhaul?
The elevator overhaul formalities; First report to the local special court, after the approval of the major repair, the major repair unit should have a major repair record to leave the record of party a, including the replacement parts or the procedure that changes. Then the local special inspection hospital will be required to check again.
Q:Construction elevator positioning should consider which problems
It is convenient to install the wall with the wall

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range