• Construction Hoist Material Handing Equipment System 1
  • Construction Hoist Material Handing Equipment System 2
  • Construction Hoist Material Handing Equipment System 3
  • Construction Hoist Material Handing Equipment System 4
  • Construction Hoist Material Handing Equipment System 5
  • Construction Hoist Material Handing Equipment System 6
Construction Hoist Material Handing Equipment

Construction Hoist Material Handing Equipment

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

Structure of Construction Hoist Description

 

The general building hoist manufactured by our company have the features as good quality, long life, wide application range and convenient for maintenance. The gearing adopted bearing,enameled cable, and oil seal. The electric parts adopt products from worl renowned manufacturers such as Schneider, Siemes, and LG. The racks and pinion adopts specal material and heat-treatment technique, which prolong the life of these parts. The steel structure uses quality steel from famous domestic manufacturers. The surface of the structure can apply paint-spray, parkerizing baking finish or hot galvanizing processing according to users requirments. The cage can be produced and decorated by aluminum molded board, punched-plate or figured aluminum board.

 

Main Features of Construction Hoist

 

1. The recomended cage dimension(L*W*H)(m): 2.0*1.0*2.5, 2.5*1.0*2.5, 2.5*1.3*2.5, 3.0*1.5*2,5, 3.2*1.5*2.5, 3.8*1.5*2.5, 4.0*1.5*2.5, 4.2*1.5*2.5 etc. We can also manufacture cages of other size according to the user.
2. The cage and the door material can be aluminum molded board, punched-plate, figured aluminum board or other type according to yout requirements.
3. The mast section and the tie-in surface can adopt paint-spray, or hot galvanizing processing.. 

Construction Hoist Specifiction 

SC series product also has special design, such as reinforced guide rail with cross-section of 800mm, inclined type, special for cooling tower, etc. All the double cage building hoist can be changed into single cage type,

  TypePayload(kg)Lifting Speed         (m/min)Motor Power(kw)Safety Device
Twin Cage HoistNo CounterweightSC100/1002*1000332*2*112*SAJ30-1.2
SC120/1202*1200332*2*112*SAJ30-1.2
SC160/1602*1600332*2*112*SAJ30-1.2
SC200/2002*2000332*3*112*SAJ40-1.2
SC250/2502*2500332*3*112*SAJ50-1.2
SC270/2702*2700332*3*152*SAJ50-1.2
SC300/3002*3000332*3*152*SAJ50-1.2
SC320/3202*3200332*3*152*SAJ50-1.2
With CounterweightSCD200/2002*2000332*2*112*SAJ40-1.2
SCD250/2502*2500332*2*112*SAJ50-1.2
SCD270/2702*2700332*2*152*SAJ50-1.2
SCD300/3002*3000332*2*152*SAJ50-1.2
SCD320/3202*3200332*2*152*SAJ50-1.2

 

Images of Construction Hoist

 

 

Construction Hoist Material Handing Equipment

Construction Hoist Material Handing Equipment

Construction Hoist Material Handing Equipment

Construction Hoist Material Handing Equipment

Construction Hoist Material Handing Equipment

 

FAQ of Construction Hoist

 

Q: What is the building hoist main purpose? 

A: Building hoist equipped with double or single cabin to transport the materials and labors up and down. It's the ideal 

construction equipment for vertical transportation in the field of construction.

Q: What is the main structure of building hoist? 

A: The P/M construction hoist mainly contains metal structure, driving system, electrical control system, cable guide & protection system, electrical top crane and safety device.  

Q: What is the meaning of the building hoist’s code?

 A: Take SC200/200 for example: “SC” stands for rack and pinion hoist, “200/200” stands for double cage and capacity is 2 tons per cage. “SC200” stands for single cage and capacity is 2 tons. 

Q:What is the need for the sc200/200 construction elevator cable?
The company now USES 3X25 + 2x10 cables
Q:How do construction suspension scaffolding be handled in the people's elevator?
Suspension of steel and steel is used to avoid the elevator, and it is OK to encrypt it on both sides of the elevator
Q:How long does the construction elevator do a crash test
You don't have to do it now. Go straight to the test center. A site is tested once
Q:How many floors are built to use the construction elevator? With six floors?
No ~ there is no hard and fast rule, you need to choose from the construction, main consideration cost
Q:Construction elevator positioning should consider which problems
It is convenient to install the wall with the wall
Q:The maximum allowable deviation of the vertical is the vertical degree when the construction elevator is installed
5 kinds of circumstances. 1: the height of the elevator guide frame is less than 70 meters, and the vertical deviation should not be greater than one in 1000 of the height of the guide frame. (assuming the rail frame is 70 meters high, the deviation cannot be greater than 70mm) 2: the rail frame is greater than 70 meters and is less than 100 meters, and the deviation is less than or equal to 70 mm. 3: the guide frame is larger than 100 meters and is less than 150 meters. The deviation is less than or equal to 90 mm. 4: the guide frame is larger than 150 meters is less than or equal to 200 meters. The deviation is less than or equal to 110 mm. 5: the guide frame is greater than 200 meters, and the deviation is less than 130 mm. This is based on the requirement of 5.2.2.1 from GB10054 to 2005. (it used to be a direct copy.)
Q:When building tall buildings, the machine that USES to lift concrete to wait for tall building
The concrete pump, which can be raised in a certain radius, is the tower crane.
Q:What is the height of protecting door protection of construction elevator
Referring to the unified code of construction safety technology of GB 50870-2013, and the construction safety inspection standard JGJ59-2011
Q:Does the building height not exceed 40 meters must install the construction elevator?
In the guangdong area, the first installation and acceptance of the equipment will be below 7 levels, and more than 7 floors will be charged for the inspection. Another 9 meters per wall, the most suitable installation time is a building at least 12 meters, which can be installed at 21 meters in the evening.
Q:Should a fire extinguisher be equipped in the construction elevator?
The dual-purpose construction elevator should be needed

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords