Construction Hoist Building Lifter Payload 2*3000kg

Ref Price:
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
26 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:


Structure of Construction Hoist Description


Product: Construction Hoist                        Condition: New                                            Mast Section: 450x450x1508 Or 650x650x1508mm           

Rated loading(kg):2*3000                               Lifting Speed(m/min):33                              Motor Power(kw): 2*2*15

Safety Device: 2*SAJ50-1.2                            Cage: Double                                              Counterweight: Yes

Certification: CE                                              Cage Size: 3.2x1.5x2.3                                Model Number: SCD300/300

Diameter of Steel Pipe: 76mm                         Thickness Pipe: 4.2mm                               Optional Component: Calling System, Monitor, Landing Door

Construction Hoist Building Lifter Payload 2*3000kg

Construction Hoist Building Lifter Payload 2*3000kg 


Packaging & Shiping

Packaging Detail: Nude in container         Shiping date: 25-30days

 


Main Parts of Construction Hoist


● The gearing adopts imported bearing, enameled cable, and oil seal.

 

● The electric parts adopt products from world renowned manufactures such as Schneider, Siemens, and LG.

 

● The racks is tempered steel and pinion is NO.60 tainwheel steel. 

 

● The steel structure uses quality steel from famous domestic manufactures such as Baosteel .

 

● The surface of the structure can apply paint-spray, parkerozing baking finish or hot galvanizing processing according

    to users requirements,

 

● The cage can be produced and decorated by aluminum molded board, punched-plate or figured aluminm board.


 

Construction Hoist Specifiction


 

Construction Hoist Building Lifter Payload 2*3000kg

 

FAQ of Construction Hoist


Q: What is the building hoist used for? 

A: Building hoist equipped with double or single cabin to transport the materials and labors up and down. It's the ideal 

construction equipment for vertical transportation in the field of construction.  

 

Q: Why do customers choose CMAX brand?

A: CNBM is a China-owned manufcaturer and has been listed in Global Fortune 500 since 2011. CMAX is its brand. It is trustworthy. And reference from worldwide can also be offered.

 

Q: What is the main components of building hoist? 

A: The P/M construction hoist mainly contains metal structure, driving system, electrical control system, cable guide & 

protection system, electrical top crane and safety device.  

  

Q: How do we define construction hoist by model?

 A: Take SC200/200 for example: “SC” stands for rack and pinion hoist, “200/200” stands for double cage and capacity 

is 2 tons per cage. “SC200” stands for single cage and capacity is 2 tons. 

 

Q: What is the dimension of the cage? 

A: Normally the cage dimension is 3X1.5X2.5M (L/W/H) for 2t type hoist. Details should be checked according to our 

quotation sheet. Also, the size can be customized according to the factual site condition.  There are two doors (entrance

 & exit doors) for each cage, It can be produced as up & down sliding or ramping model for safety and convenience.  

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Are there any good signs in the construction elevator door
Referring to the unified code of construction safety technology of GB 50870-2013, and the construction safety inspection standard JGJ59-2011
Q:Safety device for construction elevator
Many 1, 2, upper and lower limit for safety device 3 TDD, extreme limit 4, buffer spring 5, has threshold position switch, single threshold position switch 7, 6 top and limit switch 8 TDD, enclosure door lock 9, lock line 10, has locks There are a lot of electrical safety protection
Q:How is the construction elevator installed
Construction elevator installation 1) the location of the elevator depends on the condition of the site and the equipment, so as far as possible, stay away from the overhead line and keep the safe distance specified. When the elevator is running, there is a lot of danger and should be avoided. 2) the order of installation is: 3) place the chassis on the base and the base pre-buried bolt, and the platform is placed on the chassis, and the basket is placed in the middle of the chassis. 4) to install the standard section, each installation of two standard sections (usually less than 8m) to be temporarily fixed. The wire rope shall be used for the use of the temporary cable, and the joints and supporting points shall be bolted and not tied with the lead wire. 5) the installation should alternate between the two columns. Node bolt specification must according to the aperture matching, not packing, found that the aperture position at the time, can not arbitrarily expanding, more can't to lead wire bundle, instead to avoid loose node deformation. 6) when installing the standard section, pay attention to the vertical degree of the guide, and the line of the guide line should not appear in the line of folding and too big clearance to prevent the collision from running. 7) when construction site conditions permit, it can be assembled on the ground and then hoisted on the whole to reduce the height of the work. Due to the design of the frame, the stress condition of the construction is only considered, so before the whole moving up, the counter can be temporarily strengthened to enhance the bending capacity of the nodes.
Q:The safety officer shall be responsible for the work of the construction elevator
In a nutshell, the security officer is responsible for overseeing, checking, training, maintaining, and dismantling
Q:Is there a specification requirement for the floor door of the elevator to the floor? How high
The door locks must be in the direction of the elevator, and the people on the floor are not allowed to move at will, only the driver will be able to move. The other is that the height of the door must be 1.8 meters high, so that the workers' heads don't reach out to the danger.
Q:How many people are there for construction workers
Different models of different sizes, small can multiply 10 people, this time see a big, can take 14 people
Q:Where is the location of the elevator in the project
The position of construction elevator is usually set in the project to facilitate access to material, material handling and personnel up and down, not affecting the construction process.
Q:Why is the construction elevator not up to the roof
The free end of the construction of the lift height is only 7.5 meters high, general construction elevator drive now is the case, so the hoisting cage height and drive around 4.5 meters high, the other national standard construction elevator ceiling limit moves, drive above about 1.8 meters away from the top of the rails. So it's the free end of the construction elevator that can't satisfy the roof.
Q:Can a construction elevator use a single cage
The construction elevator is designed to solve the construction machinery that can not be carried by the dragon door frame. Dual-use is the biggest feature of the construction elevator.
Q:What is the safety device for construction elevator?
Fence threshold position, threshold position, both inside and outside ladder ladder cage cage up and down limit, limit switch, for safety device, weight limiter and ladder to the top of cage outside the door stop, on the abrupt stop switch. The highest point is a toothless standard day. There are elevators and ultra high sensing switches.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range