Construction Hoist 2500kg Capacity Nord Motor

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Item specifice:

Power Source: Electricity Maximum Lifting Weight: 2500kg Maximum Lifting Height(M): 250m
Lift Speed: 0-60 m/min

Product Description:

Building Hoist Description                        

Condition: New                                          

Application: Construction           

Payload(kg):2500                                          

Lifting Speed(m/min):0~60                        

Motor Power(kw): 3*18.5

Safety Device: SAJ50-1.4                            

Cage: Single                                                

Counterweight: No

Certification: CE,ISO                                      

Place of Origin: China(Mainland)              

Model Number: Type:SC250

Packaging & Delivery of Building Hoist 

Packaging Detail: Nude package          

Delivery Detail: 25-30days


Building Hoist Images

Building Hoist SC100 Hot Sale in Veitnam

Building Hoist SC100 Hot Sale in Veitnam

Building Hoist SC100 Hot Sale in Veitnam

Building Hoist Specifiction

Building Hoist SC100 Hot Sale in Veitnam

 

FAQ of Building Hoist

Q: What is the building hoist main purpose? 

A: Building hoist equipped with double or single cabin to transport the materials and labors up and down. It's the ideal 

construction equipment for vertical transportation in the field of construction.  

Q: What is the main structure of building hoist? 

A: The P/M construction hoist mainly contains metal structure, driving system, electrical control system, cable guide & 

protection system, electrical top crane and safety device.  

Q: What is the meaning of the building hoist’s code?

 A: Take SC200/200 for example: “SC” stands for rack and pinion hoist, “200/200” stands for double cage and capacity 

is 2 tons per cage. “SC200” stands for single cage and capacity is 2 tons.   

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:The calculation of the use of electricity in the construction elevator
Try using the security software. There is a cracked version
Q:How does the elevator operate
One must first understand the basic structure of the elevator, function, operation and safety protection measures for each elevator, so each new elevator operation need to carefully look at elevator operation manual! 2 each elevator switches in eye-catching position, the first thing to know to control the power box, and stop buttons and effective protection switch, it is helpful for you in the process of operation, have safety emergency measures! 3 each elevator has the control box, it has indicated the direction and floor indicator, if your operation is simple and easy lift, it is not a lot of protection measures, only up to the threshold, sometimes may malfunction, press in operation had better stop, make sure someone wrong operation or accident happen! 4 as for how to increase the security of the original equipment and measures, can reach Ann and suzhou mechanical and electrical technology department contact, they have free professional technical support and solutions!
Q:Whether the construction elevator is a dual-purpose elevator
The construction elevator is being operated on; And a person's elevator is automatically controlled; The construction elevator is directed by the rack, which is seen in the rack, and the noise is large. The escalator is not a rack, it is usually guided, and the rails are invisible. Construction elevators are rudimentary; And the elevator is complicated.
Q:The construction elevator can only go up can't come down what happened
It hasn't risen yet, how it has fallen! Is it a brain teaser?
Q:How does the construction elevator add up
You can use a ready-made high-altitude operating platform and a high-altitude working platform
Q:Should a fire extinguisher be equipped in the construction elevator?
The dual-purpose construction elevator should be needed
Q:What is the height of protecting door protection of construction elevator
Elevator protection door is strict according to the mandatory standard to set up elevator well protection measures for safety technology. The shaft must be set in the range of 1.5 to 1.8, with protective railings or fixed gate and protective railings or fixed doors. 2, elevator well in plus or minus zero layer need to set up the first safety net, every two layers, the upper part of most every 10 m AnQuanPing network design, network security quality must gb5725-1997 "safety net" of standard network, methods must be checked in accordance with the relevant provisions. Installation in the safety net elevator dismantlement, the operator should wear the seat belt according to the regulation. On the floor and roof, a short side hole is larger than 1.5 m, the hole should be set in the requirement of the protective railing, the bottom setting safety net. To set safety warning signs that meet national standards in the elevator shaft. Safety warning signs are clear, warning lights should be set at night. The protective railings and gates shall be marked with yellow and black stripes and shall be manufactured according to the standards of construction safety technical specifications. 5, elevator wellhead protection facilities need to dismantle or change temporarily, and by the project full-time safety sign shall be the responsibility of the project director, and ready to move or change the security countermeasures. To inform all staff at the same time; Recovery after safety facilities must be by the project director, full-time security personnel and other related personnel on-site inspection management, qualified rear can continue to use.
Q:Why is the construction elevator not so close to the structure?
The distance between the moving parts and the building and the fixed construction equipment shall not be less than 0.25 m. The main thing is to prevent the person from the point of view. For example, workers are on the third floor to look down, hanging cage, where is the result now hanging basket is go down from the fourth floor, if not the 25 cm, likely to brush "cut".
Q:What is the main function of the construction elevator safety guard
For safety device of construction hoist main effect is in the process of elevator used in times of emergency power, hit the brakes, let hoisting cage security attached on the guide rail frame, prevent the hoisting cage falling!
Q:The construction elevator always jumps
Possible causes include: 1, the area that has broken skin in the line, leak the electric trip. There's something wrong with the switch Loose contact points in the line, and bad contact may also jump. It is best to do a thorough examination before closing the lock, and the forced closing is dangerous

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range