Construction Elevator (SC200/200TD) for Sale

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 pc
Supply Capability:
1000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Structure of Building Hoist:


All our machines are ISO, CE, SGS approved, 80% are exported to over 20 countries and earn A reputation form our customers. We commit a good quality with exceptional service and technical Support. On the premise of quality assurance, we always try to do some valid improvement of our hoists To make them better. 
Specifically, Safety is the most importent, we strengthen the safety Control system by machanical and electrical measure, Any exceptional situation happens during The traveling, the system will cut the power automatically to stop the hoist. There are also other improvements to make sure the operation stable and reliable. That is theReason why we are so well received. 

Product Feature: 
1), Better safety control system. 
2), High operational reliability. 
3), Easy to use (install, dismount and maintain). 
4), CE and ISO compliant. 
5), Exceptional service and technical support. 
6), Nice price, Will be within your budget. 


Advantages of Building hoist


Our advantage: 

1- More than 130,000 employee. 
2- state-owned company and Fortune 500 enterprises.
3- own systems of production engineering. 
4- 10 service branch in the work, such as UAE. KSA. IRAN, USA. INDIA, RUSSIA... 
5- Professional construction equipment supplier. 
6- technical experts with great experience in the sector.
7- More pls visit our factory, you will find we are your best choice. 
 
Hoist Advantages: 
1. Quality raw material, strict production management and career responsibility to make the hoist with the highest safety control, and the advanced design make it with good vision to enhance the safety.
2. Simple structure and low cost
3. Convenient in installation, disassembly and maintenance. 
4. Energy-saving, starting current is lower than the rated current.
5. Adjustable speed, the maximum speed could reach 96m/min.
6. Frequency conversion control system, stable starting and breaking and low mechanical wear .


Building Hoist Images:



Construction Elevator (SC200/200TD) for Sale

Construction Elevator (SC200/200TD) for Sale

Construction Elevator (SC200/200TD) for Sale

Construction Elevator (SC200/200TD) for Sale


Building hoist Specifiction:



Elevator classification

Cage

Model

Rated load 

capacity(kg)

Lifting 

speed(m/min)

Moter 

power(kw)

Dimension 

inside cage

(L*W*H)(m) 

Normal construction

 elevator

single cage

SCD200

2000

33

2*11

3.0*1.3*2.4

(3.2*1.5*2.4)

SC200

2000

33

3*11

double cage

SCD200/200

2*2000

33

(2*2) *11

SC200/200

2*2000

33

(2*3)*11

SS100/100

2*1000

24

2*7.5

Frequency construction

elevator

Single cage

SCD200

2000

0-63

3*15

SC200

2000

0-63

3*15

Double cage

SCD200/200

2*2000

0-63

(2*3)*15

SC200/200

2*2000

0-63

(2*3)315



FAQ of Building Hoist:

 

Q: What is the building hoist main purpose? 

A: Building hoist equipped with double or single cabin to transport the materials and labors up and down. It's the ideal 

construction equipment for vertical transportation in the field of construction.  

Q: What is the main structure of building hoist? 

A: The P/M construction hoist mainly contains metal structure, driving system, electrical control system, cable guide & 

protection system, electrical top crane and safety device.  

  

Q: What is the meaning of the building hoist’s code?

 A: Take SC200/200 for example: “SC” stands for rack and pinion hoist, “200/200” stands for double cage and capacity 

is 2 tons per cage. “SC200” stands for single cage and capacity is 2 tons. 

 

Q: What is the dimension of the cage? 

A: Normally the cage dimension is 3X1.5X2.5M (L/W/H) for 2t type hoist. Details should be checked according to our 

quotation sheet. Also, the size can be customized according to the factual site condition.  There are two doors (entrance

 & exit doors) for each cage, It can be produced as up & down sliding or ramping model for safety and convenience


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:The working principle of construction elevator
The construction elevator is a kind of common name, its standard name should be the construction elevator, this is a kind of crane machine equipment. Construction lifter adopts modular structure, because it is used in construction process, the elevator needs to be constantly shift with the construction project, therefore its structure must be easy to disassembly and assembly. For example, after the site is used, the elevator is disintegrated and transported to another site for reassembly of construction elevators. So how does the construction elevator work? The construction elevator mainly carries the structural self-forming system, and the construction dependence is low. It more driven by force, drive devices are installed on the hanging basket, through the gear and rack drive system, the mutual cooperation, so as to realize the rise and fall of the elevator. You may have seen gear and rack in the mechanical clock, the gear is round, the rack is straight, and the two bite together to achieve the motion. The elevator work that is common in our residential and commercial buildings is different from the construction elevator. Most of the elevator parts are fixed in buildings, which are mainly carried by buildings. Its movement is achieved through wire rope.
Q:What procedures and procedures will be required to re-use after the construction elevator overhaul?
The elevator overhaul formalities; First report to the local special court, after the approval of the major repair, the major repair unit should have a major repair record to leave the record of party a, including the replacement parts or the procedure that changes. Then the local special inspection hospital will be required to check again.
Q:How many floors do you need to install a construction elevator?
In this case, you do not need to install the construction elevator at the main stage. After the main body is finished, install the tower crane, reinstall, mainly for decorate the vertical transport of the stage.
Q:What is the need for the sc200/200 construction elevator cable?
The sc200/200 construction elevator cable line should not be below 120 square. Man's ladder 33KW, 5 * 33 = 165KW The tower is 45KW one, 2 * 45 = 90KW The pressure slag welder is estimated to be 25KW Touch welder 1OKW, 5 * 10 = 50KW Other facilities such as mixer, temporary illumination etc. 30KW Total power: 165 + 90 + 25 + 50 + 30 = 365KW One square cable is 5 minus 7A, 380V is 1KW is equal to 2A. That's 730A 730A divided by 5-7 calculates that the cable line should not be less than 120 square.
Q:How much cable does the construction elevator 44KVA need?
44KW three phase power: 79A, BV5X16
Q:The construction of more than many floors must be used for construction elevators
The construction elevator, the average layer height above 12 floors need to be used, the hoist machine is not to go up to use the construction elevator to send a person to carry a few light things upstairs. Pre-installation preparation: After construction, the manufacturer will show the product certificate and provide the instruction manual. According to the technical requirement of installation safety technology checking list according to the construction elevator, the preparation should be inspected. The installation operator should hold the certificate, accept the technical, safety, etc., and make the safety operation rules for the construction lifter. 3, work environment: 1) the power supply must meet the requirement of power supply. 2) no electricity, gas welding or other obstacles to the operation of the crane are prohibited within the part of the elevator installations. 3) the platforms and channels that enter the building from the suspended cage shall reach the bearing capacity of more than two tons, and have strong protective barriers and protective doors. 4) it is forbidden to use guide rack, attached part scaffold, construction platform and the floor channel stretch, pipeline, rope, rope, banners, flags and other things has nothing to do with the elevator; In the evening homework, there should be sufficient illumination. 6) the doors to the floor will be kept in the door, each with a clear sign of the floor number.
Q:When does the construction elevator take off?
This is not specific time, it is the contractor's own
Q:Is the elevator detail a construction plan? Do you have a detailed picture of the elevator?
The construction diagram of the elevator appears to be a qualified elevator construction unit
Q:How does the driver of the construction elevator do the search for a sudden power failure
When the elevator in the operation of the midway stop due to power outages or other reasons, the manual can be decreased, the end of a motor brake electromagnet manual release slowly shake handshandle pull outward, slowly slide down the ladder cage, ladder cage fall shall not exceed the rated speed, manually drop must be conducted by professional maintenance personnel.
Q:Elevator installation approach, need to give the total package (inspect) what data, come a master to answer the detail point
Elevator random documents, material verification documents, product certificate.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range