Construction Cup Lock Scaffolding System

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 pc
Supply Capability:
1000000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.   Structure of Cup-lock Scaffolding

Cup-lock Scaffolding consists of adapter plug of cup-lock, post, cross bar ,diagonal brace ,top bar, base and other fittings. The adapter plug of cup-lock is the core and consists of top cups, bottom cups, post ,ledger connections and limit pins of top cups.

 

It can be widely used for industrial and civil construction and maintenance, such as workshop, large gymnasium, conference& exhibition center conversation, billboard, market, dock, tunnel, subways, etc. used for mobile working platform installation of electrical & mechanical engineering, ship repair and other decoration engineering, for building temporary stand ,with simple roof frame, frame-connected Scaffolding can from temporary dormitory, depot and work shed.

 

2.   Main Features of Cup-lock Scaffolding


1. Multifunction: According to the specific construction requirements, it can be installed the construction equipment which contains different groups of size, shape and bearing capacity of single and double row scaffolding, shoring prop, material hoisting frame, climbing scaffolding, cantilever rack and other functions of construction equipment..

                                                                

2. Efficient: Avoid to use the nut to operate, the speed of installation and dismantle is faster 3 to 5 times than common, workers use a hammer to complete all assignments.

 

3. Strength universality: It takes the common coupler scaffolding steel pipe, which can be connected between coupler and common steel pipe.


3.   Cup-lock Scaffolding Images

 

4.   Cup-lock Scaffolding Specification

.There is a pair of adapter plugs of cup-lock every 0.5m-0.6m on the post and top bar

.5 times fast of adapter plug assembly and disassembly than normal

.Assuring construction of high-rise scaffolding with the whole safety facilities, the safety and reliability in usage

 

5.   FAQ of Cup-lock Scaffolding

1) What can we do for you? 

We can ensure the quality of the vinyl banner and avoid extra expenses for customers.    

    .We can provide you the professional design team.    

    .We can provide fashionable and newest styles for you.    

    .We can design the artwork for you.    

    . Please feel free to customize.  

 

2) What promises can be done by us?

  . If interested in Cup-lock Scaffolding, please feel free to write us for any QUOTE.

   . If printing required, please advise asap because the whole set need much more time to complete.

   . Please DO check goods when courier knocks your door and contact us asap if any issue.

 

3) What about of our after-sale service?

   . Response will be carried out in 24hours  after receiving any complain or request.

   . Frame-Connected Scaffolding cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.  

 

 4) What about the package and shipping time?

   .Packing:  As Customer's Requirements

    .Shipping: We have various shipping ways for our customers, such as express which including TNT,  DHL,  FEDEX, UPS, EMS, etc. ; by air/ sea, and we are VIP of these express.  

  .Shipping time:

    Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days. 

    Other mass qty of Cup-lock Scaffolding, we send them out by sea or by air to sea port or air port to save some shipping freight for our customers. By ocean, it may need 45~60days, by air, it may need 25~40days.  


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the different types of steel tubular scaffold with bowl buckle
(5) safe and reliable: the joint design, taking into account the upper bowl buckle spiral friction and self gravity, so that the connector has a reliable self-locking capacity. The load acting on the cross bar is transferred to the vertical rod through the lower bowl buckle, and the lower bowl buckle has a strong shearing force (the maximum is 199KN). Even if the upper bowl buckle is not pressed, the joint of the cross bar is not caused by an accident. At the same time equipped with a safety net support, inter bar, foot board, block board, ladder. Pick up the beam, wall support and other rod accessories, the use of safe and reliable.
Q:Buckle scaffolding problem, now used more or less
Is the rural infrastructure team? If it is because it is time-consuming, but very high security
Q:A window washer is standing on a scaffold?
Force from scaffold alone = (145/2) = 72.5N. on each rope. 675/ ((3.02/1.28)) + 1) = 200.93N. on the further rope, and (675 - 200.93) = 474.07N. on the nearer. Total tension further rope = (200.93 + 72.5) = 273.43N. Total tension nearer rope = (474.07 + 72.5) = 546.57N.
Q:Two window washers, Bob and Joe, are on a 3.00 m long, 295 N scaffold supported by two cables attached to its?
Where is the figure?
Q:What are the horizontal spacing, vertical spacing and step distance of the vertical posts of the scaffold?
The pitch is called 'step', 1.2~1.35, 1.8m, no minimum spacing, maximum 1.8m. Vertical rod spacing 1.05, 1.3, 1.55m, no minimum spacing, maximum 1.55m. See JGJ130-2011 "technical code for safety of steel tubular scaffold with couplers in construction".
Q:I would like to ask the bowl buckle scaffold operating layer is what?
The difference between the role of the first, the first is the use of indoor or roof construction scaffolding, commonly known as the full house scaffolding, mainly to play a supporting role.
Q:Hi i am 13 and going into 8th grade. i want to get a industrail piercing (scaffold)?
It is safe so long as you go to a professional. Keep in mind that many professional piercers will not pierce you until you are 14, even with parental consent. It will hurt, because it is done with a needle, and in order to get an industrial, you will have to get two holes pierced. The only things that could happen if you don't clean it properly is you could get an infection. Aside from that, if you go to someone who doesn't know what they are doing, or who pierces you with a piercing gun instead of a needle, you *could* end up with nerve damage. Research reputable shops before you get pierced!
Q:I am traveling to Buenos Aires in August. Are most of the major monuments under scaffolding now?
Hello. You can see most of everything. Not too many buildings in Restoration. The City looks well now . But Buenos Aires and generally Argentina are a mix of things. You visit Argentina and Buenos Aires for Monuments, Food, Culture, Dance and People. So....Enjoy Argentina and have fun
Q:What are the requirements for the broken seam connection of bowl buckle scaffold. For example, both sides of the seam on the vertical pole is very neat, with steel pipe
Do you mean to do the two adjacent joint? Specification requirements shall not be within the same span and within the same level, specific referenceJGJ 1302011 steel tubular scaffolding construction safety technical specification
Q:Bowl buckle type steel pipe scaffolding vertical pole bowl button node by what composition
All the components of the axial connection, good mechanical properties, the connection is reliable, the composition of the integrity of the scaffold, there is no problem of fastener loss.Structural partsThe bowl buckle steel tube scaffold is composed of steel pipe pole, cross bar, bowl buckle joint and so on. The basic structure and erection requirements and fastener type steel pipe scaffolding similar, the main difference lies in the bowl buckle joint.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range