construction building tower crane for sale

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
20 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Descriptions of our tower crane:

1, TC4808 have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition. With their working radius from 2.25 to 48m, TC4808 tower cranes are famous for their large operating ranges, varied working methods and wide uses.  

2,This series of tower cranes has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism.

3, It is original in design, reliable in operation and satisfactory in shape.

4,Equipped with all necessary safety devices, these cranes show a good speed-control capacity,, satisfactory operating stability and high work efficiency.

5,They are widely applied for the construction of high-rise hotels, resident buildings, high-rise industrial buildings, large-span factory buildings and tower like buildings like tall chimneys. Best after sales service will be offered which will get rid of all your worries in the purchase of our products

Advantage of our tower crane:

1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2, suitable for the group of tower cross homework.

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.

 

Name

Parameters

 

 

 

 

Lifting structure

Motor

Model

YZTD250M3-4/8/32

Power

24/24/5.4

Rotate speed

1420/700/140r/min

Arrester

Model

YWZ5-315/30

Arresting moment

630N.m

Hydraulic driving unit

YT1-90Z/6

Decelerator

Model

JZQ500

Center distance

500

Reduction rate

I=12.64

Steel cable

12NAT6X19 +NF1670ZS 93.14

Circumgyrating structure

Motor

Model

2-YD132S-4/8

Power

2-3.3/2.2KW

Rotate speed

1440/710

Decelerator

Model

XX4-80-195

Reduction rate

195

Arrester

DJZ-40

Hydraulic coupler

YOX250A input φ38 output φ32

Circumgyrating support

HSW.35.1250

Range adjusting structure

 

Motor

Model

YDEJ132S-4/8

Power

3.3/2.2KW

Rotate speed

1380/710

 

Decelerator

Model

BB45A

Reduction rate

I=36.13

Steel cable

 

8NAT6X19W+NF1570ZS 33.77

Top lifting structure

Motor

Model

Y132S-4 B5

Power

5.5KW

Rotate speed

1440r/min

Decelerator

Model

HSGK-160/110

Piston journey

1300

Hydraulic pump station

Work pressure 20Mpa, max. pressure 25MPa

construction building tower crane for sale

construction building tower crane for sale

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Who is responsible for the construction of the pile foundation of the tower crane?
1, the pile foundation of the pile and tower crane foundation pile is not the same item, cannot pile foundation pile and tower crane foundation pile together to talk about.2, you did not say who is tower crane?. Who is responsible for the tower crane installation, including tower crane foundation construction.3, but, in fact, in most cases, the mechanical leasing company only provides technical requirements, providing tower crane foundation section. Piling and foundation concrete are the responsibility of the contractor.4, if the contract does not have a definite agreement on the construction of the tower crane foundation, the general contractor shall be responsible for the cost of piling the tower crane foundation. The piling Team can be the construction unit of the pile foundation, and also can be found by the general contractor.5, in the future tower crane foundation construction program should be clear about this matter, avoid controversy.These are only personal opinions.
Q:How did the tower crane rise on the construction site? Fifteen
In the table below the tower crane is the upper part of the tower body has four jacks, the top of the cage tower (tower of each section is called a tower cage) a little bigger than the following (which can be installed under a small tower, heightening cage) need to jack up above "high rise to work, just a small tower added into the big cage, the cage towers bolted, or tall tower cage can be fixed.
Q:How to select tower crane type according to the height of building? Seek explanation
Choosing tower cranes is not based on height, but is based on the coverage area. The height is only a reference value. Now high-rise QTZ can be attached to the wall, so height is not a problem. Let's talk about the shape of your building, and the best of the 5
Q:What are the "2 magnification" and "4 magnification" mentioned in the lifting characteristics table of tower cranes?
Popular saying: "car to hook this section of vertical distance, you see 4 wire rope is 4 magnification, you see 2 wire rope is 2 magnification.".
Q:How to choose tower crane in engineering, such as arm length and lifting weight?
1, according to the general layout plan on the mechanical layout requirements to determine. The tower crane's arm length should be swept to the required area, otherwise the worker's formwork and materials can not be transported vertically. (tower crane is the main tool to solve vertical transportation, and auxiliary tools are derricks and double cage elevators)2. After a project has been obtained, it is important to design the layout plan of the field machinery at first. It determines the position of the tower crane and uses several tower cranes, etc. it also conforms to the requirements of economic rationality.3, we should take into account the location of the tower crane, but also take into account the length of the tower crane, but also to meet the requirements of the site construction schedule.
Q:What are the parts of a tower crane? What are their main functions?
The tower crane is mainly composed of a tower body, door frame, tower, tower cap, boom, arm and other metal structure and balance hoisting, luffing, slewing mechanism operation, composition and electrical system and safety device etc.!
Q:The special equipment specified by the state is a periodical inspection cycle, wherein the crane is carried out every many years
Special equipment including boilers and pressure vessels (including gas cylinders), pressure piping, elevator, crane, field (factory) in special vehicles, large recreation facilities, passenger ropeway, regular inspection period of their different. The periodic inspection period of hoisting machinery is usually two years.
Q:What courses should I take to buy the tower crane to be installed?
First in construction project. When the installation is completed, when it is ready to use, transfer to fixed assets account and make depreciation
Q:Tower crane four limit, two insurance, two insurance what is that?
Refers to the air switch and the electric leakage protector in the electric tray.
Q:Do self lifting tower cranes allow a small swing of the boom in jacking operation?
The upper working structure of the attached tower crane is connected with the jacking sleeve frame, and a jack jack is mounted on the top lifting jacket frame. The upper crossbeam of the jack is connected with the jacking frame, and the lower cross beam is provided with a movable claw, and the lower supporting point can fall on the step of the standard section of the tower body. During lifting, first trim jib and balance arm, unlock the top are connected with a lifting sleeve frame with the standard section, start lifting system, lifting jack will superstructure.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range