Construction Building Tower Crane for Sale TC 5012

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
100 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Structure of Tower Crane

1) TC5013A tower crane is one of the key product of cnbm company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

 

2) This kind of crane adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected; The max. attached height can reach 140m.

 

3) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

  

4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.

 

5)The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator.


Main Features of Tower Crane

1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2, suitable for the group of tower cross homework.

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.

Tower Crane Images

Construction Building Tower Crane for Sale TC 5012

Construction Building Tower Crane for Sale TC 5012

Construction Building Tower Crane for Sale TC 5012

Construction Building Tower Crane for Sale TC 5012

Construction Building Tower Crane for Sale TC 5012

Construction Building Tower Crane for Sale TC 5012

Construction Building Tower Crane for Sale TC 5012

Construction Building Tower Crane for Sale TC 5012



Tower crane Specifiction

Construction Building Tower Crane for Sale TC 5012

FAQ of Tower Crane

1.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

2. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

3.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.  


About CNBM


CNBM is the largest state owned company under central government of China that deals with building materials and construction and industrial equipment.
We are among Fortune Global 500 and No.1 in China building materials industry. We have our own factory, logistics system, e-business platform, and oversea warehouse. Our products meet international quality standard.
For more information about us you can go to our official website icnbm dot com and okorder dot com.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How to build a basic electric magnetic crane.?
To push an object away, you need equipment that is low to the ground when it applies the force. Bulldozers are designed to push objects. Electromagentic cranes are designed to deal with vertical forces, so they are used to lift and drop metal objects. They use electricity to flow through coils wrapped around a metal core to generate a strong magnetic field. Trying to use them to push things could cause a crane to tip over since they are not designed to deal with horizontal forces. Even if you could get the electromagnet wired to repel metal objects, when you bring the electromagnet near the object, it would repel away in an unwieldy manner because of friction and interference with the ground. And trying to direct a large electromagnet at the end of a long chain would be difficult.
Q:Girls name for the last name Crane?
How about Emma Liliana Crane? I think that's really beautiful!!! Or to make the name Lily flow better with the last name, what about Liliana Crane? This way, when people say her name, it will flow really well, but you can still call her Lily all of the time. I think that would be absolutely BEAUTIFUL!!!!! Liliana Faith Crane would be gorgeous if you need a middle name suggestion. Hope this helped and best wishes =)
Q:Method for operating tower crane
In the 2.11 operation, when lifting the weight, the weight should be higher than the height of the obstacle, at least 100mm.2.12 when the crane is approaching the track limit, it should slow down and stop in advance.2.13 when lifting heavy objects, not heavy lifting suspension instability, no additional weight in lifting objects, lifting scattered materials or special-shaped components must be used when the wire rope firmly tied to heavy lifting from the ground about 50cm stop, determine the brake materials, lashing and rigging, confirmation before lifting command.2.14 cranes must be adequately illuminated at night.2.15 crane in the stop, rest or midway power failure, the weight should be unloaded, not to weight suspended in the air.2.16 the operating room, no personnel shall enter, prohibited flammable and impede the operation of the items.2.17 is strictly prohibited or promotion personnel riding crane. Landing weight, weight is prohibited to stand.2.18 the boom and lifting pieces of cranes must be in safe distance from overhead transmission lines, and shall comply with the provisions of this schedule 30.1.6.2.19, two cranes in a track or two parallel or vertical orbit on the operation, should maintain the safety of any part of the distance between two machines, the minimum shall not be less than 5m.2.20 in case of any of the following circumstances, suspension operation shall be suspended:1., in the event of bad weather, such as heavy rain, heavy snow, fog and construction work surface has six (including six) above the strong winds, affecting safety construction.2. crane leakage occurs.3. serious wear of wire rope, to scrap standard (wire rope scrap standard see Appendix A).4. safety guards fail or display inaccurate.
Q:why the new york cranes collapsed?
Gravity, that's basically why all things collapse. With cranes you also tend to have the issue of them being overloaded also but at the end of the day it's still gravity that's the enemy. There is some talk of a supporting strut having been damaged by a piece of falling metal and the crane toppling as a result of that but it's the first time I've ever come across a piece of lifting equipment, and that's what a crane is, reliant on just one component to keep it standing up. Always remember that gravity thing is out to get you.
Q:What kind of white crane Kung fu styles are there?
Fujian White Crane is short stances, short hands and close range fighting system. The other white crane is said to be from Tibet but developed in Guang Dong, southern part of China, and Hong Kong. This style emphases on deep stances, long arm movements attacks. Both of them are great styles. Steak and Lobster. which one is the best to eat? Your pick!
Q:When the tower crane foundation is found, what should be discontinued?
The settlement, inclination and cracking of tower crane foundation can affect the stability of tower crane and should be stopped
Q:What is the insulation resistance of tower crane?
Two. Safety regulations for tower cranes GB 5144 - 20068.1.3 tower crane metal structure, track, all electrical equipment metal shell, metal line pipe, safety lighting transformer, low voltage side should be reliable grounding, grounding resistance is not more than 4 ohms. Repeated earthing resistance is not greater than l0. The selection and installation of the earthing device shall comply with the relevant requirements of the electrical safety.The insulation resistance of the 8.1.7 main circuit and control circuit shall not be less than 0.5M ohm.
Q:A crane mounted on truck droped the cargo on the truck itself, Is claim for damage to the truck valid?
try okorder.com/
Q:How do they get those big tower cranes down after they set it up at a onstruction site?
they are put up section by section with another crane
Q:Is there a crane lifting chart where I can enter info. to determine what size crane I need, if so where?
the 1st answerer, Irv S, is right. You need to call a craning service. They should be able to give an estimate for crane size based on what you tell them. You will need to know what your Load weighs. How high in the air the crane will have to lift it. ....Putting a swimming pool in the back yard is completely different ....than putting that same swimming pool up on top of a 15 story ....building. How close to the Load can the crane park? Or how far you need the LOAD moved. What a crane can lift, even if it a 100 ton crane is based on how far the crane has to reach to pick up the load and how much the crane has to rotate to place the load. The angle the crane boom goes to, etc. Our 15 ton PH crane can lift 30 thousand pounds at 10 feet from the Turning center. And only a 1,000 pounds or less if the boom is fully extended with the Jib on, that is 125 feet away from the turning center of the crane. Distance is critical! They will probably need to see the work site to give a really accurate answer. Wingman

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range