Concrete Pumps Spare Parts S Valve S2018N

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1 pc
Supply Capability:
1000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Product Description:

The PM Z Type Concrete Pumps Spare Parts S Valve  S2018N normally made by steel material No.ST52, 20#, 37MN5, Q235B according to customer’s requests, and also package in bundles or nude packing directly put into container.

Scope of Application of the pipes

The PM Z Type Concrete Pumps Spare Parts S Valve  S2018N is a concrete vavle  for combined use with other concrete pipelines in concrete placement operations. It can be widely used in the construction of various types of concrete structures like industrial and civil buildings, bridges, roads, and other types of infrastructure.

This pipes can only be used for  concrete pumps and truck pumps, but not in any other machines, like crane, loader and other road machinery.

 

Product Advantages:

OKorder's  Concrete Pumps Spare Parts S Valve  S2018N Channels are durable, strong, and safety.

 

Main Product Features:

·    Premium quality

·    Prompt delivery & seaworthy packing (5-10 days)

Reliable performance

Easy to weld

High safety.

·    Professional Service

·    Competitive pricing

   Measuring of wall thickness from the outside

   Low purchase cost

Specifications:

CNBM No.

2201808

Original No.

251013 008 

Description

S Valve

Remark

S2018N

 

FAQ:

 

Q1: How long about delivery time  Concrete Pumps Spare Parts S Valve  S2018N ?

A1: Normally we keep the raw materials for old customers and sometime we also keep stock products to make sure delivery time in any emergency cases.

Q2: How do we guarantee the quality of our  Concrete Pumps Spare Parts S Valve  S2018N ?

A2: We have established an advanced quality management system which conducts strict quality tests at every step, from raw materials to the final product. At the same time, we provide extensive follow-up service assurances as required.

Q3: How soon can we receive the product after purchase?

A3: Within three days of placing an order, we will book the vessel for goods. The specific shipping date is dependent upon international and government factors, but is typically 7 to 30 workdays.

Q4: If we can produce some pipes according to customers request?

A4: Yes, we can produce S Vavle  according to the difference country situations to make it suitable to the market and customers. We have very professional technical team to make the design.

Q5: How to make a quick resolution for after service?

A5: OKorder and our manufacture both have overseas branches all-around of world.


Concrete Pumps Spare Parts S Valve  S2018N

Concrete Pumps Spare Parts S Valve  S2018N

Concrete Pumps Spare Parts S Valve  S2018N

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How to operate the concrete pump?
Start the position, adjust the handle, hand wheel, control lever, cock and so on. They should be in the correct position. The hydraulic system should be normal without leakage
Q:How to calculate the power of concrete pump motor
The performance of the random type varies depending on the type and structure of concrete pump truck building, in addition to considering the choice of models into the concrete pouring amount, should also consider the building type and structure, technical requirements, construction site conditions and environment etc.. The main performance parameters of the concrete pump vehicle should be in line with the construction requirements or slightly larger. If the capacity is too large, the utilization rate is low, too small, not only can not meet the requirements, but also will accelerate the loss of the concrete pump truck.
Q:How can the concrete pump be installed and used?
Evacuate the surrounding area while dredging the pipe. Remove pipe before cleaning should be taken to counter method, clear pipeline pressure. The pipe mouth is not allowed to disassemble
Q:Is the main pump of the concrete pump electric control or hydraulic control?
The main pump behind the oil pump to provide the size of the oil with the greater the current the higher the higher the higher the displacement,
Q:What is the concrete delivery pump?
Concrete pump, also called concrete pump, consists of pump body and pipe
Q:Why would the plugging concrete pump pipe
When it is found that a bucket of concrete slump is very small, can not pump, should be in time the concrete from the bottom of the hopper release, if seeking trouble, forced pumping, easy to cause blockage. Avoid stirring with water in the hopper
Q:If the concrete pump valve jam how to judge and deal with?
When the pipe is blocked, the pump shall be taken repeatedly, reversing the pump, and gradually pump the concrete at the pump's outlet back to the hopper and mix again
Q:What are the causes of pipe blockage in concrete pump?
Therefore, in the JGJ/T10-95 "concrete pumping construction technical regulations," stipulated that the sand through the 0.315mm sieve shall not be less than 15%.
Q:How to calculate the power of concrete pump motor?
First of all, the length of the pipe and pipe diameter and the motor power is basically nothing to do!
Q:What kind of concrete pump truck?
At present, I know the pump mainly has the arm pump. This kind of arm work is flexible. Relatively fast speed. But the cost of maintenance and use is relatively high. Height limit. There are many requirements for the site

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range