Concrete Pumps Spare Parts Elbow 90 DEG EXT 100MM

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
20 pc
Supply Capability:
1000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Product Description:

The Concrete Pumps Spare Parts Elbow 90 DEG EXT 100MM  normally made by special MN13-4,   to make sure the quanlity of elbows according to customer’s requests we usually  keep the content of MN strictly over 15%, it will have a longer life as well, package will be in plywood box or cartons and put into container.

Scope of Application of the Goods

The  Concrete Pumps Spare Parts Elbow 90 DEG EXT 100MM  is a concrete pumps parts  for combined use with other concrete parts in for concrete pumps and truck pumps. It can be widely used in the construction of various types of concrete structures like industrial and civil buildings, bridges, roads, and other types of infrastructure.

This seals can only be used in Schwing type concrete pumps and truck pumps as well, but not in any other operations.

 

Product Advantages:

OKorder's  Concrete Pumps Spare Parts Elbow 90 DEG EXT 100MM  Channels are durable, strong, and safety.

 

Main Product Features:

·    Premium quality

·    Prompt delivery & seaworthy packing (5-10 days)

Reliable performance

Easy to weld

High safety.

·    Professional Service

·    Competitive pricing

   Measuring of wall thickness from the outside

   Low purchase cost

Specifications:

R275 90DEG EXT 100MM twin wall layers

Capacity Life: 50,000 cbm


FAQ:

Q1: How long about delivery time  Concrete Pumps Spare Parts Elbow 90 DEG EXT 100MM ?

A1: Normally we keep the raw materials for old customers and sometime we also keep stock products to make sure delivery time in any emergency cases.

Q2: How do we guarantee the quality of our  Concrete Pumps Spare Parts Elbow 90 DEG EXT 100MM ?

A2: We have established an advanced quality management system which conducts strict quality tests at every step, from raw materials to the final product. At the same time, we provide extensive follow-up service assurances as required.

Q3: How soon can we receive the product after purchase?

A3: Within three days of placing an order, we will book the vessel for goods. The specific shipping date is dependent upon international and government factors, but is typically 7 to 30 workdays.

Q4: If we can produce some goods according to customers request?

A4: Yes, we can produce Elbow 90 DEG EXT 100MM  according to the difference country situations to make it suitable to the market and customers. We have very professional technical team to make the design for porduction of seals.

Q5: How to make a quick resolution for after service?

A5: OKorder and our manufacture both have overseas branches all-around of world.




Concrete Pumps Spare Parts Elbow 90 DEG EXT 100MM

Concrete Pumps Spare Parts Elbow 90 DEG EXT 100MM

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How to operate the concrete pump?
Start the position, adjust the handle, hand wheel, control lever, cock and so on. They should be in the correct position. The hydraulic system should be normal without leakage
Q:What are the skills of concrete pump?
According to the characteristics of the construction site and concrete pouring plan piping, piping design to check the level of the pipeline, conversion distance and the concrete pump pumping distance to adapt
Q:What is the concrete delivery pump?
Another is a pump consisting of a pump body mounted on an automobile chassis and fitted with retractable or bent cloth poles.
Q:What is the difference between concrete pump and ground pump?
The pump is easy to move and flexible, but generally limited to the length of the boom by 60-70m. The ground pump is not limited by height, but it needs to be connected with the conveying pipe, which is of poor flexibility
Q:How is the piping of the concrete pipe designed?
When pumping underground structures, the horizontal axis of the ground shall be perpendicular to the axis of the Y - shaped discharge port
Q:What is the first generation pumping technology of concrete pump?
The machine assembly is simple and the production cost is low, but the electrical control is complex
Q:What are the preventive measures for concrete pump?
First, the ratio of the maximum particle size to the diameter of the coarse aggregate should be determined
Q:What are the precautions for gas washing of concrete pump?
During gas cleaning, the personnel shall not be close to the outlet of the discharge pipe, the pipe is turned sharply (if 90 bends) and the compressed air pipe is connected
Q:What are the types of concrete pumps?
According to the power type is divided into electric concrete pump and diesel power concrete pump
Q:What is the name of the pump for concrete transportation?
The concrete name of concrete pump is concrete pump truck. Concrete pump truck is a kind of machine which can transport concrete along pipeline continuously by pressure. It is composed of pump body and conveying pipe.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range