Concrete Pump Truck Parts Elbow Bend R180 DN112 148Flange 90DGR Casting

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
140 pc
Supply Capability:
10000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Product Description:

Widely used on concrete pump truck, concrete placing boom, trailer concrete pump etc, for concrete delivery pipe connection. 
Our concrete pump bends have been successfully exported to many countries from 1998, Our main markets as below: Middle East, Southeast Asia, America, Brazil, Italy, Russia, South Africa etc


Main Product Features:

1. Adopt the new plasma quenching and chromium plating process, which increases the concrete conveying life and reduces the frequency of replacement, saving the cost for the customers.

2. Service life: 55000-150000 CBM Concrete. The inner side of this concrete pump elbow undergoes heat treatment, and then the hardness can reach 68HRC.

3. Possess quality certification of ISO 9001:2000. Can pass CE test.

4. We have been providing parts for nearly ten years, and cooperting with the agent of the world famous brand, possess near every kind of elbow in the market.

5. We can supply OEM service and can also produce according to your requirements.

6. Total series of concrete pump ELBOW for different brand concrete pump(PUTZMEISTER, SCHWING, CIFA, SANY, ZOOMLION, IHI, KYOKUTO Etc) available from us.


Product Specifications:

Technology: Cast

Dimension: DN112

Radius: 180mm

Degree: 90D

Material: Mn13-4

Characteristics: According to our technology, the cast elbow also has high working pressure and burst pressure. 

Package: Put in one seaworthy wooden box, and 20 boxes in one 20feet container.


FAQ:

Q1: How to confirm that your elbows could be used in our pump?

A1: We have been providing parts for nearly ten years, and cooperting with the agent of the world famous brand, possess near every kind of elbow in the market. What is more, we can produce as the customers request with drawing provided.

Q2: How do we guarantee the quality of our products?

A2: We have established an advanced quality management system which conducts strict quality tests at every step, from raw materials to the final product. 

Q3: How soon can we receive the product after purchase?

A3: Within three days of placing an order, we will begin production. The specific shipping date is dependent upon international and government factors, but is typically 10 to 20 workdays.

Q4: If we can produce some Concrete Pump Truck Parts according to customers request?

A4: Yes, we can produce Concrete Pump Truck Parts according to the difference country situations to make it suitable to the market and customers. We have very professional technical team to make the design.

Q5: How to make a quick resolution for after service?

A5: OKorder and our manufacture both have overseas branches all-around of world, IF needed, the seller shall dispatch 2 engineers to the buyer's site for supervision of training. The buyer shall make available of necessary facilities & skilled personnel at site for training.


Concrete Pump Truck Parts Elbow DN112 R180 90DGR 148MM Mn13-4 Casting

Concrete Pump Truck Parts Elbow DN112 R180 90DGR 148MM Mn13-4 Casting

Concrete Pump Truck Parts Elbow DN112 R180 90DGR 148MM Mn13-4 Casting

Concrete Pump Truck Parts Elbow DN112 R180 90DGR 148MM Mn13-4 Casting

Concrete Pump Truck Parts Elbow DN112 R180 90DGR 148MM Mn13-4 Casting

Concrete Pump Truck Parts Elbow DN112 R180 90DGR 148MM Mn13-4 Casting

Concrete Pump Truck Parts Elbow DN112 R180 90DGR 148MM Mn13-4 Casting

Concrete Pump Truck Parts Elbow DN112 R180 90DGR 148MM Mn13-4 Casting


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the skills of concrete pump?
According to the characteristics of the construction site and concrete pouring plan piping, piping design to check the level of the pipeline, conversion distance and the concrete pump pumping distance to adapt
Q:How can the concrete pump pipe be cleaned?
Slowly open the compressed air intake valve, compressed air will sponge ball and concrete extrusion, if the pipeline is equipped with stop valve, should first hit in the open position, and then open the valve
Q:How to diagnose the blockage in the inlet of concrete pump?
Make the pump reverse running to destroy the caking, return the concrete to the hopper, stir it again, and then pump it forward
Q:How does the concrete pump work?
Pump in place should be flat and solid, without obstacles around, no overhead transmission line. The pump shall not be parked on the slope.
Q:What is the farthest pumping distance of concrete pump truck?
Concrete pump truck, according to the length of the pump boom to determine the pumping height, usually the last 2 arm combination pumping
Q:What are the functions of concrete pump truck?
Concrete large transport equipment, used in high-rise buildings, high-speed, overpass and other large concrete works of concrete transmission.
Q:What are the layout requirements of concrete pump for building engineering?
When more than one concrete pump or pump truck is pouring at the same time, the selected location should be the closest to each other. It is better to pour the concrete at the same time, so as to avoid retaining the construction joint.
Q:How to calculate the power of concrete pump motor
Concrete casting factors, concrete pump truck selection should be based on concrete engineering objects, characteristics, the requirements of the maximum transmission distance, concrete construction plan, concrete pump form and concrete conditions for comprehensive consideration
Q:How is the piping of the concrete pipe designed?
Concrete transmission pipe, according to the project and construction site characteristics, concrete pouring plan piping. Should shorten the length of the pipeline, less elbow and hose. The laying of the transmission pipe shall ensure safe construction, easy cleaning of the pipeline, troubleshooting and installation and maintenance
Q:How to judge the concrete pipeline blockage?
Judgment of blocking position: blockage usually occurs in bends, cones, and vibrating sections. At this point, the hammer can be beaten along the pipe, the sound is boring, blocking the place; sound crisp place is normal

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range