Concrete Pump Truck Parts Elbow Bend DN125 R180 90DGR 148MM Mn13-4 Casting

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the performance characteristics of concrete pump?
The use of advanced S pipe distribution valve, automatic compensation for wear clearance, good sealing performance
Q:How is the piping of the concrete pipe designed?
Vertical upward piping, the ground level pipe length shall not be less than 1/4 of the vertical pipe length, and shall not be less than 15m, or comply with the provisions of the product manual. A stop valve shall be provided at the root of the conveying pipe of the concrete pump Y - shaped pipe discharge port 3 - 6m, so as to prevent the concrete mixture from flowing back
Q:What is the first generation pumping technology of concrete pump?
The machine assembly is simple and the production cost is low, but the electrical control is complex
Q:In general, how much concrete will be transported per hour for the concrete pump and the pump?
Day pump, usually with concrete tank car, a jar of 9 cubic meters, unloading 7-10 minutes to completeDay pump, usually with concrete tank car, a jar of 9 cubic meters, unloading 7-10 minutes to complete
Q:When concrete is poured, how high can the concrete pump be put?
General building pouring concrete, height of automobile pump for the arm length minus 20 meters (consider horizontal movement of pump truck, leaving the house distance consumed that is to say, the arm length) 40 meters long arm pump car is 20 meters high, 60 meters long arm pump car for the height of 40 meters
Q:What are the specifications for concrete delivery pumps?
The pressure of each safety valve of the hydraulic system of concrete pump shall comply with the requirements of the manual, and the user shall not adjust the change
Q:If the concrete pump valve jam how to judge and deal with?
When the pipe is blocked, the pump shall be taken repeatedly, reversing the pump, and gradually pump the concrete at the pump's outlet back to the hopper and mix again
Q:What are the types of concrete pumps?
The pump body and the conveying pipe are made up of. It is divided into piston type, extrusion type and water pressure diaphragm type according to the structure
Q:How to judge the concrete pipeline blockage?
Listen to the ear, there is rustling sound as normal, there is a piercing sound for the blockage
Q:What is the washing process of the concrete pump pipe?
Anti pump action a few times, release the pipe pressure, cut off the power supply

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range