Concrete Pump Truck Parts Delivery Pipe Hardened Pipe DN125 3MTR Thick 4.5MM

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
100 pc
Supply Capability:
10000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Product Description:

Widely used on concrete pump truck, concrete placing boom, trailer concrete pump etc, for concrete delivery pipe connection. 
Our concrete pump pipes have been successfully exported to many countries from 1998, Our main markets as below: Middle East, Southeast Asia, America, Brazil, Italy, Russia, South Africa etc.


Main Product Features:

  1.   High Chromium and manganese content, which enables a higher wear resisting ability and longer lifetime.

  2. Service life:7000-80000 CBM Concrete.

  3. Possess quality certification of ISO 9001:2000. Can pass CE test. 

  4. A wide range of specifications for you.

  5. We can supply OEM service and can also produce according to your requirements. 

  6. Total series of concrete pump pipes for different brand concrete pump(PUTZMEISTER, SCHWING, CIFA, SANY, ZOOMLION, IHI, KYOKUTO Etc) available from us. 


Product Specifications:

Dimension: DN125

Length: 3m

Thickness: 4.5mm

Material: ST52

Weight: 43kg

Characteristics: double-ends flange

Package: Seaworthy packing or as customers’ request.


FAQ:

Q1: How to confirm that your pipes could be used in our pump?

A1: We have been providing parts for nearly ten years, and cooperating with the agent of the world famous brand, possess near every kind of pipe in the market. What is more, we can produce as the customers’ request with drawing provided.

Q2: How do we guarantee the quality of our products?

A2: We have established an advanced quality management system which conducts strict quality tests at every step, from raw materials to the final product. 

Q3: How soon can we receive the product after purchase?

A3: Within three days of placing an order, we will begin production. The specific shipping date is dependent upon international and government factors, but is typically 5-15 workdays.

Q4: If we can produce some Concrete Pump Truck Parts according to customers request?

A4: Yes, we can produce Concrete Pump Truck Parts according to the difference country situations to make it suitable to the market and customers. We have very professional technical team to make the design.

Q5: How to make a quick resolution for after service?

A5: OKorder and our manufacture both have overseas branches all-around of world, IF needed, the seller shall dispatch 2 engineers to the buyer's site for supervision of training. The buyer shall make available of necessary facilities & skilled personnel at site for training.




Concrete Pump Truck Parts Delivery Pipe Hardened Pipe DN125 3MTR Thick 4.5MM


Concrete Pump Truck Parts Delivery Pipe Hardened Pipe DN125 3MTR Thick 4.5MM



Concrete Pump Truck Parts Delivery Pipe Hardened Pipe DN125 3MTR Thick 4.5MM

Concrete Pump Truck Parts Delivery Pipe Hardened Pipe DN125 3MTR Thick 4.5MM

Concrete Pump Truck Parts Delivery Pipe Hardened Pipe DN125 3MTR Thick 4.5MM

Concrete Pump Truck Parts Delivery Pipe Hardened Pipe DN125 3MTR Thick 4.5MM


Other Products  :


Concrete Pump Truck Parts Delivery Pipe Hardened Pipe DN125 3MTR Thick 4.5MM

Concrete Pump Truck Parts Delivery Pipe Hardened Pipe DN125 3MTR Thick 4.5MM

Concrete Pump Truck Parts Delivery Pipe Hardened Pipe DN125 3MTR Thick 4.5MM

Concrete Pump Truck Parts Delivery Pipe Hardened Pipe DN125 3MTR Thick 4.5MM

Concrete Pump Truck Parts Delivery Pipe Hardened Pipe DN125 3MTR Thick 4.5MM


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How to calculate the power of concrete pump motor
The performance of the random type varies depending on the type and structure of concrete pump truck building, in addition to considering the choice of models into the concrete pouring amount, should also consider the building type and structure, technical requirements, construction site conditions and environment etc.. The main performance parameters of the concrete pump vehicle should be in line with the construction requirements or slightly larger. If the capacity is too large, the utilization rate is low, too small, not only can not meet the requirements, but also will accelerate the loss of the concrete pump truck.
Q:What do these types of concrete pumps mean?
HBT represents the ground pump (tow pump). 80 represents the theoretical throughput per hour, and 16 is the maximum outlet pressure of 16 MPa
Q:What are the performance characteristics of concrete pump?
The use of advanced S pipe distribution valve, automatic compensation for wear clearance, good sealing performance
Q:How to deal with the blockage in the outlet of the distributing valve of the concrete pump?
Pour the grout into the hopper, turn the pump in and out again and again, forcing the passage to open
Q:What are the preventive measures for concrete pump?
In order to ensure the continuity of pumping concrete operation, and ensure the quality of concrete pouring, the interval between the operations should not be too long, so as to prevent clogging.
Q:In general, how much concrete will be transported per hour for the concrete pump and the pump?
The length of day pump 36-62m, the efficiency has little effect, regular work is generally 30-40 cubic / hour
Q:Why would the plugging concrete pump pipe
When it is found that a bucket of concrete slump is very small, can not pump, should be in time the concrete from the bottom of the hopper release, if seeking trouble, forced pumping, easy to cause blockage. Avoid stirring with water in the hopper
Q:When concrete is poured, how high can the concrete pump be put?
The car pump arm is long, traffic roads, the required pump stop position is bigger, so there are a lot of the site can not be use pump more than 60 meters (60 meters of general automobile pump, stop the pump and the leg position width of about 14 meters)
Q:What are the fittings of concrete pump?
Hydraulic oil, eye plates, cutting rings (when the equipment reaches 5000 or more sides can be prepared) and so on
Q:What is the washing process of the concrete pump pipe?
Before the end of the pump, it is necessary to pump the fine stone concrete in the hopper as much as possible

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range