Concrete Pump Truck Parts Bend DN125 R1000 45DRG

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
100 pc
Supply Capability:
10000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Product Description:

Widely used on concrete pump truck, concrete placing boom, trailer concrete pump etc, for concrete delivery bend connection. 
Our concrete pump bends have been successfully exported to many countries from 1998, Our main markets as below: Middle East, Southeast Asia, America, Brazil, Italy, Russia, South Africa etc.


Main Product Features:

  1. High Chromium and manganese content, which enables a higher wear resisting ability and longer lifetime. 

  2. We have been providing parts for nearly ten years, and cooperating with the agent of the world famous brand, possess near every kind of bend in the market. 

  3. Possess quality certification of ISO 9001:2000. Can pass CE test.

  4. The inner side of this concrete pump bends undergo heat treatment, and then the hardness can reach 62HRC. 

  5. OEM service available. 

  6. Fitting to PUTZMEISTER, SCHWING Sany, Zoomlion  concrete pumps


Product Specifications:

Technical: Casting

Radius: 1000mm

Degree: 45

Material: Mn13-4

Characteristics: According to our technology, the casting bends also has high working pressure and burst pressure. 

Package: PP woven bag and plastic cap


FAQ:

Q1: How to confirm that your bends could be used in our pump?

A1: We have been providing parts for nearly ten years, and cooperating with the agent of the world famous brand, possess near every kind of bend in the market. What is more, we can produce as the customers’ request with drawing provided.

Q2: How do we guarantee the quality of our products?

A2: We have established an advanced quality management system which conducts strict quality tests at every step, from raw materials to the final product. 

Q3: How soon can we receive the product after purchase?

A3: Within three days of placing an order, we will begin production. The specific shipping date is dependent upon international and government factors, but is typically 5-15 workdays.

Q4: If we can produce some Concrete Pump Truck Parts according to customers request?

A4: Yes, we can produce Concrete Pump Truck Parts according to the difference country situations to make it suitable to the market and customers. We have very professional technical team to make the design.

Q5: How to make a quick resolution for after service?

A5: OKorder and our manufacture both have overseas branches all-around of world, IF needed, the seller shall dispatch 2 engineers to the buyer's site for supervision of training. The buyer shall make available of necessary facilities & skilled personnel at site for training.


Concrete Pump Truck Parts Bend DN125 R1000 45DRG

Concrete Pump Truck Parts Bend DN125 R1000 45DRG

Concrete Pump Truck Parts Bend DN125 R1000 45DRG

Concrete Pump Truck Parts Bend DN125 R1000 45DRG

Concrete Pump Truck Parts Bend DN125 R1000 45DRGConcrete Pump Truck Parts Bend DN125 R1000 45DRG

Other Products:

Concrete Pump Truck Parts Bend DN125 R1000 45DRG

Concrete Pump Truck Parts Bend DN125 R1000 45DRG

Concrete Pump Truck Parts Bend DN125 R1000 45DRG

Concrete Pump Truck Parts Bend DN125 R1000 45DRG

Concrete Pump Truck Parts Bend DN125 R1000 45DRG

Concrete Pump Truck Parts Bend DN125 R1000 45DRG




Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What do these types of concrete pumps mean?
HBT represents the ground pump (tow pump). 80 represents the theoretical throughput per hour, and 16 is the maximum outlet pressure of 16 MPa
Q:What are the functions of concrete pump truck?
Concrete pump truck is mainly used in building, bridge and tunnel construction. Currently mainly divided into gate valve, concrete pump and S valve concrete pump.
Q:How to deal with the blockage in the outlet of the distributing valve of the concrete pump?
If this method does not dare, it can only be manually removed, remove the connecting pipe, remove the debris in the valve.
Q:How is the piping of the concrete pipe designed?
Concrete transmission pipe, according to the project and construction site characteristics, concrete pouring plan piping. Should shorten the length of the pipeline, less elbow and hose. The laying of the transmission pipe shall ensure safe construction, easy cleaning of the pipeline, troubleshooting and installation and maintenance
Q:How to diagnose the blockage in the inlet of concrete pump?
If it doesn't work, you'll have to clean it up manually and rule it out.
Q:How to choose concrete pump?
The actual export pressure of concrete pump and the actual product per hour, the greater the value, the greater the capacity index, the power of the motor will be greater, thus achieving the purpose of large displacement, high lift
Q:When concrete is poured, how high can the concrete pump be put?
General building pouring concrete, height of automobile pump for the arm length minus 20 meters (consider horizontal movement of pump truck, leaving the house distance consumed that is to say, the arm length) 40 meters long arm pump car is 20 meters high, 60 meters long arm pump car for the height of 40 meters
Q:What is the farthest pumping distance of concrete pump truck?
Now the domestic pump to achieve the highest pump height, the largest is ZOOMLION made 80 m carbon fiber boom pump, but also to achieve the pump Guinness world record
Q:How does the concrete pump work?
When the pump is in place, support the leg and keep the body level and stable. When feeding with a distributor, the body shall not exceed 3 degrees of inclination
Q:What is the name of the pump for concrete transportation?
The power of the concrete pump truck engine power is transmitted to the hydraulic pump or rear axle through the power transfer case, push the piston to drive the hydraulic pump concrete pump. Then use the pump cloth on the rod and delivery pipe, the concrete delivery to a certain height and distance.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range