Concrete Pump Truck Mounted with China
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 PCS
- Supply Capability:
- 1500 PCS/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Concrete Pump Truck Mounted with China
Product Details
Basic Info.
Model NO.:HB56
Type:Compacting Equipment
Machining Process:Hydraulic
Certification:ISO9001: 2000, CE
Condition:New
Export Markets:Global
Additional Info.
Trademark:JUNYU
Packing:Nude
Standard:CE
Origin:Shanghai
HS Code:8705909090
Production Capacity:Hb56
Product Description
Travel | |||
Category | Item | Unit | Parameter |
Chassis | Model | FM440 | |
Manufacturer | VOLVO | ||
Max. speed | km/h | 90 | |
Max. gradeability | 38% | ||
Min. turning diameter | m | 27.4 | |
Brake distance | m | ≤10 | |
Wheelbase | mm | 1995+5205+1370+1450 | |
Tread (front/rear) | mm | 2028/1872 | |
Approach angle/departure angle | . | 18/11 | |
Min. clearance | mm | 270 | |
Tyre specification | 12.00R20 | ||
Engine | Model | D13 | |
Output power | kw/(r/min) | 324/1400~1800 | |
Max. torque | N.m/(r/min) | 2200/1050~1400 | |
Displacement | l | 12.8 | |
Emission Standard | Nation III GBIII | ||
Others | Dimension (Length×Width×Height) | mm | 14885×2500×3990 |
Total vehicle weight | kg | 49750 | |
Fuel tank capacity | l | 410 | |
Fuel consumption per 100km | l/100km | 50 | |
Pumping operation | |||
Pumping system | Theoretical output(high pressure/low pressure) | m3/h | 100/163 |
Concrete pumping pressure(high pressure/low pressure) | Mpa | 13/8 | |
Theoretical pumping times(high pressure/low pressure) | /min | 13/21 | |
Max. diameter of pumping concrete aggregate | 40 | ||
Feeding height | 1530 | ||
Placing boom | Pumping slump range | 12-23 | |
Reach height | 55.7 | ||
Reach depth | 44 | ||
Slewing radius | 51.7 | ||
Slewing angle | 364 | ||
1st boom stretch angle | 96 | ||
2nd boom stretch angle | 180 | ||
3rd boom stretch angle | 180 | ||
4th boom stretch angle | 180 | ||
5th boom stretch angle | 260 | ||
Outrigger span | Overall outrigger span | 11250±50 | |
Front outrigger transverse span | 11400±50 | ||
Rear outrigger transverse span | 11300±50 | ||
Others | Dosing type | S valve | |
Lubricating method | Automatic lubrication | ||
Controlling method | Manual/remote control | ||
Water tank capacity | 700 | ||
Max. pressure of water pump | 2 |
- Q:Concrete pump truck hydraulic system open and closed the advantages and disadvantages of what
- To meet this condition, the system's actuator is usually a hydraulic motor or a reciprocating pair of cylinders.
- Q:How to achieve the concrete pump pendulum for the change?
- The main cylinder on the concrete pump commutation / swing cylinder commutation is by the proximity switch or trip switch to complete.
- Q:What is the difference between a concrete day pump and a ground pump?
- Concrete pump is through the pipeline to rely on the pressure to transport concrete construction equipment, it can be a continuous horizontal transmission and vertical transport, is the existing concrete transportation equipment in a more ideal, it will be ready-mixed concrete production and pumping construction phase
- Q:How wide concrete pump truck four support steel feet stretch ?
- Take Xugong - pump truck 37 meters 48 meters 52 meters as an example to answer you
- Q:How to choose concrete pump concrete pump
- 3. Construction adaptability The concrete pump is flexible, and the higher the height of the boom, the greater the casting height and the radius of the fabric, the greater the adaptability of the construction, the construction should be used in the high-beam concrete pump.
- Q:What is the difference between the concrete pump and the concrete pump?
- The concrete pump is retrofitted on a truck chassis, which is equipped with a sports and powertrain, a pump and a stirrer, a cloth, and other auxiliary devices on the chassis. The power of the concrete pump through the power transfer box to the engine power transmission to the hydraulic pump or rear axle, hydraulic pump to promote the piston to drive
- Q:What is the cause of concrete pump blockage?
- When the above two methods can not rule out the plug, the concrete pump can be removed after the removal of the plugging parts of the pipe, discharge concrete blockage, and then take over the pump.
- Q:How to deal with pumping concrete pump pipe pipe burst after the burst, the pump can not stop the situation?
- Some poor concrete, stop half an hour afraid of blocking the pump, some four hours are all right.The past is relatively poor concrete, stop the pump to block the pump
- Q:How much concrete pump power
- Concrete pump is through the pipeline to rely on the pressure to transport concrete construction equipment, it is equipped with special pipes, concrete can be carried out along the pipeline horizontal and vertical transport, is the existing concrete transport equipment in an ideal one, it
- Q:How much concrete construction is needed for concrete pump construction
- The concrete pump uses the pressure to transport the concrete along the pipe continuously.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Concrete Pump Truck Mounted with China
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 PCS
- Supply Capability:
- 1500 PCS/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
New products
Hot products
Related keywords